Harrison & Son's Enterprises, LLC
PO Box **
Hobart, OK 73651
Off 580-***-****
Cell 405-***-****
tmz3t4@r.postjobfree.com
Steve Harrison, PE
DOB - 1/1/1946
Marital Status: Divorced
Family: 2 Children, 5 Grandchildren
Resume'
Skill Summary
Well Site Supervision, Miscible Floods (Water, Nitrogen, CO2), Reservoir Analysis
Drilling/Completions Engineering, Work-over’s, Production
Prognosis Review/Composition and Implementation
Vertical/Directional, & Horizontal Drilling
Planning/Engineering and Supervision
Drilling & Completions Engineering
Horizontal/Directional Drilling
Budgets/Planning/Work Overs
Drilling with Casing
Worked in:
US Locations
AR, OK, E. & S. TX, TX Panhandle, CO, WY, ND, AL, NY, LA, W. VA
Overseas Locations
Romania, Mexico
Oil/Gas Software:
Adobe, Bengal, DIMS, Peleton Well View, PERC, Aries, Well Cap, BOP, MS Office
DrillPro – 30, MD Totco Rig Monitor, Pason Rig Monitor, Epoch Rig Monitor,
Mud Mod – 2000, DS - Well Pro & Drill Pro, Landmark
Work Experience
Harrison & Sons Enterprises, LLC. - Consulting Engineer
Customer Job assignments: 1983 – Present
• T& S Petroleum Consultants (PMEX) (Weatherford) 3/2009 to present
• Drilling/Completions Engineer for Central Mexico Project (40 rigs)
• AFE's; Drilling Prognosis, Casing Design, Drilling Mud prognosis, Daily Operations Supervision, Reservoir Analysis, Economic Forecasting
• Multi-well pad drilling utilizing "S" curve configuration w/8-12 wells per pad.
• Supervision of 4 Drilling Superintendents, 65-80 Well Site Supervisors, 8 subordinate engineers.
• EnCana Oil & Gas (USA), Inc. 6/2008 to 3/2009
• Drilling/Completions Engineer for S. Texas properties - Supervised 32 Personnel
• Location Construction, Directional drilling & planning
• AFE's; Drilling Prognosis, Casing Design, Drilling Mud prognosis, Contractor/Vendor selection, Daily Operations Supervision, Reservoir Analysis, Economic Forecasting
• Horizontal wells in Pearsall Shale - 6,000 ft laterals @ 9,000' TVD
• Operations Supervision (Tourly Safety meetings, Drilling Mud Supervision, Rig Operations)
• Daily Reporting w/Well View Software, Reservoir Calculations w/Aries Software
• Well Site Supervision (Including Supervision of Supervisors) - Drilling & Completion
• Completion Prognosis, Casing Programs & Design, Peroration/Frac Design
• Facilities construction including production equipment selection.
• Contract Suspended until 2nd quarter of 2009
(Due to New Acquisition of Partner's Leasehold Interest in the S. Texas Project & awaiting AFE billing approval to new partner)
Plains Exploration & Production Co. – Houston, TX 1/2008 to 6/2008
Work Over Engineer for S. Texas Acquitions - Supervised 22 Personnel
• Production/Re-work/Operations Engineer w/Drilling Engineering Duties
• Worked 1st 2 months in Houston Office as a Drilling/Completions Engineer
• S. TX formations were Vicksburg Gas and Frio Oil zones
• Production was enhanced by CO2 floods in several areas on a trial/experimental basis.
• TX panhandle formations were Morrow Shale & Cleveland Sand
• Transferred to field operations in Texas Panhandle
• Re-completions – S. Texas (Starr & Hidalgo Counties)
• AFE Compilation/Prognosis generations/Economic/Reservoir Analysis & Forecasting
• Drilling/Completions Engineering – S. Texas
• Field Operations supervision (Re-work & Drilling)
• Compressor Operations Supervision – S. Texas
• Production Engineering – Operations/Supervision
• Well Site Supervision – Drilling/Completions – Texas Panhandle
Contract completed 6/2008
Petrohawk Energy 9/2007 – 11/2007
Drilling Engineer Supervised 26 Personnel
• AFE composition, Drilling Prognosis, Geo/Proximity Steering, Bit Selection, Drilling Fluid Operations, Daily operations supervision of 6 drilling rigs, 2 field foreman, 1 Drlg Supt, & 6 Well Site Supervisors located in NW Louisiana.
• Reservoir/Economic Analysis & Forecasting
• Responsible for Operations, Safety, & Days vs. Depth curves & betterment awards for rig personnel. Had 1 rig able to better drilling curve for 4 straight wells. (12,500’ in 15.5 days)
• All wells were drilled in various Cotton Valley Formations.
