CURRICULUM VITAE

Bayani Maluto Monzon Home: + (634*-***-****

7500A Beach Road Cell: + (65) 9130-6618

**-*** *** ***** ********* Email: u0q3lp@r.postjobfree.com

Singapore 199650 u0q3lp@r.postjobfree.com

Profession: Construction, Management, Estimating, Bids Proposals, Contract, Procurement, Field Supervision.

Nationality: Filipino

Passport # / Exp. Date: XX4708682 - Oct. 7, 2014

Personal Employment Pass G5587208U - May 8, 2012

Professional Qualifications: Bachelor of Science in Electrical Engineering

Membership: Society of American Military Engineers

Breakdown of Experience:

Oil and Gas/Industrial 15 yrs Engineering Procurement Construction & Management

Pharmaceutical 07 yrs Engineering Procurement Construction & Management

HV T&D Line, S/S, U/G Cable 10 yrs Engineering Procurement Construction & Management

Commercial (High Rise, Hotel) 03 yrs Engineering Procurement Construction & Management

Work Experience:

I. Hiap Seng Engineering Ltd Singapore Feb.11- Feb.12 Project Manager

Responsibilities:

• Manage to control all activities that influence the progress of works, manpower, safety, materials, delivery, design, engineering, construction, commissioning, documentation and turnover.

• Responsible for overall operation to ensure all departments shall progress accordance with the client’s requirements.

• To lead and implement cost control measures to meet budgeted cost estimates and to achieve targeted gross profit.

• Review commercial issues, contract scope of works, variations, additional works, schedule and accomplishment.

• Attend weekly progress meeting with client to discuss progress, potential problems and solutions.

• Prepare weekly report, monthly report, budget estimates, cash flow and commitments.

II. Synertec Asia Pte. Ltd Singapore May 07 – Jan. 11 Sr. Construction Manager

Bid Proposals/Tendering

Responsibilities: Estimating in Synertec Asia Head Office

• Interact with Regional and Senior Management in the proposals preparation, presentation and strategy analysis.

• Supervise teams of estimating professionals and work closely with all areas of management for procurement, subcontracting, engineering, construction and project management to develop successful competitive bids.

• Coordination of resources in project controls and accounting to provide necessary historical data and project and operations costs data for utilization by estimating.

• Review progress of each proposal on a regular basis and provide reports to respective Managers and ensure compliance within the budgets and schedule.

• Maintain and up-date listings and standard write-up.

FEED Design Study Location Year USD

• Central Utility Facilities Malaysia 2011 30m

• Tablet Manufacturing Facility Australia 2011 20m

• Plasma Fractional Facility Singapore 2011 8m

• Acme Specialize Pharmaceutical Bangladesh 2010 13m

• Beximco New Cephalosporin Bangladesh 2010 12m

• Fit-out of Blood Fractionation Singapore 2010 10m

• Industrial Biotech Facility Malaysia 2009 25m

• Nutritional Facility Malaysia 2009 10m

• Tablet Manufacturing Facility Malaysia 2008 25m

• Fit-out of API Facility Singapore 2007 20m

Project Completed Location Contract

1. Kinetic Bitumen Rig Singapore EPC

2. Saint Jude Medical Malaysia EPC

3. Abbott Manufacturing Singapore L.S.

4. Pharmaniaga Life Science Malaysia L.S.

5. GlaxoKlineSmith Biological Singapore EPCM

Bulk Vaccine Facility (EPCM Foster Wheeler)

Responsibilities: Sr. Construction Manager

• Provide construction expertise during FEED, detailed design in the form of constructability, reviews, scope minimisation and ensuring adoption of the company’s global safety standards in each delivery.

• Responsible for day to day technical direction and implementation by the construction and development team for infrastructure as directed by GSK Director and Project Manager

• Monitor and coordinate closely with Foster Wheeler Project Director & Construction Managers to ensure the project is constructed in accordance with design, budget and schedules; including interfacing.

