... CFM and capacity of equipments to be placed accordingly Drafted and Designed a two floor commercial building’s duct work and piping system using AutoCAD that includes Toilet & Kitchen Ventilation, Stairwell Pressurisation System, Car Parking ...
- 2017 Oct 01
Columbus, OH
... - Final grade for the project is 93 out of 100 Experimental Analysis of a Fluid Pipe Line - Collaborated with three team members to complete an engineering analysis for a piping system and its elements. - Major parameters such as energy and head ...
- 2017 Jul 31
Columbus, OH
... Essential Oil Extraction via Steam Distillation May 2017 to Present Ground up experimental design and testing on the effects of pre-treatment on the extraction of essential oils using steam distillation. Spearheaded equipment acquisition, ...
- 2017 Jun 06
Columbus, OH
... - Pune, India Nov 2005 – Nov 2007 Forbes Marshall is a global company that manufacturers and markets several products in field of steam engineering and control instruments Software Engineer – (Support and Implementation) Application/Tools/Database: ...
- 2017 Apr 17
Columbus, OH
... and II, April 09, 92 percent • OSHA 10 • Universal and International code for plumbing • Measure, cut, clean, and thread pvc and galvanized piping • Install sinks, toilets, lavatories, and DWV piping Road master Trucking school -- CDL class A, 1999
- 2017 Apr 08
Reynoldsburg, OH
... ISO designed for fabrication during Sinclair Refinery (Casper Wyoming) turn-around (shut down) phase. Assisting the Project ... Designer SUMMARY EXPERIENCE: Responsible for design and layout of large and small bore high and low pressure steam piping. ...
- 2016 Jul 25
Columbus, OH
... Installed underground storm, sanitary and water piping systems and extended piping to connect fixtures and plumbing to these systems. Repaired and maintained plumbing, replacing defective washers, replacing and mending broken pipes and opening ...
- 2016 Jul 18
Pickerington, OH
... Repair, maintenance and installation of building HVAC Systems, to include: steam and hot water boilers, chillers, fans, pumps, air compressors, exhaust systems, rooftop heating and cooling units, and split systems Repair and maintain electrical ...
- 2016 Jun 08
Dublin, OH
... ‘12 Modeled the flue gas flow, heat transfer and Selective Catalytic Reaction using ANSYS-Fluent inside Heat Recovery Steam Generator (HRSG) of a co-generative power plant. Successfully implemented user-defined-function for mass and momentum source ...
- 2016 Apr 27
Columbus, OH
... Hartford Steam Boiler, Hartford, CT Sep 2013-March 2014 SharePoint Developer, HSB360 Migration HSB360 is an existing intranet application which is developed using Ektron which consists of HSB complete information of Insurance accounts and content ...