• Resigned after 6 weeks of not being paid.
XTO Energy 2/2007 – 9/2007
Well Site Supervisor Supervised 35 Personnel
• Daily supervision of field operations on drilling rig in SE Oklahoma.
• Daily reporting with Well View Software
• Vertical and Horizontal wells (5,500' laterals) in Atoka Shale.
• Assisted in prognosis composition, implementation & review.
• Contract completed 9/2007
Cyrus Energy, Facility Planning/Evaluation Engineer 12/2006 – 1/2007
• Preformed financial and safety surveys for potential purchases of property in the Texas Gulf Coast area as well as California and Colorado.
• Property included both Plant Operations as well as Field Production
• Final report included reserves & Plant Processing analysis as well as safety & OSHA compliance implementation forecasting for existing facilities
• Preparation studies for upcoming OSHA inspections, Aries processing of existing reserves as described.
• Contract completed – 1/2007
Conoco/Phillips - Well Site Drilling Engineer/Planner 4/2006– 12/2006
Supervised 18 Personnel
• Powder River/Wind River local of Wyoming & Williston Basin – North Dakota
• Drill Site Supervision/Engineering/ PDC Bits/ Site Preparation
• Prognosis Review & Implementation/AFE & Budget compliance
• BLM/State Regulatory Reporting & Compliance Vendor Selection/ HSE Supervision & Compliance
• AP Processing, “Well View” reporting (converted from DIMS). - horizontal wells w/short turn radius drilled under balanced, co-plane wells with multiple 5,000’ laterals drilled under balanced.
• Prognosis Review & Implementation, Site Preparation, BLM/State Regulatory Reporting, Vendor Selection
• Short turn radius horizontal wells drilled primarily with zero returns that were co-planed in 2 directions of 5000’ each
• Contract completed 12/2006
Striker Petroleum, LLC. Dallas, TX, Sr. - Petroleum Engineer 11/2004 – 3/2006
Supervised 125 Personnel
• Drilling & Completions, 1031 sales and Engineering, SEC compliance
• Oklahoma Cherokee Basin, Anadarko Basin, East & South Texas, AL & NY
• Geological/Reservoir Analysis for prospect generations & investor information
• Drilling/Completions Engineering & prognosis, lease Purchase and NRI Structuring
• Casing Design, Cementing Design, Drilling & Completion Fluids Design
• Stimulation/Frac Design, Artificial Lifts, Work-Over Engineering
• Field & Operations supervision for work over Operations & Daily Production
• CO2 Miscible Floods with partial H2O injection & pH monitoring.
• Prognosis/Engineering/ Seismic & Geo-Chem Evaluations
• Compiled Master Service Contract for company/ Damage/Easements, OCC /BLM & BIA Filings
• Conducted HSE instructions for daily & H2S training
• Well Planning, AFE constructions/ Lease Acquisitions, Contract Negotiations
• Horizontal Well Planning & Supervision, Damage/Easement Settlements
• Well Site Construction/ Supervision for both drilling & completion, Well tie-ins, HSE Compliance.
• Daily Production operations, employee supervision.
• Gas sales & transportation via company owned & operated transportation lines & compressor facilities.
• Operations Manger/Facilities Engineering/ Field Supernatant Supervision (21 employees)
• Contract completed 3/2006
Amarada Hess - Well Site Drilling Engineer 4/2004 – 11/2004
• Williston/Dickenson, ND Supervised 18 Personnel
• Duties included daily supervision of drilling operations of Horizontal/Directional wells
• Operations were that of short turn radius horizontal wells that were primarily drilled without returns for 4000’ to 5000’ of lateral extension.
• Most of the drilling was preformed as new (2nd) laterals on existing wells
• Aided in writing drilling Prognosis and dealing with day to day drilling engineering issues.
• Coordinated all casing running, cementing, and vendor selections & payments
• Contract completed 11/2004
Transion Oil & Gas, SA., Sr. Petroleum Engineer/Operations Mgr 4/2003 – 3/2004
Politest, Romania Supervised 28 Personnel
• Planning Sales contracts, Production/Reservoir Surveillance & Analysis, seismic evaluation consultations w/consulting geologists.
• Lease Acquisitions and Contract Negotiations, Economic Forecasting w/Aries software.
• Natural Gas & Heavy Oil Production
• A/P for all Vendors Property Acquitions, International import/export of drilling & completion equipment
• Production Superintendent, Operations Manager, Well Site Supervision
• International Banking Supervision for entire company operations within country. (Romania)
• Governmental lease and production/sales negotiations with country of Romania Oil & Gas Commissioners
• Wells were planned & operated by fields. (Geographical areas). Conditions varied from field to field.
