POSITION APPLIED : Electrical Commissioning Engineer

PERSONAL DETAIL

NAME : Alexander L. Hernandez

AGE : 47

SNRIC : S2740744G ( Singapore PR )

NATIONALITY : Filipino

PASSPORT N0 . : EB3760730

MARITALSTATUS : Married

CONTACT DETAIL

PRESENT ADDRESS : Block 523 Bukit Batok St.52 # 05 - 721
Singapore , 650523

PERMANENT ADDRESS : Metro homes GSIS Condominium Building 26 b-20
Pureza St. Sta Mesa , Manila Philippines 1016

EMAIL ADDRESS : vmf713@r.postjobfree.com
TELEPHONE NUMBER : +632*******,+639162918489,+659*******,+60177156752

EDUCATION : Electrical Engineering Technology
1980 – 1983
: BSEE -1983-1986
Technological university of the Philippines

ACADEMIC QUALIFICATION : Registered Master Electrician

PROFESSIONAL AFFILIATES : Integrated Institute of Electrical Engineer of the Philippines
Member, 1985 to present

SKILL PROFILES : Electrical / Instrument Interface Engineer
Electrical commissioning Engineer
Maintenance Electrical Technician/Planner
Lead E/I /T Inspector/ MC Engineer Electrical Detail Design Engineer
Mechanical Completion Engineer
E/I Construction Engineer
COURSE ATTENDED

March 12-13 ,2012 : ISSOW - Petrotechnics Training
Integrated Safety system of Works
SSPC – CSU no.5 Site office conference room
MMHE , Pasir Gudang , Johor Malaysia

Jan 31- Feb 02-2012 : SMEPS – Shell Malaysia exploration and production
PTW for Applicant / Management Training
Mutiara Hotel , Johor Bahru , Malaysia

Dec. 8-9 ,2011 : NIOSH – National institute of occupational safety and health
Authorised Entrant and stand by person for confined space.
MHHE Pasir Gudang , Johor Malaysia Expired date:12-2013

Sept.17-22-2007 : HAZARDOUS AREA COMP “EX” COMPETENCE
Base COURSE ( ATEX DIRECTIVES )
Asset training technical services Private Ltd. A.S.E.T Abardeen skills Enterprise training Ltd., Singapore

March 9 , 2005 : CPR and PRACTIQUE EMERGENCY Care training

June 26, 2005 : LIFE SAVING TRAINING
Sembawang Shipyard, Singapore
October 20, 2004 : Training for Gemstart Motor relay management
Protection/Alstom Micom scada & protection system
Saipem Erha ICT Team, Sembawang , Singapore

July 30 , 2003 : OFFSHORE SAFETY INDUCTION ON – Basic life
Support Sea Survival and HUET.Helicopter under
Water escape training
PVMTC-Petrovietnam Manpower Training College

Nov. 10 , 2002 : OFFSHORE AWARENESS TRAINING
Premier oil Company – ANOA AGX PLATFORM
South Natuna Sea Offshore , Indonesia

January 7, 1998 : TYCO ADDRESSABLE FIRE & GAS TRAINING Singapore

March 23 , 1998 : SHIPYARD SAFETY COURSE
OSH Training and Promotion Center , Singapore

May 25, 1995 : Tripping of Circuit Breaker without Relay Target
Transient Voltage Analysis and Load flow analysis.
S.O.C Technical center, Marsa El brega, Libya

October 20,1987 : HIGH VOLTAGE JOINT/TERMINATION TRAINING
Meralco Foundation Institute , Philippines.

COMPUTER LITERACY : Microsoft Word & Excel
: Familiar on completion data base : PIMS , Win PCS, CMS,
OCMS and Project tools.

WORKING EXPERIENCE ( IN CHRONOLOGICAL ORDER,STARTING WITH MOST RECENT )

November 2011 to Present : Velosi Engineering Projects Private limited
Electrical Commissioning Engineer
Gumusut Kakap Semi-Sub FPS Project
Shell SSPC Commissioning & Start-up group
MMHE,Pasir Gudang Johor Bahru , Malaysia

June to November 2011 : Air Energi Group Singapore Pte Ltd
Electrical / Instrument Supervisor
Conocophillips FSO LPG BELANAK
Turret Integration and upgrading project.
Sembawang Shipyard , Singapore

Sept. 2010 to June 2011 : Kongsberg Maritime Engineering
Electrical / Intrument Interface Engineer
FPU –TSB Gas Processing Project , BW Offshore.
Sembawang Shipyard , Singapore
OSX-1 Nexus FPSO
Upgrading and Modification project.
Keppel Shipyard Benoi Singapore

