Joseph Gacis Bisa ( ** yrs. Old )

Position: Sr. Structural Engineer at Penspen International Ltd.

Summary :

I’m a civil engineer with a work experience of 21 years in engineering / detailed design and construction of civil works and heavy steel fabrication, installation and erection works (for onshore and offshore) in Oil and Gas industries especially in offshore platforms & jackets, piperacks, power plants, industrial plants & refineries, FPSO Topsides and other related works for Steel Structures.

- Project engineering experience, supervising contractors' execution of engineering design, equipment and materials procurement, module fabrication, transportation and/or in construction in the oil and gas industries

- Ability to define and prioritize issues and solve problems through networking with other team members or external sources

- Innovative eye for identifying opportunities to reduce costs and challenge the status quo

- Ability to interface effectively with people of all levels, both internal and third parties, with wide ranging cultural backgrounds

Specialties :

Civil / Str'l. / Piping / Tanks / Static Equipments - Engineering. & Construction

Field Site Development - Construction

Modification Works of Offshore Platforms and FPSO Topsides - Engineering. & Construction

Site Erection of Str'l. & Piping / Equipment Setting - Construction

Heavy Steel Fabn., Modular Assembly & Offshore Installation - Engineering. & Construction

Work Experience :

01/22/2012 to present - Penspen - TEDA, Tianjin, China - Sr. Structural Engineer

03/21/2011 to 11/30/2011 - KNOC - Vietnam - Sr. Project Engineer

07/04/2008 to 11/30/2010 - Penspen - Al Khafji, Saudi Arabia - Structural Engineer

01/23/2008 to 06/30/2008 - J.G.Bisa Construction - Batangas, Philippines - Construction Manager

07/24/2007 to 01/15/2008 - KBR - Batam, Indonesia - Construction Superintendent

03/26/2007 to 06/26/2007 - Global Processes Systems PTE. Ltd. - Batam, Indonesia - Project Engineer

01/27/2006 to 12/04/2006 - Saipem ENI - Kuryk, Kazakhstan - Structural Prefabrication Supervisor

02/28/2005 to 01/25/2006 - J.G.Bisa Construction - Batangas, Philippines - Construction Manager

06/30/2004 to 02/26/2005 - CCC - Hazar City, Turkmenistan - Fabrication / Offshore Installation Supervisor

01/27/2004 to 06/28/2004 - NPCC - Abu Dhabi, UAE - Fabrication / Modular Assembly Supervisor

11/01/1990 to 10/05/2003 - EEI Corporation - Philippines - Fabrication Supervising Engineer

Sr. Structural Engineer - Penspen

January 2012 – Present TEDA Tianjin,China

Member of the Project Management Team for the KCROP Project of KJO to be fabricated and modular assembled in TEDA Tianjin, China. Location of the offshore installation to be at Khafji Oil Field in Al-Khafji, Saudi Arabia.

Engineering and detailed design, material procurement, fabrication, testing, transportation / logistics, onshore construction, offshore installatioN, pre-commissioning and mechanical completion, start-up and performance testing, acceptance of the facilities known as Khafji Ratawi Related Offshore Projects ( KCROP ) which comprises the following four individual projects:

1. Installation of Second Submarine Cable ( SSPC )

2. Installation of Power Distribution Platforms for ESP Phase II ( PDP-4 and PDP-5 )

3. Construction of Control and Living Platform ( CLP ) & Refurbishment of Existing UTP and LQP

4. Installation of Integrated Well Jackets IWJ-6 and IWJ-7

Senior Project Engineer - KNOC

March 2011 – November 2011 (9 months) Ho Chi Minh City & Vung Tau, Vietnam

Member of the Project Management Team and supervising contractors' execution of engineering design, equipment and materials procurement, module fabrication, offshore installation, transportation and in construction of HP Separator Air Inlet Cooler Installation Project and Booster Compressor Project in Rong Doi Gas Production Platform - Acreage 11-2 South East, Offshore Vietnam. Fabrication phase is located in Vung Tau City, Vietnam.

Structural Engineer - Penspen

July 2008 – November 2010 (2 years 5 months) Al Khafji, KSA / Alexandria, Egypt

Member of the Project Management Team for the Khafji Ratawi Water Injection Facilities ( KRWIF ) Project of KJO to be fabricated and modular assembled in Jebel Ali, Dubai, UAE. Location of the offshore installation to be at Khafji Oil Field in Al-Khafji, Saudi Arabia.

To provide Structural Engineering support in the field throughout the entire scope of works of the project and assumes / reviews Structural Engineering and construction responsibility for Structural Engineering related issues from feasibility of a project , FEED, detailed design of structural steel to final hand over of the project , typical activities in Construction of Oil & Gas Industries.