• Overall responsible for all aspects of Construction including Health, Safety and Quality for oil, gas & petrochemical

• Ensure that all work is to the required standard and that all drawings, specifications, inspections and certifications are strictly adhered to.

• Review and approve contractor competencies and method statements design and installation proposals.

III. Foster Wheeler Sendirian Berhard Brunei Jun.06 - Apr.07 Senior Project Engineer

• EPC Brunei LNG Sendirian Berhad (BLNG)

• Power Project Rejuvenation and Shutdown Works

Responsibilities:

Equipment 2 x 21MW 11KV GE Gas Turbine Generator, 2 x 13MW 11KV Steam Turbine Generator Nouvo Pignone, 1 x Heat Recovery Steam Generator Siemens, 33KV & 6.6KV Electrical Distribution Systems, DCS, Ancillaries, Deareator, Piping, Structural, Civil and Tie-Ins (Hot-Tapped Work).

Assisting FW Engineering Manager in directing the assigned Discipline Engineers in the management and performance of assigned engineering functions for the Project which includes:

Reviewing and approval of work responsibilities of the disciplines ensuring all documents conform to the engineering quality; technical standards and completeness required of the project and are reviewed/checked in accordance with Project Procedures. Resolve conflicts in the areas of interfaces between engineering disciplines. Approving design changes ensuring corrective action is taken where required. Co ordinating the activities and schedules of the discipline engineers and support services personnel assigned to the project including Technical Audits and Corporate review. Approval of timesheets and control of man-hours expended against budgets. Participate in engineering progress meetings and preparing minutes of meetings. Responsible for reviewing the engineering Sub-Contract to determine significant parameters, time schedules, estimates and definitions of the major task areas. Implement project variation procedure. Co-ordinate modification and engineering interface issues. Interface with the client through the Engineering Manager ensuring our client's internal procedures, policies and engineering practices are carried out

IV. Foster Wheeler Pte Ltd Singapore Nov.05 - Jun.06 Construction Manager

• EPC PAC 6.6KV / 460V Substation B2 & C3 Upgrade Shutdown Works

• Exxon Mobil Manufacturing Engineering, Singapore

Responsibilities:

• Initiating, planning, executing, controlling, and closing of the construction project.

• Manage resources and ensure that all work is carried out in compliance with the required HSE

• Attend weekly progress meeting with client to discuss progress, potential problems and solutions.

• Responsible for overall operation to ensure team progress in accordance with the client’s requirements.

• Resolve all issues between client, consultants, and contractors and facilitates job interfacing with various disciplines

• Manage to control all activities that influence the progress of works, manpower, safety, materials, delivery, design, engineering, construction, commissioning, documentation and turnover.

V. Marathon Petroleum Company Singapore Oct.04 - Oct.05 E & I Superintendent

• EPCM Alvaheim FPSO (Floating Production Storage & Off Loading) Conversion capacity 1.0 million barrels

• Marathon Exploration and Production Norway

Responsibilities

• Monitoring works assistants to ensure their correct supervision of subcontracted works, material orders and specialist supplier services in compliance with established program, progress and costs objectives, as part of a wider objective to optimize manpower.

• Coordinating program schedules for works carried out directly and works handled by subcontractors, solving contingent problems on site, optimizing the use of materials, work teams and available equipment and ensuring the correct upkeep of equipment and assets used.

• Solving co-ordination, priority and interface problems between the different work categories within the specified area, while respecting the wider interests of the project.

• Monitoring works assistants to ensure the correct implementation of construction activities in compliance with quality standards/requirements and safety standards

• Approving design changes ensuring corrective action is taken where required and implementing the project variation procedure and monitor budget cost

• Ensuring that all construction activities are performed in a safe way through rigorous implementation of company and project HSE requirements

VI. Saipem Pte. Ltd Singapore Aug.03 - Sep.04 Sr. Electrical Engineer

• EPCM ERHA FPSO (Floating Production Storage & Off Loading) Hull Capacity 2.2 million barrels

• ESSO Mobil Exploration and Production Nigeria Ltd.