March 2010 to Sept.2010 : Air Energi Group Singapore Pte Ltd,
Lead Elect’l / Instrument/Telecom“EX”Certified Inspector
FPSO Peregrino – Maersk Oil Conversion &Integration proj.
Keppel Shipyard , Singapore

April 2009 to March 2010 : Mitsui Ocean Development and Engineering Co, Ltd.
Electrical / Instrument Construction Engineer
FPSO TUPI –MODEC- Petrobras Conversion project
Cosco ,Dalian Shipyard, Dalian China

March 2008 to Dec.2008 : Worldwide Worker Abu Dhabi
Electrical / Instrument Interface Engineer
FPSOcean Management A.S.
FPSO Deep Producer 1 Conversion of Direct Positioning
Dubai Dry Dock , Dubai U.A.E.

April 2007 to March 2007 : Air Energy Consulting Asia Pacific Pte Ltd. Singapore
Lead Electrical / Instrument Inspector
Blue water Energy Services B.V(Nexen Petroleum proj.)
FPSO AOKA MIZU Deep water Direct Positioning
Sembawang , Singapore

Nov. 2005 to March 2007 : Air Energy Consulting Asia Pacific Pte Ltd. Singapore
Electrical / Instrument Engineer
Modec Offshore FSO PRA-1Espadarte project.Petrobras
Marine Conversation and Topside Integration.
Jurong , Singapore

July 2004 to Oct.2005 : Air Energy Consulting Asia Pacific Pte Ltd. Singapore
Electrical Commissioning Engineer
ESSO / SAIPEM project FPSO ERHA
Topside Integration, MC & Commissioning
Sembawang Singapore

March 2004 to July 2004 : PTT Engineering and Consultant Pte Ltd.
Electrical Commissioning Engineer
KBR Halliburton/Conocophillips,FPSO Belanak Proj.
Pre-comm and Commissioning Top side & process modules.
Mc Dermott Fabrication .Yard, Batam Indonesia

Jan 2003 to Nov.2003 : Air Energy Consulting Asia Pacific Pte Ltd. Singapore.
Electrical & Instrument Inspector
CUULONG – CLJOC Joint operating company
FPSO MV9 External TURRET CUULONG Sutuden Proj
Fabrication /Installation Hook-up and Interface
Samsung shipyard Korea / MSE Johor Bahru ,Malaysia

Air Energy Consulting Asia Pacific Pte Ltd. Vietnam
Electrical & Instrument Engineer
CUULONG – CLJOC Joint operating company
WHP – Wellhead unmanned platform Installation,
Mechanical completion and Commissioning.
PTSC , Supply Base Vung tau city , Vietnam.

Oct.2001 to Jan.2003 : PTT Engineering and Consultant Pte Ltd. Singapore
Electrical Instrument & Telecom Inspector
SBM Offshore / Petrobras FPSO BRASIL Project.
SBM Offshore / Exxon Mobil FPSO SERPENTINA Proj.
Fabrication, Installation ,and Commissioning on Marine
And Topside Process Modules.
Keppel Shipyard , Singapore.

June 1999 to May 2001 : TOTAL Automation Limited , Singapore.
MC Completion Engineer / Senior E/I Comm Tech.
GEMA SEM BROWN – SOME JOINT Project
AGX Production Platform –Premier Oil Company.
Prepare vendor Dossier ,Hook up and Commissioning
Nippon Steel Yard, Batam / South Natune sea,Indonesia

Lead Electrical Technician
General Electric France-Cogen Power Plant, Singapore
Pre-commissioning of 2X 236 MW Gas Turbine Gen. Jurong Island , Singapore

E/I Project Engineer
NOOC – FPSO Wenchang Project –china
Fabrication / Installation & Commissioning of ICSS
Instrument Cabinet s , Total fab yard, Singapore.

Lead Electrical & Instrument Commissioning tech.
Maritima P40,Semi-Submersible Platform- Petrobras
Pre-comm / Commissioning ,Jurong Singapore.

Electrical & Instrument Inspector
SBM Offshore – CHEVRON FPSO KUITO
Offshore Installation and Hook-up Kuito Oil Field, Angola

Electrical & Instrument Inspector
SBM Offshore – PETROBRAS FPSO ESPADARTE
Vessel Marine Refurbishment/Conversion and Topside
Interface & Commissioning ,Keppel Shipyard, Singapore

Jan.1998 to May 1999 : Jurong Technologies Industrial Corporation.
Engineer 1
FPSO Construction Inc. - PETROBRAS FPSO-P37 Marine and Topside E/I Installation .Jurong, Singapore
Tuas Power Plant
Utilities MCC / Switchboard modification and upgrading
Tuas , Singapore.

