APPLICATION LETTER
CURRICULUM VITAE
Personal Detail
Full Name : Hari Sudrajat,
Date of Birth : August 12, 1971
Nationality : Indonesian
Marrital Status : Married
Religion : Moslem
Contact Address : Perumahan Puri Serpong Blok E1 no. 15
Kel. Setu. Kec. Setu Serpong Tangerang - Indonesia
Contact Number : Mobile : +62-852-****-**** begin_of_the_skype_highlighting +62-852-****-**** end_of_the_skype_highlighting / +62-857********
Email : wtd8sw@r.postjobfree.com
wtd8sw@r.postjobfree.com
Formal Education
February 2000, Graduated from S-1 degree of Electrical Engineering at Sepuluh Nopember
Institute of Technology (ITS) - Surabaya
October 1996 , Graduated from D-3 degree of Electrical Engineering at Polytechnic of ITB –
Bandung
Professional Training
1. Job training at PT. Telkom Divisi RisTi in Bandung
2. Job training at PT. Telkomsel in Surabaya
3. Training Ericsson RBS 2206/2216 & 2116/2106
4. Training Ericsson RBS 3G (3206/3107)
5. CDMA Training : - CDMA 2000 : The competitive Advantage ( May 9, 2005)
- CDMA 2000 1X RC1 & RC2 ( May 11, 2005)
- CDMA 2000 1X Release 0 ( May 12, 2005)
- CDMA 2000 Network Planning ( August 2,2005)
6. Training Huawei-RBS T3900/RTN 620/605 Microwave – February 2010
Working Experience
PT ERICSSON INDONESIA (November 2009 – Januari 2010).
Division : Radio Access Network (RAN)
Position : Transmission Engineer
Project : 3G INDOSAT
Location : Jakarta Area, indonesia
Mini Link Responsibilities :
1. Supervised site installation Traffic Node Realese 4
2. Setting configuration for Dual Stack
3. Setting LAN and WAN for TN Realese 4
4. Installation FO Between TN realese 4 to ME (Metro Ethernet)
5. Performed testing and commissioning Traffic node Realese 4
6. Troubleshooting Traffic node Realese 4
7. Report to Team leader and Project Manager
8. Advise customer about operation and technical question related of TN R-4
9. Swap - Upgrade Software Traffic Node
10. Prepare and to do Pre_ATP with Sub_contractor for Minilink TN Realese 4
11. Scan Frequency for test inteference for Minilink TN Realese 4
PT ERICSSON INDONESIA (February 2008 – October 2009).
Division : Radio Access Network (RAN)
Position : RBS/Transmission Engineer
Project : 2G/3G AXIS-NTS (Natrindo telepon Seluller)
Location : Jakarta Area, indonesia
Responsibilities:
RBS Responsibilities :
1 Supervised site installation RBS 2G/3G
2. Performed testing and commissioning of ERICSSON RBS 2G
3. Troubleshooting RBS 2G/3G
4. Report to Team leader and Project Manager
5. Advise customer about operation and technical question related of RBS
6. Familiar with 2G/ 3G Overview,
7. Coordination with internal dept. for Rollout Activities
8. Monitoring of equipments deployment at sites.
9. Supervision of Installation teams for Quality works.
10. Ensuring smooth commissioning and integration of telecom equipments in coordination with maintenance team.
11. Telecom installation acceptance.
12. Improve quality of the implementation.
13. Manage main/sub-contractors.
14. Conduct site acceptance with customer
Mini Link Responsibilities :
1. Supervised site installation Mini-Link E, High Capacity, Traffic Node.
2. Performed testing and commissioning of Mini-Link E, High Capacity, Traffic node
3. Troubleshooting Mini-Link E, High Capacity, Traffic node
4. Report to Team leader and Project Manager
5. Advise customer about operation and technical question related of Mini- Link
6. Troubleshooting of Transmission ( Minilink and High Cap )
7. Crossconnect E1 ( Transmission ) for Troubleshooting RBS and Change of E1
8. Crossconnect E1 Transmission from BSC to End Site (New Site)
9. Upgrade Software Traffic Node and High Capacity
10. Upgrade Capacity Traffic Node and High Capacity
11. Cross-Connect E1 Between DXX to End Site with software
12. Prepare and to do Pre_ATP with Sub_contractor for Minilink TN and Minilink HC
13. Prepare and to do ATP with Customer (Operator) for Minilink TN and Minilink HC
14. Scan Frequency for test inteference for Minilink TN and Minilink HC
15. Cross-connect point to point, end site untill to DXX
Date : August 2006 to December 2007
Company : PT. DDF Asia (Ericsson indonesia partner)
Position : RBS & Mini-Link ENGINEER
Project : TELKOMSEL Jabodetabek and Kalimantan Area
Responsibilities :
1. Supervised Site installation: RBS, Mini-link, Rectifier, Cable Tray, Measuring Input power, E1 available, Antenna orientation, Tilting, Missing material, etc...
2. Perform testing and commissioning RBS (2106/2216, 2216/2116), Mini-Link E, and Rectifier connection power
3. Cross connect (end to end test)
4. Perform Link transmission interconnection and integration
5. Preloading and loading RBS complete
6. Swap antenna
7. Do coordination with OMC Engineers for checking the alarm, reloading RBS software, blocking and unblocking TRX, external alarm and so on
8. Perform test call, Hand over, alarm simulation for site Acceptance
9. Prepare ATP documentation
10. Supervised site installation (RBS 2G/3G, Mini-Link, High Capacity, Traffic Node, Battery back-up, cable tray, Rectifier, PDB, Antenna orientation, Tilting, Missing material, etc..)
