CURTIS LUMMUS
Dickinson, TX **539
Home: 832-***-****
Cell: 281-***-****
w4t0e8@r.postjobfree.com
Summary of Qualifications
Valued team player with companies such as Granite, Fluor Daniels, Morrison Knudsen, PCL, and Fagen with projects ranging from $5 to $326 Million. Primary responsibilities on jobs include ordering materials for effective utilization of resources, assist in the development of productivity programs and critical deadlines. Mentored crews in numbers of up to 32 tradesmen and 4 foremen at one time. Have supervised union and non-union work forces. Maintained and enforced proper OSHA regulations on all construction projects. Work with all customers to ensure that we are exceeding their needs and expectations with regard to safety, training, professionalism, cleanliness and environmental issues. Ensure all employees are properly trained for the work they are performing and on equipment they will be utilizing.
Provides input to Project Management for inclusion of weekly production reports. Assisted with site staffing and equipment utilization. Responsible for coordination with subcontractors on production schedule, identifying quality issues, and corrective measures. Interface with QA/QC to ensure acceptance of each completed project. Have vast experience working with DOT and METRO in various cities throughout the United States.
Construction background consists of industrial, marine and heavy civil projects. Supervised 2400 cubic yard footer pours. Worked with all size pump trucks, drag hose lines, and shoring. Have experience with all style forming systems. Have vast experience with cranes, rigging, and heavy lifts. Supervised lifts weighing up to 100 tons done with double ringer cranes on barges.
Special Skills and Training
NCCER Certified Carpenter
NCCER Certified Pipe-fitter
Confined Space
Shipyard Competent Person
Certified First Aide/CPR/AED
40 Hour Hazwoper
Trench Shoring Competent
Competent Scaffold Trained and Certified
Bi Lingual (Spanish)
Computer Literate
Continuous OSHA Training
Work Experience
06/2011-Current Tellepsen
Mt. Belview, Texas
Civil Superintendent
Ongoing project at Enterprise.
Responsible for all civil related duties in demo, add ons, and new construction
Coordinate with all subcontractors as per their duties, time frames, and safety
09/2010-06/2011 Halverson Construction
Ripley, Illinois
Bridge Superintendent
$8 million project in Ripley, Illinois
Consisted of 8 mile road resurfacing, road widening, massive rock and earth excavation, and
construction of 3 span 6 girder bridge
Coordinated with all sub-contractors as per their schedule, our needs, and a safe execution of contract
05/2009-08/2010 J & P Construction
Gautier, Mississippi
General Superintendent
$4 million project in Gautier, Mississippi
Expansion on existing waste water treatment facility
Constructing 94 foot diameter clarifier, pump station, and sludge splitter boxes
Contract involves all civil, mechanical, and structural related applications
Ensure proper material ordering and availability as per job progression
Conduct weekly safety meeting on OSHA Safety regulations
11/2008-04/2009 Cajun Constructors, Inc.
Pascagoula, Mississippi
General Foreman
CCR (Continuous Catalytic Reformer) at the Chevron Refinery in Pascagoula, MS
Footers (up to 2400 cubic yards) columns (using maxi-form panels) and area paving.
1 lead man, 6 carpenters, and 4 helpers under my direct supervision
06/2007-10/2008 TKM (Traylor, Kiewit, and Massman)
Slidell, Louisiana
Assistant Superintendent
$130 million project on 1.3 mile high-rise center section
Building the I-10 Twin Span replacement bridge vastly damaged during Hurricane Katrina
Overseen 2 crews consisted of 12 bridge carpenters and 2 crane operators
Responsible for seal slab & footer placements
Handle ordering all job related consumables, rigging, and tools
Mentor production crew on proper TKM standards and regulations
11/2005-05/2007 Granite Archer Western
Pass Christian, Mississippi
Assistant Superintendent
$326 million project in Bay St. Louis, Mississippi
Constructed US Hwy 90 Bay St. Louis Bridge
Instructed crews on proper company procedures for footers (ranging up to 975 cubic yards) and
columns (averaging 40-80 foot in height)
Set bridge caps, bulb T girders, and center span haunch girder
All heavy lifts coordinated through me and lead crane operator to ensure safety factor and
proper rigging is installed
01/2004-08/2005 Fagen, Inc.
Redfield, South Dakota
General Foreman
$35 million project in Redfield, South Dakota
Development of Ethanol Plant in Redfield, South Dakota
Excavating, form setting, set up and take down of temporary facilities
Ensure proper layout and placement of all concrete anchor bolts and rebar
Concrete pours consisted of four 250 cubic yard radius footers, radius walls, slabs, steps,
ramps, piers, and control room
03/2002-12/2003 Betco
La Marque, Texas
General Foreman
Time and material project in La Marque, Texas
Amoco Chemical MX-2 Fluor Daniel’s project
Overseen correct and safe scaffold erection as per the needs of various crafts (ranging from
220 foot double-legged tower scaffolds to basic hanger and pipe rack scaffolds)
28 men and 4 foremen under my direct supervision at the job’s peak
Scaffold request organization, ordering material, and upkeep of job’s progress
Weekly meetings with Fluor Daniel’s to ensure client’s complete satisfaction
08/2000-02/2002 Tepsco
Gonzales, Louisiana
General Foreman
Time and material project in Gonzales, Louisiana
Installation of Enterprise pipeline pump stations in Gonzales, LA to Belleview, TX
Overseen construction, excavations, trenches, piers, footers, slabs, and proper pipe
encasement
Production crews consisted of 2 foremen, 8 carpenters, 4 helpers, and 2 laborers
Conducted daily and weekly safety and production meetings
03/1998-07/2000 Morrison Knudsen
Denver, Colorado
Carpenter Foreman
Bridge cap crew on the E-470 expansion project in Denver, CO
Worked with flat and hammerhead style caps
Used EFCO plate-girder forming system on bridge caps and columns
8 men and 1 lead man under my direct supervision throughout job
04/1997-02/1998 PCL
Walland, Tennessee
Carpenter Foreman
Heavy civil federal funded two lane segment type bridge in Smoky Mountains
Over heavy abutment and retaining wall crew
6 men and 1 lead man
Safe and proper form erection and concrete placement
Worked heavy hours to meet job’s deadline
Symons Versiform and Flex-Form systems throughout construction
REFERENCES
Brandon Smith Superintendent 601-***-****
Loyle Burge Project Manager 480-***-****