May 1991 to Aug 1997 : Sirte Oil Company
Electrical Maintenance Technician/Planner
High line transmission & power Distribution export Import
To Petrochemical complex, Gas Plant ,Gathering Center
Gas and Oil Separation Plant.
Marsa El Brega , Sahl, Raguba Desert , LIBYA

Nov.1989 to Sept.1990 : IMCO-Instrument Installation & Maintenance Company
Electrical & Instrument Technician
Kuwait Oil Company Gas Plant Maintenance Wafra, Kuw
Kuwait National Petroleum Corp. Mina Ahmadi Refinery
Sub-Station Electrical Maintenance .Ahmadi , Kuwait
Getty Oil Company – Oil Gathering Center
Maintenance , Mina Al zoor , Kuwait.

Jan.1987 to June 1989 : EEI – Engineering Equipment Inc.
Electrical technician / Inspector
JGC – Japan Gas Corp-KNPC Project
Gas Plant upgrading and Modification –Ahmadi Refinery
Braun Transworld Corp.- KNPC Project.
Kuwait National Petroleum Corp. Modernization Project
Mina Abdullah Refinery , Kuwait.

July 1983 to Oct.1986 : LICRONPHIL – Lakeview Industrial Corporation
Electrical and Instrument Man
Petrochemical Plant/ Utilities power plant maintenance.
G.M.A. , Cavite Philippines.

General Work Summary
. Commissioning , Operation & Maintenance :