Responsibilities

• Review and approved of work that conform to the engineering quality; technical standards and completeness

• Monitor progress of HV/LV switchboard, UPS, MCC, battery charger, bus-duct, and auxiliary equipment

• Approving design changes ensuring corrective action is taken where required implementing variation

• Monitor punch list clearing for smooth operation of commissioning activities in line with schedule

• Prepare reports on job progress and participate in /minute engineering progress meetings

• Coordinating interfaces between engineering disciplines

VII. ABB Industry Pte Ltd Singapore Feb.01 - Jul.03 Project Manager

• Responsible for overall operation to ensure all departments shall progress in accordance with the client’s requirements.

• Manage to control all activities that influence the progress of works, manpower, safety, materials, delivery, design, engineering, construction, documentation and turnover.

• Review and monitor commercial issues, contract scope of works, field variations, additional works, schedule and accomplishment.

• To lead, manage, motivate and implement cost control measures to meet the budgeted cost estimates and to achieve targeted gross profit.

• Attend weekly progress meeting with client to discuss progress, potential problems and solutions.

• Prepare weekly report, monthly report, budget estimates, cash flow and commitments.

Project Completed

1. Merck Sharp and Dohme Pharmaceutical Plant 2 Foster Wheeler

2. Schering Plough Pharmaceutical Multi Product Plant 2 Foster Wheeler

VIII. Tyco Fire, Security Services Singapore Jan.00 - Jan.01 Project Manager

Contract Management

Responsibilities: Contract Management

• Approve progress claims for work completed and refer disputed claims by subcontractors to the procurement manager and engineering manager for resolution.

• Arrange calling of quotations and letting of contracts within prescribed cost limits to provide contract management services to project teams.

• Arrange for quotations to be called from subcontractors for projects and for contracts to let

• Select and pre qualify suitable vendors/subcontractors.

• Draft terms and conditions for invitation to tender.

• Conduct negotiations with subcontractors.

Project Completed

1. Global Switch Singapore Carrier Facility EPCM

2. Asia Global Crossing Sturhub Data Centre EPCM

IX. Tyco Engineering & Construction Malaysia May.98 - Dec.09 Project Manager

Estimating/Bid Proposals

Project Completed

1. Shell Rebuilt Electrical and Instrumentation Works.

2. MLNG Electrical Installation & Commissioning Shutdown.

3. Silicon Wafer FAB

Responsibilities: Estimating Manager

• Set up estimating team and develop company data bank facilities using ESMAT 2000.

• Coordinate with sales and customer service activities ensuring the groups are working effectively to meet customer’s expectation and timely manner.

• Visited various clients throughout Indonesia to market Tyco capability to expand network and establish business relationship.

• Organize bid project development schedule, coordinate with appropriate engineering sections and departments.

• Review each bid document before submission if comply with client’s requirements.

• Review contract agreement if according to all respective correspondences.

X. P.T ODG Wormald (Tyco Group) Indonesia Jan.94 - Apr.98 Projects Manager

Proposals/Estimating

Responsibilities: Projects Manager

• Responsible for overall operation to ensure all departments shall progress in accordance with the client’s requirements.

• Manage to control all activities that influence the progress of works, manpower, safety, materials, delivery, design, engineering, construction, documentation and turnover.

• Review and monitor commercial issues, contract scope of works, field variations, additional works, schedule and accomplishment.

• To lead, manage, motivate and implement cost control measures to meet the budgeted cost estimates and to achieve targeted gross profit.

• Attend weekly progress meeting with client to discuss progress, potential problems and solutions.

• Prepare weekly report, monthly report, budget estimates, cash flow and commitments

Project Completed

1. Musi Pulp Paper Mill

2. Anoa Gas Re-Injection

3. Nabisco Biscuit Factory

4. Irian Jaya Power Plant C Mine Site

5. Gunung Salak Geothermal Turbine 1 and 2

6. Batu Hijau 150KV/33KV Transmission Line

XI. Alfanar Company Saudi Arabia Apr.81 - Nov.93 Projects Manager

Contract/Tendering

Responsibilities: Projects Manager

• Responsible for management of particular project in conformity with client requirement and standards

• Plan, set, follow & achieve the mile stone dates with respect to program chart.