For the Fabrication, Onshore Construction and Offshore Installation of New Offshore Platforms:

1. Water Hub Platform. WHP jacket and topside facilities

2. Three (3) Water Distribution Platforms, WDP-1, WDP-2 & WDP-3 jacket and associated topsidefacilities

3. 20” submarine pipeline from onshore facilities to WDP

4. Onshore scraper launcher and associated piping, valves and instrumentation for the 20” submarine pipeline

5. 10” submarine pipeline from WHP to WDP-1, 16” submarine pipeline from WHP to WDP-2, 10” submarine pipeline from WDP-2 to WDP-3.

6. Four (4) composite 40kV submarine power cables from existing / new PDP Platforms to WHP and WDP’s

7. Thirty (30) flexible 4” submarine pipelines from WHP/WDPs to injection wellheads on existing facilities.

8. Onshore scale inhibitor chemical injection system.

For Modifications to Existing Offshore Facilities:

1. Installation of thirty (30) J-Tubes onto seventeen (17) existing wellhead platforms

2. Installation of topside piping from flexible subsea pipelines (as above) to twenty-seven (27) injection wellheads

3. Installation of switchgear, junction boxes and J-Tubes onto three existing/new PDPs

4. Installation of control equipment into OCP

Construction Manager - J.G. Bisa Construction

January 2008 – June 2008 (6 months) Batangas, Philippines

- Responsible for the safe construction of project scope through fabrication, pre-commissioning and tie-in activities.

- Coordinate/monitor the activities of Contractors performing work and ensuring compliance with project quality, specifications/standards, safety and security requirements

- Ensure that PMT members and fabrication/installation Contractors are trained and knowledgeable of specifications and work procedures, that this material is being utilized to ensure optimum efficiency, and that work is being performed in conformance with specified quality requirements

- Establish close communication and teamwork with other disciplines to ensure overall successful completion

- Plan required work activities to ensure that design drawings, tools, equipment, and materials are available

- Play an active role in the development of the safety culture on the project, making safety a natural part of all work performed

- Ensure the implementation of approved Contractor HSE plans and ensure FGPC and project HSE goals and objectives are achieved

- Provide support to the FGPC and Contractor QA/QC groups as required

- Keep the Project Manager informed of progress, planning, quality, safety, scope change and compliance, and other relative fabrication and installation activities, and to alert him, together with rectifying measures, on issues that could impact overall project objectives

Construction Superintendent - KBR, Inc.

July 2007 – January 2008 (7 months) Batam, Indonesia

Reporting directly to the Constn Mgr and responsible for the supervision and control of Craft Supervisors ; Welding and Rigging; Painting and Insulation Contractors, NDT Contractors and Scaffolding Coordinators. He shall be responsible for the day to day construction operations, control of construction tools and equipments, manpower and other necessary resources to achieve the timely project completion within the project budgets.

- Over-all supervision and monitoring of daily activities for the fabrication and erection of Belanak New Feed Gas Exchanger Project - FPSO, Flexible Risers, & Subsea Cables for

Conoco Phillips Indonesia Inc. , LTD to be delivered in offshore prior erection of Modular Assembled Structure on the Drilling Barge. Works consist of the Structural, Piping and Supports, Instruments / Electrical Cable Trays and Supports, Mechanical Works for Pressure Vessels and Internals, Equipment Setting for Heat Exchangers.

Project Engineer FPSO - Global Process Systems

March 2007 – June 2007 (4 months) Batam, Indonesia

Over-all supervision and monitoring of daily activities for the fabrication and erection of Maari FPSO Topsides Project to be delivered in Jurong Yard Singapore prior erection of Modular Assembled Structure on the Drilling Barge. Works consist of the Structural, Piping and Supports, Electrical Cable Trays and Supports, Mechanical Works for Pressure Vessels and Internals, Equipment Setting and other related works.

- Materials Take-off and monitoring of Manpower Daily Work Distribution, Daily Production Report and control and supervision of manpower, materials, tools, equipments and other necessary resources needed to complete the project within the target date of delivery

Structural Pre-Fabrication Supervisor - Saipem ENI IT

January 2006 – December 2006 (1 year) Kuryk, Kazakhstan

Reporting directly to the Construction Manager and responsible for the supervision and control of Craft Supervisors ; Welding and Rigging; and Scaffolding Coordinators. He shall be responsible for the day to day construction operations, control of construction tools and equipments, manpower and other necessary resources to achieve the timely project completion within the project budgets. In particular, he participates in :

- Over-all supervision for the pre-fabrication and erection of Pipe Rack Structures for Kashagan Field Devt. Experimental Programme. Procurement and Fabrication of Ancillary Steelworks and Piperacks for Keppel Kazakhstan.