Electrical

Receives Project Documentation and undertakes Scope of Work related to discipline
Lead a team to undertake commissioning activities in small projects
Interfaces with other disciplines to ensure integration of activities
Implement and test the subsystems as per project commissioning test sheets
Preparation of method statements, procedures and routines where required
Interface towards Pre-commissioning and company personnel
Reports on work progress, bringing to notice potential problems or delays and recommends solutions
Assist during the database preparation for Pre-commissioning status index and commissioning technical database
Plan, monitor and assist in Vendor activities as required
Ensure temporary supplies and commissioning spares are adequate for the subsystem testing
Perform inter-discipline checks
Compliance in accordance with HSE standards
Execute commissioning procedure with clients , construction team, subcontractors and vendors.
Involved in all HV Generators ( 5 nos.) Solar/ Neuvo pignone/ Rolls Royce in transient load Test Applied by step load ).
Performed complete testing & commissioning for LV/HV Switchgear & Air circuit breaker, Including controlling circuit protective device function test with interlock and alarm & indication controlling system.
Assist in I/O loop checks, system simulation, setup and function test alternator excitation panel.
Involved in commissioning of High voltage Bus Bar and HV cable including High pot testing.
Assist in I/O control Wiring loop checks, system simulation setup and function of thruster & propeller operating system with controlling ,interlock and alarm system.
Involved in testing and commissioning of HV THRUSTER Motor, and GTG Auxillary motor. operation protection & interlock function test and simulation of safety protection system.
Testing & calibration of Main Switch board, Emergency Switch Board including ACB & Protective devices ( Over current , Earth fault Relays, Reverse Power Relay, Panel Amp. meter and metering devices and adjust ,calibrate and configure Alstom Gem start 4.3 Motor relay management protection to PDCS/ELSS. Load sharing &power management system.
Responsible on testing and commissioning of MCC/Switch board protective devices such as: Digital signal stop, Running , healthy trip signals indications, analog signals current & voltage indications, start & stop commands. These includes PLC inputs/output modules. Simulation test
push button control Local/Remote and Start/Stop commands Emergency Stop,MCCB Breaker protection such as: LSI Setting for various motors electrical controls, safety cut-off etc.
Responsible on testing and commissioning of LV/MV Switch board such as: control wiring check, Bus bar mechanical torque, Contact Resistance test ( Ductor test ), Megger Insulation Resistance test, earth test , Flash Voltage test, and protection relay setup .primary/secondary injection.
Carry-out Electrical function test on Variable speed drive control panel ,SF6 Circuit breaker, Power Transformer ( Electrical sensing device CT/VT, Thermometric Relay, Oil pressure relay , ( Bucholz relay ).
Calibration, Testing, & Repair of Generator and transformer protection with various sizes and voltage variation from 440V – 110V such as : Over current Relay, Differential Relay, GE Multilin Supervisory Relay, Micom Relay and metering instruments.
Operates Micom P241, PMS, ELSS, PDCS, MMR, and Micom P642 Feeder Management relay.
Assist in commissioning of two 236 MW GE Gas Turbine Generator ( cogen power plant ) and Auxiliaries motors .
Commissioning of various type of Electric Motors from ranging fractional Horsepower to 350 KW.
Involved in commissioning of steering gear operation , control system, function test.
Experienced with centralized power Distribution to unmanned well head platform to FPSO.
Responsible on pre-commissioning / commissioning of UPS System GUTOR/CHLORIDE/SAFT and AEG. Hands on assistance to the vendor on commissioning of UPS on Charging/Discharging of Batteries, and Load test and Responsible on Energizing of UPS Power supply for all Instrument cabinets, and telecom equipments.
Re-setting of motor and winding protection relays ( Merlin Gerin seam 1000+S20 and S40 ), Over current relay, under voltage , earth fault relay and frequency relay. Voltage injection to the Main Bus / MCCB /CT Polarity ratio test ,VT flick test
Preparation of standard inspection checklist and outstanding defective and non - conformance work ( punch list ) system and equipments.
Red marked /as built drawing base on actual installation and operation of Electrical equipments on the field.
Check Electrical system boundaries base on system process requirements.
Prepare Job Safety Analysis/Task Risk Assessment and Permit to work before carry out pre-commissioning / commissioning activities.
Ensure strict implementation of PTW System that remain in force throughout the project and follow all LOTO-Lock –out Tag –out. Procedures including isolation and de-isolation.
Rendering assistance to PTW Coordinator for LOTO of HV / MV / LV Electrical Equipment and Instrument system.
Prepare ( LUN ) Livening up notice for Energizing of E/I Equipments.
Responsible as Authorized Electrical person to perform Isolation and de isolation.
Prepare inspection test report for Pre-commissioning. Prepare ITR Check sheet upon completion of the system task.
Routine Inspection of all running equipment of all areas of responsibilities such as; HV/LV Motors, Utilities equipments : Air Compressor, Nitrogen/Instrument Compressor, Water chiller, Steam Boiler, Cooling tower pump motor, and Diesel Generator.
Perform Rack-in & Rack-out of HV/LV Circuit breaker & Isolator switch as per maintenance plant safety procedures.
Responsible for all lighting around the process area perimeter. Check and simulate starter motors through DCS, RSS, LSS, and check Switch board interlock & safety cut off by means of ESD Through Fire & Gas.
Installation and Maintenance of all lighting system in all areas of responsibility, Disassemble Electrical equipment and apparatus determine and carried out repair.
Trouble-shooting of Different types of Electric Motors & Control starter.
Conduct the following test of Power Transformer such as: Die electric strength of Mineral Oil insulation, Low Resistance test, Megger Test, Hi-pot test AC/DC Method, Simulation test of protective devices during preventive maintenance schedule, Draining used carbonized insulation oil and top up new oil insulation to the desired level.
Repair on Tap Changer (Offload), Change gasket, O-ring seal and Breather silica gel. Fixing & Repair main Oil tank, Oil level indicator, Coupling ,Bucholz Relay ( Oil Pressure relay) and Thermometric Relay.
Filled up Nitrogen to its required level/Pressure range, Reprocesses and Filtration of used Oil Bake used silica gel to remove moisture .
Testing of HV/LV feeder power cable of Turbine Generator/ Diesel Generator by means of Megger Insulation Test, and Hi Pressure test.( Hi-pot)
Check /Trouble-shooting of HV/MV/LV Feeder buried cables, Locate and Rectify the faults using cable tracer TDR –Time Domain Reflectiometer, EXCOPAC-for cable locator and ECHO Meter for tampering machine the cable faulty.
Carry out Preventive maintenance schedule of Electrical Equipments such as: Generator ,Transformer LV/HV switch gear ,UPS, etc.
Prepare a plan for Preventive maintenance of all Electrical Equipment on my area responsibilities. And proposed a corrective measure to avoid breakdown of the equipment.
Hands on cable joint and termination of HV/LV Cable ranging voltage from 220V to 13.8 KV.
Operational, Parallel & Synchronizing Emergency Generator to Main Diesel Generator, and Dummy load test to check the load capability of the Generator.
Preventive Maintenance of various parts and components of Electrical equipments ; UPS Cabinet Inverter,& Rectifier, Battery Charger, Battery bank and capacitor bank for power correction. And various size of Electrical motors & starter.
Responsible on Trickle Charging of 24VDC Battery Charger for the stand-by Generators.
Trouble-Shooting HV/LV Switchgear by testing the fixed and moving contacts of Isolator. Energize the CB ( closing/tripping) and Isolate from the Bus Cubicle during repair and preventive maintenance period. Check the wiring of Closing coil , Tripping coil and micro switch.
Check Charging spring of CB and Close/Trip the Breaker electrically / Mechanically, Cleaning & and moving mechanism.
required level. Apply contact grease on knife blade of the isolator switch and check the condition of contact points.
Removed carbonized oil insulation from Oil Circuit Breaker and top up new Oil insulation to Adjust Breaker contact point, Charging spring archute quencher, and repair the Breaker isolating interlock Performed voltage measurement on the Discharging residue, Change voltage on HV side of the Transformer, Busbar, and feeder cable on both phases.
Carry out DC Pressure test on HV/LV Vacuum Circuit Breaker, VT and main Bus using DC Flush Tester, Perform Ducter Test on each VCB, VT and main Bus using MicroOhmeter 600A. Performed ratio test on VT/CT using SVERKER 750 Programma Relay Test system ,for Current Voltage injector, and verify all signal alarm of Switchgear on PMS-Power Management System.
Keep Daily log on on Maintenance activities and prepare accomplishment report on daily basis.

