RESUME
POST : Electrical Technician
Name : Manoj Dhirubhai Dabgar
Address : *, **********, ***. ****** *******,
Gajrawadi, Vadodara-390 004
Phone : +919*********, HOME+919*********, +919*********
E-mail : ucy9bk@r.postjobfree.com
Birth Date : 23rd June 1977
Cast : Hindu
Sex : Male
Marital Status : Married
Nationality : Indian
Languages Known : English, Hindi & Gujarati
Hobbies : Reading & Music
Passport Detail :
Number Date of Issue Date of Expire Place of Issue
J-1358117 07 July 2010 06 July 2020 Ahmedabad
QUALIFICATION
I have completed APPRENTICISHIP TRAINING IN THE FIELD OF ELECTRICIAN from date 01/04/1997 To 31/03/2000 in the JYOTI LTD.
WORK EXPERIENCE
COMPANY NAME PERIOD DESIGNATION NATURE OF WORK
QATAR Engineering & Construction Company W.L.L. 15/03/2010
TO
28/05/2010
(75 Days) ELECTRICIAN TECHNICIAN
“QCON” in Doha Qatar at NGL-3 Short term Assignment an Electrician Technician
KENTZ OVERSEAS LTD.
Engineers & Constructors 17/12/2009
To
04/02/2010 INSTRUMENT TERMINATOR (ASSISTANT INSTRUMENT TECH) Kuwait Oil Company (K.O.C.)
Site for GC-24, Sub contract SK E&C. Pre commencing work
M.S.AL-SUWAIDI INDUSTRIAL COMPANY
Saudi Arabia
16/05/2007 To 16/05/2009 (2 Years)
ELECTRICAN I had working ARAMCO NGL PROJECT at yambo gas;
Installation of Electrical equipments, cable laying, glanding terminating.
Installation of all kind of cable tray system.
Installation of HTLP & Control PANELS with busbar alignment.
All type of lighting power outlet and fire alarm system installation and testing.
Maintenance of batteries and charging systems.
Installation and measuring of
Grow Undying system
CATHODIC PROTECTION SYSTEM
Saudi kayan U&O project at Jubail
Installation of cathodic protection such as a anode ribbon rebar clips,conductor bars, refenceElctrode,systemsNegative,instrument negative cables, spot welding and testing for electrical continuity.
QATAR Engineering & Construction Company W.L.L. 18/10/2005
TO
17/12/2005
(2 months)
ELECTRICIAN TECHNICIAN
“QCON” in Doha Qatar at NGL-3 Short term Assignment an Electrician Technician
Hazira Port Private Limited (Surat)
01/03/2006
TO
30/03/2006
(1 months)
INSTRUMENT TERMINATOR
I was working in Engineering and Construction Work as an Instrument Terminator. I have worked with C.N.G. Gas project in pre commencing work.
JYOTI LTD. (Switch Gear Plant)
01/04/1997
TO 11/10/2005
(8 years)
ELECTRICIAN TECHNICIAN All leading maintenance and construction work as an Electrician Technician to see the fault finding and repairing the machine, General wiring, conduit wiring, D.G. set and Power house operating system, Panel wiring, Circuit breaker, wiring thermal power plant as a GOP I.P.C.L. Plant, EOP I.P.C.L.
Plant, GAP I.P.C.L. Plant, P.P. I.P.C.L. Plant, CAN I.P.C.L. Plant.
ANAMI ELECTRONIC
01/06/1995
TO
30/01/1997
( 1Year &
6 months)
ELECTRICIAN All leading Maintenance Work as a Technician Assistance to see the fault and repairing the calculator and Banking fesit machine. Heavy water plant G.S.F.C. Fertilizer (G.R.) Gujarat Refinery.
I here by present my resume and I assure you that i am able to work in any circumstances. I will give best service honestly.
Yours Faith Fully
Manoj D. Dabgar
Attachment:
1. Experience Certificate of Qatar Engineering Construction Co.
2. Experience Certificate of KENTZ OVERSEAS LTD. Engineers & Constructors.
3. Experience Certificate of M.S.AL-SUWAIDI industrial service co. ltd.
4. Experience Certificate of Qatar Engineering Construction Co.
5. Experience Certificate of Jyoti Ltd.
6. Experience Certificate of R.C. Thapa .
7. Experience Certificate of Anami Electronics.