Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
United States
Posted:
June 30, 2010

Contact this candidate

Resume:

APPLICATION LETTER

CURRICULUM VITAE

Personal Detail

Full Name : Hari Sudrajat,

Date of Birth : August 12, 1971

Nationality : Indonesian

Marrital Status : Married

Religion : Moslem

Contact Address : Perumahan Puri Serpong Blok E1 no. 15

Kel. Setu. Kec. Setu Serpong Tangerang - Indonesia

Contact Number : Mobile : +62-852-****-**** begin_of_the_skype_highlighting              +62-852-****-****      end_of_the_skype_highlighting / +62-857********

Email : wtd8sw@r.postjobfree.com

wtd8sw@r.postjobfree.com

Formal Education

February 2000, Graduated from S-1 degree of Electrical Engineering at Sepuluh Nopember

Institute of Technology (ITS) - Surabaya

October 1996 , Graduated from D-3 degree of Electrical Engineering at Polytechnic of ITB –

Bandung

Professional Training

1. Job training at PT. Telkom Divisi RisTi in Bandung

2. Job training at PT. Telkomsel in Surabaya

3. Training Ericsson RBS 2206/2216 & 2116/2106

4. Training Ericsson RBS 3G (3206/3107)

5. CDMA Training : - CDMA 2000 : The competitive Advantage ( May 9, 2005)

- CDMA 2000 1X RC1 & RC2 ( May 11, 2005)

- CDMA 2000 1X Release 0 ( May 12, 2005)

- CDMA 2000 Network Planning ( August 2,2005)

6. Training Huawei-RBS T3900/RTN 620/605 Microwave – February 2010

Working Experience

PT ERICSSON INDONESIA (November 2009 – Januari 2010).

Division : Radio Access Network (RAN)

Position : Transmission Engineer

Project : 3G INDOSAT

Location : Jakarta Area, indonesia

Mini Link Responsibilities :

1. Supervised site installation Traffic Node Realese 4

2. Setting configuration for Dual Stack

3. Setting LAN and WAN for TN Realese 4

4. Installation FO Between TN realese 4 to ME (Metro Ethernet)

5. Performed testing and commissioning Traffic node Realese 4

6. Troubleshooting Traffic node Realese 4

7. Report to Team leader and Project Manager

8. Advise customer about operation and technical question related of TN R-4

9. Swap - Upgrade Software Traffic Node

10. Prepare and to do Pre_ATP with Sub_contractor for Minilink TN Realese 4

11. Scan Frequency for test inteference for Minilink TN Realese 4

PT ERICSSON INDONESIA (February 2008 – October 2009).

Division : Radio Access Network (RAN)

Position : RBS/Transmission Engineer

Project : 2G/3G AXIS-NTS (Natrindo telepon Seluller)

Location : Jakarta Area, indonesia

Responsibilities:

RBS Responsibilities :

1 Supervised site installation RBS 2G/3G

2. Performed testing and commissioning of ERICSSON RBS 2G

3. Troubleshooting RBS 2G/3G

4. Report to Team leader and Project Manager

5. Advise customer about operation and technical question related of RBS

6. Familiar with 2G/ 3G Overview,

7. Coordination with internal dept. for Rollout Activities

8. Monitoring of equipments deployment at sites.

9. Supervision of Installation teams for Quality works.

10. Ensuring smooth commissioning and integration of telecom equipments in coordination with maintenance team.

11. Telecom installation acceptance.

12. Improve quality of the implementation.

13. Manage main/sub-contractors.

14. Conduct site acceptance with customer

Mini Link Responsibilities :

1. Supervised site installation Mini-Link E, High Capacity, Traffic Node.

2. Performed testing and commissioning of Mini-Link E, High Capacity, Traffic node

3. Troubleshooting Mini-Link E, High Capacity, Traffic node

4. Report to Team leader and Project Manager

5. Advise customer about operation and technical question related of Mini- Link

6. Troubleshooting of Transmission ( Minilink and High Cap )

7. Crossconnect E1 ( Transmission ) for Troubleshooting RBS and Change of E1

8. Crossconnect E1 Transmission from BSC to End Site (New Site)

9. Upgrade Software Traffic Node and High Capacity

10. Upgrade Capacity Traffic Node and High Capacity

11. Cross-Connect E1 Between DXX to End Site with software

12. Prepare and to do Pre_ATP with Sub_contractor for Minilink TN and Minilink HC

13. Prepare and to do ATP with Customer (Operator) for Minilink TN and Minilink HC

14. Scan Frequency for test inteference for Minilink TN and Minilink HC

15. Cross-connect point to point, end site untill to DXX

Date : August 2006 to December 2007

Company : PT. DDF Asia (Ericsson indonesia partner)

Position : RBS & Mini-Link ENGINEER

Project : TELKOMSEL Jabodetabek and Kalimantan Area

Responsibilities :

1. Supervised Site installation: RBS, Mini-link, Rectifier, Cable Tray, Measuring Input power, E1 available, Antenna orientation, Tilting, Missing material, etc...

2. Perform testing and commissioning RBS (2106/2216, 2216/2116), Mini-Link E, and Rectifier connection power

3. Cross connect (end to end test)

4. Perform Link transmission interconnection and integration

5. Preloading and loading RBS complete

6. Swap antenna

7. Do coordination with OMC Engineers for checking the alarm, reloading RBS software, blocking and unblocking TRX, external alarm and so on

8. Perform test call, Hand over, alarm simulation for site Acceptance

9. Prepare ATP documentation

10. Supervised site installation (RBS 2G/3G, Mini-Link, High Capacity, Traffic Node, Battery back-up, cable tray, Rectifier, PDB, Antenna orientation, Tilting, Missing material, etc..)

