Objective
Career position as a Project Engineer, Superintendent, or Quality Control Manger
Qualifications
Proficient in Microsoft Windows, Word and Excel
Expedition, Sure Track, Bid Tech, Prolog and ( USACE ) QCS/RMS
Survey proficiency in total station applications, utilizing TDS or SMI data collection for use in construction layout and as-builts
Education
1998 - Bachelor of Science, Construction Management, University of Florida
1992 - 40 hour OSHA Hazwopper Training with 8 hour annual refresher
1999 - NIOSH 582 asbestos (fiber count air sampling)
1999 - AHERA supervisor asbestos training
2008 - U.S. Army Corps of Engineers Construction Quality Management for Contractors
2009 - 30 hour OSHA
2009 - CPR/Firstaid
Relevant Experience
April 2009 - Present
Contractor Quality Control Manager USACE Innovative Technical Solutions Inc.
Medical Educationinal Instructional Facility 5 Fort Sam Houston San Antonio TX
Construction of 47,406 square feet of space containing medical classrooms, training laboratories, and associated faculty.
Design and Construction of the fifth and final Medical Instructional Facility. MIF 5 is a 47,400 SF multi-story facility that provides general and applied instructional and administrative spaces for Anatomy/Physiology (to include cadaver presentation and storage spaces) , Joint Eye/Ophthalmic, Respiratory Therapy, Cardiopulmonary, Joint Cardiovascular and ITRO Orthopedic Courses. The building will be of structural steel construction with a stucco / brick exterior. Oversaw 2 specialized CQC personal,
Electrical, and Mechanical. Also oversaw the Site Health and Safety Officer. The Project value is $18 million, plus (2 RFP’s).
September 2008 – March 2009
Contractor Quality Control Manager (USACE) Blueridge General Inc.
New Visitors Quarters Langley Air Force Base Hampton VA
The project includes construction of a 4-story structure totaling 115,363 NSF containing 203 non-handicap units and 7 handicap units for a total of 210 units. Each unit will have a separate bathroom. The project also includes site work, installation of various utilities and demolition of existing asphalt parking surfaces. Supervised 3 specialty CQC’s ( mechanical, electrical, and architectural ) and a Site Safety Officer. The project value was $26 million, plus (3 RFP’s).
October 2007- April 2008
Superintendent/Contractor Quality Control (NAVFAC) Bay Electric
26 pair fiber optic install and circuit’s 4&5 replacement NAS Jacksonville FL.
Oversaw the installation of 26 pair fiber optic cables and the replacement of 19,000 lin. feet of primary
underground cable and subsequent termination. Installation was by the means of underground directional boring.
May 2005-September 2007
Superintendent/Contractor Quality Control (NAVFAC) BKM Design Build
Bldg. 135 Restoration, NAS Jacksonville, FL.
Oversaw the Demolition and Restoration of an existing 176,000 sqft. Cold storage facility, too general
Office space. Which included a large array of hazardous materials abatements.
July 1999 - March 2003
Project Engineer/Quality Control HBE Corporation
Adams Mark Hotel, Jacksonville, FL. also Daytona Beach, FL.
Assisted Project Manager with the construction of a 20 floor, 980 room hotel and existing a 6-floor office building/parking garage renovation, to accommodate hotel, conference, ballrooms, and 2 full service kitchens and 2 independent restaurants. Negotiate change orders that range from $0 - $200,000.
Create and revise contract schedules.
Oversaw all on and off site testing and Quality Control of materials and installation procedures.
Resolve problems that surface during the construction process dealing with designs and specifications.
Oversee finalization such as warranties, O & M, manuals and shop drawings.
Manage material deliveries, track shop drawings and submittals.
November 1998 - July 1999
Site Project Engineer, Gary C. Wyatt Company
Regal Cinemas, Jacksonville, FL.
Responsible for all site engineering and quality control of an 80,000 square foot, twenty cinema complex job costing 9.5 million dollars.
Duties included but not limited to: Submittal review, shop drawing review and change order review.
Materials testing, all subcontractor quality control, and survey quality control checks
April 1997 - October 1998
Site Project Engineer, Morganti of Florida
Bulk Mail Facility, Jacksonville, FL.
Assisted Project Manager with the construction of the Bulk Mail Facility addition. Job cost 28.5 million dollars. Project was of masonry and steel construction, 68 docks and levelers, and a cast in place towveyer line.
Duties included but not limited to:
Change order review and acceptance, shop drawing review, additive and deductive change orders sub-contractors contracts and contractor quality control.
August 1993 - January 1997
Project Manager Environmental Division
Durr Industries, Plymouth, MI.
Oversaw construction/installation of volatile organic compound systems in the industrial/manufacturing environment. To include (VOC) abatement thermal oxidizers, air handlers and all associated mechanical, as well as programmable logic controls (PLC). Job sites included McDonnell Douglas Aircraft Company, Long Beach, CA., Ford Motor Company, Ontario, Canada, BMW Motor Company, Greenville, SC,. Intel Corporation, Phoenix, AZ., Motorola Corporation, Austin, TX. Job costs ranging 2.5 - 9 million dollars.
November 1989 - July 1993
Project Engineer
Delta Environmental Consultants, Farmington Hills, MI.
Oversaw installation of environmental remediation systems. Generally the petroleum industry. Systems included; pump & treat, soil vapor extraction (SVE), air sparging, and air strippers.
November 1986 - October 1989
Engineering Technician
Testing Engineers & Consultants, Troy, MI.
Duties included site soils and materials testing, steel erection, welds and torques. Also oversaw geo- technical
instrumentation and monitoring, which included inclinometers, extensometers, piezometers, and strain gages