• To represent the organization and enhance relationship in dealings with client consultants and regulatory authorities to ensure all agreements are implemented.

• To maintain records of any extra works undertaken to ensure Company billing covers any additional costs to clients.

• To supervise work teams for effective delivery of daily objectives including the control of works hours, overtime and incentive schemes to improve efficiency.

• To manage resources and equipment to achieve contract completion within budget and time.

• To liaise with the QHSE department for the support for the project safety and or quality to ensure Company Quality, Health, Safety and Environment policy and procedures are covered to client satisfactions.

• To respond to emergencies and take remedial action as required to ensure health, safety and the environment are protected.

• To identify and ensure skills of assigned manpower are aligned to project requirements to ensure technically competent personnel for the project.

• To participate in regular meetings to identify problems, targets dates, issues, delays execution of work to ensure timely project completion.

Project Completed Year USD Contract

1. Sajir Electrification and Generation 1981-1983 72M EPCM

2. SCADA for Layla-Aflaj Region + 2 years Maintenance 1995-1999 105M EPCM

3. Hail Electrification, Substation & Generation + 2 years Maint. 1997-1999 153M EPCM

4. Qurayat Power Plant 2 x 40 MW BBC Gas Turbine 1990-1992 95M EPCM

5. Power Generation 13.8KV 2 x 120MW Rolls Royce GT 1992-1994 105M Turnkey

SPECIAL TRAINING / SEMINAR ATTENDED:

biSAFE Level 2 Singapore 2010

Current Good Manufacturing Practice (CGMP) Singapore 2008

Glaxo Smith Kline Biological Bulk Vaccine Facility

Oil / Petrochemical Industry Safety Course for Supervisors Singapore 2006

NTCU Workplace Safety & Health Training Centre Singapore

Wins PC’S Monitoring and Reporting Singapore 2005

Saipem Singapore Pte Ltd

Project Quality Assurance Team (PQAT) Singapore 2003

Schering Plough Tuas West Singapore

Current Good Manufacturing Practice (CGMP) Singapore 2002

Merck Sharp & Dohme Technology Singapore

ISO 9001 Awareness Course Singapore 2001

Tyco Fire & Security Singapore Suntec

Microsoft Project Malaysia 1999

Tyco Engineering Kuala Lumpur, Malaysia

ISO 9000 Awareness Course Indonesia 1997

ODG Wormald (Tyco SEA) Jakarta, Indonesia

ESMAT 2000 Computer Estimating Perth Australia 1995

Tyco Engineering & Construction (SEA) Perth, Australia

REFERENCES:

Gus Abdallah Managing Director Synertec Asia HP 65-91832571/601-********

Sam Williamson Director Merck & Dohme Pharmaceutical HP 65-96638714

Oliver Arango U & F Manager Abbott Manufacturing HP 65-93370564

Don Grubb General Manager Pharmaniaga Life Science HP 601-********

EMERGENCY CONTACTS:

Florida Corazon R. Monzon Director Nursing (BSRN) Wife HP 63-928*******

Maria Rizza R. Monzon Medical Doctor (PHD) Daughter HP 63-921*******

Jose Bayani R. Monzon Jr. Registered Nurse (RN) Son HP 63-915*******

Victor Joseph R. Monzon Dentist (DND) Son HP 63-927*******

OWNER’S APPRECIATION LETTER OF PROJECT TARGET COMPLETION:

Pharmaniaga Life Science Malaysia EPC

PAC 6.6KV / 460V Substation B2 & C3 Shutdown Singapore EPC

Merck Sharp and Dohme Pharmaceutical Plant 2 Singapore Lump Sum

Schering Plough Pharmaceutical Multi Product Plant 2 Singapore Lump Sum

Malaysian Liquified Natural Gas Shutdown Malaysia Lump Sum

Gunung Salak Geothermal Turbine 1 and 2 Indonesia Turnkey