Instrument

Livening up of Control panels , PLC, Remote instrument terminal unit or remote input / output unit.
Preparation of work pack on Instrument loop dossier and functional test for system handover to client.
Supervision of technician doing various instrument loop checking & simulation test from (CCR) Cargo control room through DCS,PCS,ISS, Safe guarding system to the field and its corresponding interlocks.
Hands on experience in Instrumentation loop checking through cause & effect shutdown matrix , function check , field and bench calibration of various instrument such as: SDV, LT,PT,FT,PS.TT, and Level gauge.
Perform to operate DCS consul during loop checking ,functional test of the following instrument devices such as:FG, Turbine Control , ICP Panel, HPU, WHP Control panel, SCSSV ( Sub surface safety valve, fuel gas system ,gas scrubber etc.
Function check & trouble-shooting of shutdown control valves. Assist vendor in commissioning start up of Diesel & turbo generator, Air Compressor , Fire water system, water injection, turret mooring system, HPU and Marine electrical and instrument equipments.
Ocular inspection/calibration and trouble-shooting of various level control and operated motor control valve.
Line checking on instrument /telecom cables. Simulation of marine main engine alarm system , CO2 , PAGA , and Navigational equipments such as: Helideck peremeter lightings, X mass tree lights , gyro, steering gear , echo sounder, auto telephone ,beacon sounder , etc.
Gained more experience in the commissioning of gas and oil platforms mainly involved in thesystem/dynamic commissioning, Cause & Effect and FLD (Functional Logic Diagram) verification/testing/modification. Also involved in the Electrical equipment/panels/UCP/MCC/SWGR/PMS interface/control/shutdown circuits functional testing, loop testing and system commissioning. Conversant/familiar with International standards/specifications and Instrumentation/Control & Fire/Gas design philosophy and specifications including HAZOP analysis. Involved in the FAT (Factory Acceptance Testing) of project equipment and inspection of E & I installation works (during construction or prior to commissioning/hook-up).
Mainly involved in the preparation of subsystem drawings, subsystem/checksheets assignments for each instrument/equipment, system/subsystem dynamic commissioning and preparation of commissioning handover documents including as-built drawings.
Calibrate of instrument such as control valves, controllers, recorderindicators,transmitter, etc. Loop check control system. commission of process instrument. Clean all parts of instruments before installation. Dealing with instrument functional identification instrument balloon and instrument lines. Connect and repair instrisically safe devices, commission and loop check process instrument and control system. Check the site were the instrument are going to be installed. doing maintenance jobs in accordance with the refinery and petrochemical plants standards.
Logic testing and functional checks of the utilities and process systems prior to start-up which Includes fire and gas, oil and gas separator, bilge system. Supervise sub-contractors activities during loopcheck and commissioning help construction to initiate changes according to client requirements and ensure installation in accordance to approved technical specification. Termination, calibration loopcheck, functional check, logic test and troubleshooting of all process and electrical loops including fire and gas detection system. Data logger testing from instrument going to PLC to ensure that the data is well recorded for data acquisition. Supervision of pre-commissioning. Preparation of necessary documents for the system and functional testing with the accordance to client specification. Carry out Pre-commissioning checklist to ensure all outstanding punch had been done prior to handover.



©2013  PostJobFree.com - Home - Latest Resumes - Post a job - Update or Delete my resume