• Operations were halted when the company ran out of money & failed to pay bills 3/2004
Cherokee Drilling, Inc., (Charleston, WV) Petroleum Engineer & Drlg Supt 9/2002 – 3/2003
Supervised 62 Personnel
• Company had 3 drilling rigs, which I supervised; rigs & personnel, as well as standard operating company, which solicited S.E.C., regulated drilling & operating funds.
• Well Planning, Lease Acquit ions, Production/Reservoir Surveillance & Analysis
• Drilling Supt/Engineering, Electric Log Analysis
• Supervision of field Engineers, Tool Pushers & Well Site Supervisors
• Directional/Horizontal Drilling & Planning & trajectory control.
• Seismic & Geo Chem Evaluations for reservoir analysis & economic forecasts.
• Partnership engineering reporting per SEC guidelines compliance w/investor standards.
• NOTE: This Company was both a drilling contractor as well as an Oil & Gas Producer/Operator with serious cash flow problems. Work ceased when company payroll checks failed to clear.
Binger Operations, LLC Supervising Engineer (Central OK) 1/2000 – 9/2002
Supervised 11 Personnel
• Drilling Engineering of Horizontal Wells w/miscible N2 flooding utilizing Air Hammers & Horizontal Wells w/2000’ laterals @ 10,500’ TVD.
• Bit Selections/ HSE Compliance
• Government grant processing (85% of revenue was from US government grants
• Air drilling w/fluid assist. Drlg Footage record w/Patterson Drilling Rig 574
• Contract completed 9/2002
Air Drilling Equipment Co., Inc., OKC, Supervising Eng/Mgr. 4/1991 – 1/2000
Supervised 8 Personnel
• Mid-Continent Supervising Engineer, Sr. Drilling Engineer/General Mgr.
• Well Completion Flow Back operations, Time Reporting/ HSE Compliance
• Air Drilling Operations, Employee Supervision, Equipment Maintenance (Areal, Joy, Quincy)
• Consulting - Drilling Fluids Engineer- Anadarko Basin
• Maximum depth - 27,386 ft. - SW Anadarko Basin (Beckham County, OK)
• Contract completed 1/2000
Gulf Oil, Field Engineering Supervisor GOM - (Leeville, LA) 3/1988 - 4/1991
Supervised 54 Personnel
• Drilling Rig Supervision (offshore Leeville, LA - 46 miles)
• Drilling Operations Prognosis Implementation & Compliance
• HSE Compliance, Crew Training
• 28/28 Rotation
Contract completed 4/1991
Greeley Gas Co., - Cortez, CO - Field Engineer 4/1984 – 3/1988
Supervised 9 Personnel
• San Juan/Paradox Basin, Piceance Basin, W. VA, NY, AL
• Well Site Supervision (easements, site & road construction, Drilling & Completion Operations)
• These were the initial CO2 wells drilled by shell in Montezuma County CO, wells in Mesa County, CO in the Parachute, CO valley basin, which were air drilled.
• Contract Completed 3/1988. Company Sold 3/1988.
International Well Fluids, Inc., Drilling Fluids Engineer 11/1977 – 3/1984
Supervised 22 Personnel
• Co Owner & President of company – Okla. City, OK
• Served as President & had 1/3 ownership of company, Corporate Governance
• Experience in the Williston Basin, SW CO, OK, TX & OK Panhandle, SW KS
• Mud Engineering/ Drilling Fluid Sales, Service & Warehousing
• Drill Pipe Corrosion, Sales, Service, Products
• State/Federal Tax compliance, Customer/ Employee Relations
• A/R & A/P, HSE Supervision/ OSHA Compliance (MSDS issuance)
• Completed undergraduate work @ University of Oklahoma – May 1982
• Company Closed 3/1984 due to lack of work & drilling bust in USA.
Baroid Petroleum Services - Perryton, TX Mud/Sales Engineer 7/1976 – 11/1977
No Personnel Supervision
• TX Panhandle Bulk Plant operations supervision
• Proficient in drilling lost circulation formations with lower HPHT gas zones
• Operations supervisor specializing in:
o Tight emulsion oil based drilling fluids, Loose emulsion oil based drilling fluids
o HTHP Drilling fluids, Completion Fluids, LSND = Amoco Systems
o Gel Chemical/Polymers, Salt/Brine Systems
Resigned for affiliation with International Well Fluids
BJ Hughes, Inc., Perryton, TX. Cementer/Frac Treater 9/1973 – 7/1976
Supervised 35 Personnel
• TX Panhandle – Perryton, TX
• Oil/Gas Well Cementing & Hydraulic Fracturing
• Job Supervision – (Cementing & Hydraulic Fracturing)/(Cement Slurry Engineering)
• Frac Fluid Engineering/ Pump maintenance = (Pacemaker)
Resigned for affiliation with Baroid Petroleum Services
Diamond Shamrock Corp. 5/1968 – 8/1973
• Engine Record Man/Compressor Mechanic/ Pumper/Production Foreman
• Supervised 8 Personnel
• TX Panhandle = Perryton, TX
• Engine Record Man – Daily recording and reporting of all gas compressor operations.