11. Performed testing and commissioning of ERICSSON RBS 2G, Mini-Link, High Capacity, Traffic node
12. advise customer about operation and technical question related of RBS or Mini- Link
13. Report to team Leader and project manager
Date : July 2005 to December 2006
Company : PT. DDF Asia (Nokia indonesia partner)
Position : BTS Field ENGINEER
Project : TELKOMSEL Jabodetabek and Bandung
Responsibilities :
Project Experience Nokia
1. Supervised Site installation BTS Ultrasite and BTS Flexi Nokia with installation team leader Measuring
2. Perform testing and commissioning BTS Ultrasite and BTS Flexi Nokia
3. Cross connect (end to end test)
4. Perform Link transmission interconnection and integration
5. Preloading and loading BTS Ultrasite and BTS felxi Nokia complete
6. Swap antenna
7. Do coordination with OMC Engineers for checking the alarm, reloading BTS Ultrasite and felxi BTS software, blocking and unblocking TRX, external alarm and so on
8. Perform test call, Hand over, alarm simulation for site Acceptance
9. Prepare ATP documentation
10. Supervised site installation Battery back-up, cable tray, Rectifier, PDB, Antenna
orientation, Tilting, Missing material.
11. Prepare and to do Pre_ATP BTS Ultrasite and BTS felxi Nokia with Customer
Date : July 2002 to December 2004
Company : PT. DDF Asia (Motorola indonesia partner)
Position : BTS Field ENGINEER
Project : TELKOMSEL Jabodetabek and Kalimantan Area
Responsibilities :
Project Experience Motorola
1. GSM 900_Telkomsel Jabotabek and West Java Area new BSS
Installation & commissioning bts
2. DCS-1800_Telkomsel Jabotabek and West Java Area new BSS
3. Supervise DCS-1800 new site project at Jakarta and West Java. Commissioning, Acceptance Test and RF Integration
4. GSM 900_Telkomsel Kalimantan Area new BSS
5. Installation BSC , XCDR, & PCU
6. DCS-1800_Telkomsel Kalimantan Area new BSS
7. Supervise DCS-1800 new site project at Kalimantan Area. Commissioning , Acceptance Test and RF Integration
8. DCS-1800_Telkomsel Jakarta, west Java, and kalimantan Area Frequency Tunning
9. Check Site Performation and check time slot
10. Micro Horizon Compaq GSM & DCS Telkomsel Jabotabek, West Java and Kalimantan Area
11. Manage Transmission for Swing, Reroute, and New Site Cross Connection
12. Upgrade Cabinet BTS Motorola Hmac/Hmac2
13. Swap BTS Motorola Hmac to Hmac2
14. Installation for new site GSM/DCS BTS Motorola
15. Upgrade capacity & add of cabinet for BTS to GSM/DCS Motorola
16. Integration for RBS/BTS between BSC to RBS (end to end)
17. Commissioning BTS to GSM/DCS Motorola
18. Make of report as Acceptance Test that result from commisioning
19. Drive test Record and collect the data from result of test call.
20. Drive test Record and collect the data from result of drive test (coverage)
21. Drive test Record and collect the data from result of test time slot.
22. Upgrade BTS of existing/Co-located
23. Swap of existing GSM /DCS with new equipment
24. Trouble shooting if any alarm on site
25. Clearing alarm to make sure that BTS to become good performance
26. GSM/DCS integration and drive test (record and collect data such as test call, test time slot, and test coverage
27. GSM / DCS-1800 coverage drive test and test call for new site
28. Survey for new site
29. Resurvey for site preparation before the site will be upgrade
30. Resurvey for site preparation before the site will be swap
31. Ready for Standby “ ON Call ” 24 hour’s if any trouble on site
32. Ability measurement cable of feeder with site master (anritsu) for measure such as VSWR, DTF and RL
Date : July 2000 to June 2002
Company : PT. Digicom Celluler (Motorola indonesia partner)
Position : RF ENGINEER
Project : TELKOMSEL Jabodetabek
Responsibilities :
Project Experience Motorola (PT. Telkomsel Indonesia)
1. Survey for searching new site with using GPS and compas
2. Survey for LOS ( Line Of Sight)
3. Record and collect the data of survey result
4. Survey for searching new site with other candidat that minimal 2 candidat
5. Survey of observation, situation and condition on field
6. Observation of condition to make difference between of urban, sub-urban or rural.
7. Make report of survey result with Path Loss program
8. Familiar with using : Compas, GPS, Tiltmeter.
9. Familiar reading all type Feeder and tower type
Measurement of equipment Skill
Commissioning Software
• Procomm Plus Communicator (Motorola software)
• Sitemaster (Anritsu) Software 6.30,6.31, 6.40, 6.57
• BACK ( BTS Advanced Commissioning Kit )
• OMT Manager vesi. R 32_6
• MSM 6.3
• Software Minilink Traffic Node and High Capacity (Release 2, 3, and 4)
• Software MiniLink Craft
Optimation / Integration Software
• TEMS 900/Dualband/Investigation (version : 2 0, 2.02, 3.2, 4. 1, 5.0, 6.0, 7.0)
• BER Test for Minilinki
• Signal generator (agilent)
Reference
1. AGUS SUWANDONO
Head of Manager, Transmission Implementation – Ericsson Indonesia
Email : wtd8sw@r.postjobfree.com
Phone : +62-811-***-***
2.YOHANES PRESETYO
Head of Manager, RBS Implementation – Ericsson Indonesia
Email : wtd8sw@r.postjobfree.com
Phone : +62-811-***-***
3.DIBUD DEWANDONO
Transmission Engineer Implementation – Ericsson Indonesia
Email : wtd8sw@r.postjobfree.com
Phone : +62-815-****-****