Post Job Free
Sign in

Power Plant Electrical

Location:
Auraiya, UP, 206122, India
Posted:
August 11, 2012

Contact this candidate

Resume:

Saurabh Chaturvedi Mobile No: +675********

ESSAR Projects (PNG) Ltd. Email: y0ho7g@r.postjobfree.com

P.O. Box 788 y0ho7g@r.postjobfree.com

E5 GAPINA, Opp Court Haus,

Mt. Hagen 281

Papua New Guinea

Objective

To build a career that offer challenge and growth with opportunities to enrich my knowledge and skills while contributing my best to the organization I work for.

Work Experience

ORGANIZATION: ESSAR Projects PNG Ltd. (OVERSEAS)/Client: EXXON MOBIL

Role: Deputy Manager-Electrical

Duration: 20th April 2012 to till date

About the Project: KOMO Airfield Project (International Airport)

KOMO Airfield project is part of PNG LNG (Liquefied Natural Gas) project.PNG LNG is an integrated development that includes gas production and processing facilities (6-6 million tons per year) in Southern Highlands and Western Provinces of Papua New Guinea.Komo, which is located approx 10 km south east of Hydes Gas Conditioning Plant (HGCP), has been selected as the site for the airport to support PNG LNG project.

The works include the construction of Komo Airfield to accommodate Dash 8 operations and limited Antonov AN 124 operations.

Job Profile

• Study of contract document. Follow up with consultant, vendor and client for drawing approval.

• Follow up with Procurement team and vendor for timely delivery of equipments.

• Preparation of shop drawings for installation of DG sets electrical & mechanical auxiliaries and switchboards.

• Testing of the soil resistivity and installation of Earth pits and testing resistance of earth electrode.

• Preparation of Construction Execution Procedures (CEP) and Inspection Test Plan (ITP) for Electrical equipments and to get the approval from client.

• Installation of DG Sets, Main switchboard, ALER switchboard, Lighting switchboards, Distribution boards and High mast as per approved drawings.

• Preparation of all testing and commissioning procedure documents, cable schedule daily progress report.

• Perform testing of DG Sets, Main Switchboard, and ALER Switch board.

• Scheme /logic checking of Electrical system.

ORGANIZATION: Delhi International Airport (P) Ltd.-GMR Group

Role: Associate Manager-Airport Development

Duration: 20th Oct 2008 to 14th April 2012.

About The Organization

GMR Group is one of the fastest growing infrastructure enterprises in the country with interests in Airports, Energy, Highways and Urban Infrastructure sectors. DIAL is a joint venture consortium of GMR Group (54%), Airports Authority of India (26%), Fraport & Eraman Malaysia (10% each).

In March 2010, DIAL has completed the construction of integrated passenger terminal (Terminal 3). The first phase of the airport is designed and capable to handle 60 million passengers per annum (mppa).

About The Project: IGI Airport –Terminal 3 (T3)

Job Profile

• Installation, Testing and commissioning of 11kV/433V sub-stations, HT switchgear, PCC panels, MLDB, Earthing and Lightning system.

• Follow up with consultant, contactor for drawing approval and procurement and review of drawings & documents.

• Follow up with contractor & manufacturer for timely delivery of material.

• Follow up with contractor for Installation of Electrical equipment and Installation checking as per Installation drawing/documents.

• Witnessing testing of Electrical Equipments.

• Follow up with testing and execution teams for the commissioning of Electrical Equipment.

• Maintain Inspection request log and other documents.

Organization ISGEC JOHN THOMPSON –IJT (Noida Office)

Role: Sr. Engineer-Electrical design.

Duration: March 15, 2008 to Oct 12, 2008

About The Organization

Isgec John Thompson is an EPC company having interest in Power plants, Sugar Plants and is a major manufacturer of Boilers in India.

Job Profile

Study of client technical specification, preparation of SLD; follow up with vendor for drawing approval and material delivery, review of all drawings/documents, Stage Inspection of electrical equipments (HT switch board, PCC, VFDs etc.)

Organization Continental Carbon India Ltd. –CCIL (Ghaziabad)

Role Associate Manager-Projects (In charge of complete electrical package)

Duration March 15, 2007 to March 11, 2008.

About The Organization

Carbon Black-an engineered carbon is primarily used as reinforcing filler in rubber compounding. Continental Carbon India Limited (CCIL) was formed in October 2000 upon the acquisition by Continental Carbon Company (CCC), USA of the carbon black assets of Oriental Carbon & Chemicals Ltd. Since then the carbon black manufacturing facility in Ghaziabad, in the state of Uttar Pradesh, has been substantially refurbished. A 15 MW Waste Heat Recovery Power Plant, commissioned in 2008 is co-located with the manufacturing unit and supplies power to the Uttar Pradesh grid.

About the Project

Installation, Testing & Commissioning of 15MW Thermal Power Plant in parallel operation with existing 4.4 MW Power Plant with 11 MW Power Exporting facility to UPPCL.

Job Profile

• Installation, testing & commissioning of 132kV Switchyard,16 MVA power transformer,18.75 MVA Alternator,1.6 MVA distribution transformer,11 kV HT switchboard,PCC,MCC and APFC panels.

• Installation, testing & commissioning of VFD panels for 150kW FD, 180kW ID and Cooling Tower Fan.

• Installation, testing & commissioning of HT motors for Boiler Feed Pump and LT motors for boiler, turbine and cooling tower.

• Follow up for the execution of 132kV Double circuit transmission line ( Delhi Transco )

Organization Indian Rayon & Industries Ltd. - A unit of Aditya Birla Nuvo Ltd.

Role: Engineer- Power Plant (Maintenance & Projects)

Duration: July07, 2004 to March 8, 2007

About the company

Located at Veraval in Gujarat,Indian Rayon, the VFY unit of Aditya Birla Nuvo, is a major player in the Indian viscose filament yarn business.With a capacity of 17,520 tonnes per annum (tpa), Indian Rayon is the first in the country to adopt the most advanced VFY technology. A 34.5 MW Cogeneration thermal power plant supplies the uninterrupted power supply.

Job Profile

• Installation, Testing & commissioning of 2X2.5MW DG sets in Parallel with existing 16.5 MW Captive Cogeneration CFBC Thermal Power Plant.

• Installation, testing & commissioning of more than 200 nos. VFDs 3 HP to 300HP in Rayon Process Plant for smooth speed variation required for production of high quality viscose filament Yarn.

Training Programme Attended

7 QC Tools, 5S, ISO 9001, ISO14001, WCM, MS Projects, SAP.

Safety Programme Attended

Working in confined space, working at height, Log out and Tag out.

Educational Qualification

B.Tech. - first division in Electrical Engineering from M NIT (REC) Jaipur in 2004.

Intermediate first division from UP Board in 1998.

High school first division from UP Board in 1996.

Personal Information

Father’s Name: Ashok Kumar Chaturvedi Date of Birth: Dec 8, 1982. Marital Status: Married Add. For communication 189 kh, Satteshwar Auraiya, U.P. Pin-206122



Contact this candidate