Post Job Free

Resume

Sign in

Engineer Project

Location:
680770, Singapore
Posted:
March 21, 2012

Contact this candidate

Resume:

PROFESSIONAL RESUME

NAME : NORMAN B. NUQUI

HP # +65-90859720

Email Add: t76tt4@r.postjobfree.com

POSITION : PIPING DESIGN ENGINEER

EDUCATION : Bachelor of Science in Mechanical Engineering

Golden Gate Colleges

Batangas City, Philippines

PASSPORT NO. : EB0719585

NRIC NO. : S7465629C

BIRTHDAY : 28 March 1974

EXPERIENCE SUMMARY:

With more than fourteen (14) years of work experience in piping engineering, involving in design, construction and maintenance of piping systems of pharmaceutical, petrochemical, refineries, oil and gas (FPSO), and geothermal power plant. Capable of preparing layout in accordance with standard specifications; prepares plans and isometric drawings manually, 2D AutoCAD, and micro station. Prepare piping route using 3D auto plant and Plant Design System (PDS) software, and know how to use PDMS software for stress isometric drawing purpose. Review pipe routing using explorer for auto plant and Smart Plant Review (SPR) Work on field for construction and design, includes inspection, estimate, prepares and schedule the construction and erection. Performs collecting of technical information on site for verification and preparation of as-built drawings. Field checking of physical configuration of piping layouts. Capable of performing evaluations on construction for preparation of technical queries and field instructions. Prepare commissioning procedure of various systems.

SPECIFIC EXPERIENCE:

Worley Parsons Ltd. (HYDROCARBON) / CADSKILLS PTE. LTD.

Site Office-Jurong Shipyard

Piping Design Engineer

PTTEPA Montara Recovery Project

MV FPSO Remediation a& Modification

August 23, 2011 to Present

Review project specifications, administrative and technical practices, design instructions. Refer to JIS standard for existing piping. Responsible for the preparation of new piping design layout as per Client instruction, verify and check actual configuration of piping on ship compare to PDMS model. Review P& ID and isometric drawing in the work pack issued by WP Thailand Ltd, update discrepancy and send back to WP Thailand for model update. Prepare material take off of piping including pipe support. Develops detailed design and submit plan, section and isometric drawing of new pipe routing using Autocad. Coordinate with client/owner representative for technical queries and proposed new design. . Prepare site instruction and issued to client contractor for fabrication, do site check as per request by WP Perth design team. Prepare/design new escape walkway platform and staircase/cage ladder

as per safety requirement.

Submit progress report to Project Engineer for weekly status update of work packs issued by the client.

EQUINOX OFFSHORE ENGINEERING

c/o Sembawang Shipyard

60 Admiralty Road West

Singapore 759956

Asst. Lead Design Engr.-Mechanical/Piping

Equinox-ARV1/ARV2 PROJECT

November 03, 2008 to August 17, 2011

Responsible for the preparation of mechanical/piping activities, including review of man-hour estimate. Interface with different discipline for work activity plan. Checked existing P&ID, plan drawings for the demolition activities. Provide instruction for designers as per scope of work, study and familiarize with the project specifications, contractors scope of work. Study and give instructions for new machinery equipment layout for the conversion of ship. Review project specification as per class approval and apply approved cad standard in all drawings.

Study and review existing material specification and update as per ship conversion requirement, currently involve in preparation of new P&ID for new Auxiliary Engine for its basic system requirement such as fuel oil, diesel oil, and lube oil, high and low temperature cooling water system etc. Prepare MTO for all new piping system. Review and update Master Document Register (MDR) for deliverables. Assigned in preparing commissioning procedure of different systems and was included in sea trial for seven (7) days for Dynamic Positioning (DP) testing of the ship in South China Sea.

Assigned on shipyard for field engineering assistance, prepare site instructions for modifications of piping system and coordinate with the mechanical and piping contractor for issues raised. Provide immediate solutions for technical queries raised by contractor on site. Do line checking and issue pre-hydro test and post hydro test punch list of the piping system. Check and marked up P&ID for the test limits and coordinate with the Sembawang Shipyard QA/QC Inspector prior to hydro testing of piping system. Sketch and update piping drawings as per actual site condition and submit as-built drawings of piping general arrangement drawing and P&ID in AutoCAD accordingly.