• Daily Maintenance/Operations & Overhaul of Natural Gas Compressors as a mechanic. (68 - 69)
• Transferred to Production dept in May 1969 and worked as a company “Switcher” which was a job as both a Pumper and Nat. Gas Compressor Operator/mechanic.
• Promoted to Production Foreman in June 1970
• Daily checking & maintenance of onsite Oil & Gas wells, Lease Operations - (facilities management),
Remedial Stimulations, LACT operations, Artificial Lifts
Resigned for Affiliation with BJ Hughes, Inc.
U.S. Army - Intelligence Specialists 8/1966 – 8/1968
Commanded 55 Personnel
• MOS 11D40, Completed 67 hrs college credit – USAFI accredited through The University of Maryland while serving in the Army @ Seoul, S. Korea - Decorated May 12,1968
Served 2 year draftee requirement
Education
• AA – Agricultural Business Administration, Cameron College Lawton, OK-1964 - 1966
• University of Maryland – (United States Armed Forces Institute) – 67 accredited hrs. Seoul, Korea-67 - 68
• BS – Petroleum Engineering - University of Oklahoma, Norman, OK-1981- 1982
Trade Schools
• Drilling/Completion Fluids Engineering - NL Baroid Petroleum Services - Houston, TX
•Oil/Gas Well Cementing, & Hydraulic Fracturing - BJ Hughes, Inc. - Midland, TX
• Horizontal Drilling Techniques School - US Dept. of Energy - Denver, CO
•Cathodic Protection - Nat. Assn. Corrosion Engineers - Denver, CO
• LEAP certification – US Dept Energy – Denver, CO
• Electronics, ICS - Scranton, PA
Licenses/Certifications
• IWCF Drilling Supervisor Certification (Well Cap) = University of Oklahoma/ (exp) Feb 2010
• CDL Drivers License w/Hazmat Endorsements = State of Oklahoma/ (exp) Sept 2009
• Oil – Gas Well Cementer Certification = B.J. Hughes, Midland, TX/June 1974
• Drilling Fluids Engineer Certification = N.L. Baroid, Houston, TX/July 1976
• Initial Professional Engineering Registration = State of Oklahoma/May 1982
• H2S Certification = Oiland, Inc., Blackwell, OK May/2006 (4th certification)
• BOP Certification = University of Oklahoma/(exp) Feb 2010
• Water Well Driller License = State of Oklahoma /June1992
Awards/Memberships
• World Footage Drilling Record (Diamond Insert Bit) - Hughes Christensen - 1999
• Rig Footage Record for Company Rig - Patterson Drilling – 2001
• Membership award – US Gas Standard Codes board - 2002
• VFW –Lifetime Member since 1967
Areas of Experience
Anadarko Basin – TX/OK Panhandle GOM - Off-Shore LA
San Juan & DJ Basin - Rocky Mts. W. VA Mts., Appalachian Range
Bobocu/Pontian – Romania S. Texas (Rincon Field/Maverick County) - Mid-Continent
Williston Basin - Mid-Continent Selma Caulk - SW Alabama Fingers Lakes - Upstate NY East Texas Chalk - Mid-Continent
S. Texas (Sonora, Laredo, Eagle Pass) - Mid-Continent Cherokee Basin - Mid-Continent (OK)
Osage Basin - Mid-Continent- (N. OK) SE AL, S.W. MS - Gulf Coast
Powder River/Wind River basins – Wyoming Piceance Basin – Rocky Mts. (NW CO)
N.W. LA (Cotton Valley & Haynesville Shale) SE OK (Atoka Shale)
Central Mexico
Computer Programs Operated
Microsoft Office, Excel, Word, Access, Power Point, Business Plan Pro, Quick Books, MS Dos, Lotus,
Oil/Gas Related
DrillPro – 30, MD Totco Rig Monitor, Pason Rig Monitor, Epoch Rig Monitor, Mud Mod – 2000, DIMS, Peleton Well View, PERC, Bengal, Landmark, Aries
(Insurance Certifications, References, Oil/Gas Certificates & Certifications available on request)
(Passport Current - expires 9/2013)