Construction Manager - J. G. Bisa Construction

February 2005 – January 2006 (1 year) Batangas, Philippines

Reporting directly to the Project Manager and responsible for the supervision of the Craft Supervisors and the Scaffolding Coordinators for FGPC Project in the Philippines. He shall be responsible for the day-to-day construction operations, control of construction equipments, manpower and resources to achieve the timely project completion within the project budgets.

- The holding of regular/weekly meetings with his Construction Staff and the Site Planning Engineer to outline the project construction philosophy.

- Maintaining constant liaison with Field Engineering in order to resolve problems in the day-to-day requirements of construction i.e., technical queries for Subcontractors.

- The implementation of Company Policies, procedures, and practices and ensures the preparation of manpower reports and progress reports.

- Maintaining close liaison with subcontractors’ field management, coordinating work and holding regular progress meeting with Subcontractors.

Fabrication / Offshore Installation Supervisor - CCC

June 2004 – February 2005 (9 months) Hazar City, Turkmenistan

Overall supervision of the erection works for the upgrading of the Offshore Platform LAM 10 and LAM 21 located in Caspian Sea, Hazar City, Turkmenistan. This project was under the contract of the Dragon Oil Turkmenistan, Ltd. ( DOTL ) and subcontracted by CCC wherein I was especially hired to handle this onshore / offshore projects.

Fabrication / Modular Assembly Supervisor - NPCC

January 2004 – June 2004 (6 months) Abu Dhabi, UAE

Overall supervision of the Aramco projects / Oxy Qatar projects to be fabricated and modular assembled at the Mussafah Fabn. Yard, Abu Dhabi, United Arab Emirates. 7 units Modular erection of steel structural offshore platforms which includes the mechanical / piping works, cable trays installation, equipment setting and structural works for the columns, beams, stairs, ladders, handrails and installation of galvanized grating, boatlandings and also executes the full coordination with the scaffolding and welding works. The Structural Platforms are composed of : Main Deck, Lower Mezzanine Deck, Upper Mezzanine Deck and Helideck.

Fabrication / Erection Supervising Engineer - EEI Corporation

November 1990 – October 2003 (13 years) Philippines

Over-all supervision of the fabrication and modular assembly / site erection for miscellaneous projects such as:

IHI - Ishikawajima-Harima Heavy Industries Co. Ltd

Caltex Debottlenecking Project

Foster Wheeler

ABB / Portugal

MHI - Nagasaki / MHI - Kurimoto

ANALOG - Flour Daniel, Inc.

San Miguel Corporation

Destilleria Bago, Inc.

BAPE - Flour Daniel, Inc..

Petron / Pilipinas Shell Petroleum Company ( PSPC ) – STAR Project

Parsons International Ltd.

BHPI - Babcock Hitachi Philippines Inc.

- Reviews and checks the fabrication drawing for the preparation of the materials take-off to be withdrawn from the warehouse especially the awareness of the correct material specification before requisition.

- Overall checking of the outgoing documents from detailing group prior submittal to production floor for fabrication processes of modular assembly

- Review and checking of the Bill of Materials, Materials Checklist, Packing List, Materials Take-off , Fabrication and - Erection Drawing, Welding Procedure Specifications, Specifications, Standard Procedures and Processes and other necessary documents needed for the preparation of the materials cutting plan before fabrication works.

- Regularly attends the weekly and monthly coordination meeting with the client for the Accomplishment Report and Production Report wherein we discuss the possible problems to be encountered during the fabrication / assembly for the outcome of best possible solution to be written in the Change Notice Form subject for their immediate approval so as not to affect the estimated target date of project completion.

- Over-all supervision and checking of the productivity output based from the standard requirement ( parameter ) to meet the Productivity Index of 1.0 , enough to attain the estimated target date of project completion.

Education :

Batangas State University ( Bachelor, Civil Engineering ) 1985 – 1990

Training and Seminars :

Offshore Survival Training T-FOET

Supervisory Development Program

Seminar Workshop on Occupational Safety and Health Std. & Enforcement Policy, Programs & Procedures

5 S' Orientation Seminar

Basic Occupational Safety & Health Training Course

Total Quality Management (TQM)

Binzel Mig / Mag Air-Cooled Welding Torch

Introduction to ISO 9000 and Basic of Quality

Integrated Engineers Development Program

For PHILIPPINES INSTITUTE OF CIVIL ENGINEERS ( PICE ) Seminars :

Project Management and Control of 10 Storey Building

Cost Estimating and Work Scheduling of a 10 Storey Building

Reinforced Concrete Design of a 10 Storey Building

Primavera Project Planner

Cost Estimating of Road and Bridges

Design and Construction of Horizontal Structures

Role of Civil Engineers in Structural Design