11. Performed testing and commissioning of ERICSSON RBS 2G, Mini-Link, High Capacity, Traffic node

12. advise customer about operation and technical question related of RBS or Mini- Link

13. Report to team Leader and project manager

Date : July 2005 to December 2006

Company : PT. DDF Asia (Nokia indonesia partner)

Position : BTS Field ENGINEER

Project : TELKOMSEL Jabodetabek and Bandung

Responsibilities :

Project Experience Nokia

1. Supervised Site installation BTS Ultrasite and BTS Flexi Nokia with installation team leader Measuring

2. Perform testing and commissioning BTS Ultrasite and BTS Flexi Nokia

3. Cross connect (end to end test)

4. Perform Link transmission interconnection and integration

5. Preloading and loading BTS Ultrasite and BTS felxi Nokia complete

6. Swap antenna

7. Do coordination with OMC Engineers for checking the alarm, reloading BTS Ultrasite and felxi BTS software, blocking and unblocking TRX, external alarm and so on

8. Perform test call, Hand over, alarm simulation for site Acceptance

9. Prepare ATP documentation

10. Supervised site installation Battery back-up, cable tray, Rectifier, PDB, Antenna

orientation, Tilting, Missing material.

11. Prepare and to do Pre_ATP BTS Ultrasite and BTS felxi Nokia with Customer

Date : July 2002 to December 2004

Company : PT. DDF Asia (Motorola indonesia partner)

Position : BTS Field ENGINEER

Project : TELKOMSEL Jabodetabek and Kalimantan Area

Responsibilities :

Project Experience Motorola

1. GSM 900_Telkomsel Jabotabek and West Java Area new BSS

Installation & commissioning bts

2. DCS-1800_Telkomsel Jabotabek and West Java Area new BSS

3. Supervise DCS-1800 new site project at Jakarta and West Java. Commissioning, Acceptance Test and RF Integration

4. GSM 900_Telkomsel Kalimantan Area new BSS

5. Installation BSC , XCDR, & PCU

6. DCS-1800_Telkomsel Kalimantan Area new BSS

7. Supervise DCS-1800 new site project at Kalimantan Area. Commissioning , Acceptance Test and RF Integration

8. DCS-1800_Telkomsel Jakarta, west Java, and kalimantan Area Frequency Tunning

9. Check Site Performation and check time slot

10. Micro Horizon Compaq GSM & DCS Telkomsel Jabotabek, West Java and Kalimantan Area

11. Manage Transmission for Swing, Reroute, and New Site Cross Connection

12. Upgrade Cabinet BTS Motorola Hmac/Hmac2

13. Swap BTS Motorola Hmac to Hmac2

14. Installation for new site GSM/DCS BTS Motorola

15. Upgrade capacity & add of cabinet for BTS to GSM/DCS Motorola

16. Integration for RBS/BTS between BSC to RBS (end to end)

17. Commissioning BTS to GSM/DCS Motorola

18. Make of report as Acceptance Test that result from commisioning

19. Drive test Record and collect the data from result of test call.

20. Drive test Record and collect the data from result of drive test (coverage)

21. Drive test Record and collect the data from result of test time slot.

22. Upgrade BTS of existing/Co-located

23. Swap of existing GSM /DCS with new equipment

24. Trouble shooting if any alarm on site

25. Clearing alarm to make sure that BTS to become good performance

26. GSM/DCS integration and drive test (record and collect data such as test call, test time slot, and test coverage

27. GSM / DCS-1800 coverage drive test and test call for new site

28. Survey for new site

29. Resurvey for site preparation before the site will be upgrade

30. Resurvey for site preparation before the site will be swap

31. Ready for Standby “ ON Call ” 24 hour’s if any trouble on site

32. Ability measurement cable of feeder with site master (anritsu) for measure such as VSWR, DTF and RL

Date : July 2000 to June 2002

Company : PT. Digicom Celluler (Motorola indonesia partner)

Position : RF ENGINEER

Project : TELKOMSEL Jabodetabek

Responsibilities :

Project Experience Motorola (PT. Telkomsel Indonesia)

1. Survey for searching new site with using GPS and compas

2. Survey for LOS ( Line Of Sight)

3. Record and collect the data of survey result

4. Survey for searching new site with other candidat that minimal 2 candidat

5. Survey of observation, situation and condition on field

6. Observation of condition to make difference between of urban, sub-urban or rural.

7. Make report of survey result with Path Loss program

8. Familiar with using : Compas, GPS, Tiltmeter.

9. Familiar reading all type Feeder and tower type

Measurement of equipment Skill

Commissioning Software

• Procomm Plus Communicator (Motorola software)

• Sitemaster (Anritsu) Software 6.30,6.31, 6.40, 6.57

• BACK ( BTS Advanced Commissioning Kit )

• OMT Manager vesi. R 32_6

• MSM 6.3

• Software Minilink Traffic Node and High Capacity (Release 2, 3, and 4)

• Software MiniLink Craft

Optimation / Integration Software

• TEMS 900/Dualband/Investigation (version : 2 0, 2.02, 3.2, 4. 1, 5.0, 6.0, 7.0)

• BER Test for Minilinki

• Signal generator (agilent)

Reference

1. AGUS SUWANDONO

Head of Manager, Transmission Implementation – Ericsson Indonesia

Email : wtd8sw@r.postjobfree.com

Phone : +62-811-***-***

2.YOHANES PRESETYO

Head of Manager, RBS Implementation – Ericsson Indonesia

Email : wtd8sw@r.postjobfree.com

Phone : +62-811-***-***

3.DIBUD DEWANDONO

Transmission Engineer Implementation – Ericsson Indonesia

Email : wtd8sw@r.postjobfree.com

Phone : +62-815-****-****



Contact this candidate