PROSAFE Production Pte. Ltd.

1 International Business Park,

# 10-01 The Synergy

Singapore 609917

PIPING DESIGNER

Van Gogh APACHE PROJECT (FPSO)

October 4, 2007 to October 31, 2008

Develop and update process P&ID. Prepares line list, tie-in list and master valve list, prepares conceptual and detailed piping layout using AutoCAD. Reviews specification and codes apply to design. Coordinate with other discipline as per design update and discrepancy. Check and verify layout as per latest information. Provide detailed engineering design of piping interface in main deck going to pump and engine room using 2d AutoCAD. Assigned on site (shipyard) for construction and pre-commissioning assist, update 3d model using 3d auto plant. . Coordinate and handles different site contractor for different modules. Do line checking with the contractor prior to pre-hydro test of piping system. Assist and provide solution for technical queries raise by the contractor. Prepare and submit final as-built drawings. Prepare and submit pre and post hydro punch list item to contractors. Witness and accept hydro tested piping.

Jacobs Engineering Singapore Pte. Ltd

(T & L Engineering Services)

29 International Business Park,

# 03-01 Acer Building, Tower A

Singapore 609923

PIPING DESIGNER

1. GSK-R&D CHEMDEV PILOT PLANT AND HYDROGENATION PROJECT

2. WYETH PHILS. DRYER 3 EXPANSION PROJECT

April 03, 2006 to October 2, 2007

Responsible in 3D pipe modeling of piping system at External areas, Roof and riser piping from process line using 3D autoplant software. Extract isometric drawing from 3D Autoplant, Checking/Verifying marked-up isometric drawings using autoplant explorer. Check/Resolve and approved clashes reported in clashing reports.

Assigned in checking of extracted isometric drawing from 3d autoplant, as per piping general arrangement drawing and P & ID. Interface with other discipline for design information change as per client’s comment and vendor drawing requirement. Perform overall discipline coordination in the project, check and back check all the clashes involving architectural and civil/structural penetrations for process drain and utility piping, electrical, hvac and sanitary lines.

Prepares penetration plan drawings using AutoCAD attaching all relevant discipline drawings for exact whole opening of floor slab and wall opening.

Keppel FELS (Subsidiary of Keppel Offshore & Marine)

(T & L Engineering Services)

50 Gul Road, Singapore 629351

PDS PIPING DESIGNER

PETROBRAS NETHERLANDS B.V.

Petrobras 51 (P-51) & Petrobras 52 (P-25): Floating Production Unit, Semisubmersible Hull.

December 16, 2005 to March 30, 2006

Assigned in As-built 3D pipe modeling of piping system at Pump Rooms such as Portside/ Forward, Starboard/Forward, Starboard/Aft & Portside/Aft. 3D modeling of piping system using Intergraph Plant Design System (PDS). Checking/Verifying marked-up isometric drawings as per actual site conditions/ pipe routing.

Update piping general arrangement and piping support drawing for as-built using microstation. Assigned on site for as-built drawings as per actual site condition.

FLUOR DANIEL INC. - PHILIPPINES

PIPING PDS DESIGNER II

Dow/PIC 0L2K Project Al Shuaiba, Kuwait

May 9, 2005 to November 4, 2005

Assigned as Piping Designer II, responsible for piping design development and piping arrangement drawing using PD Draw and Plant Design System (PDS) for FEED. Coordinate with the lead engineer on the priority areas to complete for submission to the client. Coordinate with other discipline for interfacing of model. Provide information and submit extracted stress isometric drawing for pipe support location and loading calculation. Responsible for the modeling of pipe line at piperack from new Utility Area to EQUATE existing utility unit. Counter check model error from Interference Detection Process (IDP) to assure quality of extracted isometric drawings.

JAPAN GAS CORPORATION, PHILIPPINES (JGC)

-PIPING PDS DESIGNER/ ENGINEER

BAPCO LSDP HDU Revamp Project Manama, Bahrain

June 25, 2004 to May 2005

Assigned in site survey activities in BAPCO Refinery (Bahrain), to verify new tie-ins in HDU/ HCU area. Prepare conceptual design layout as per P & ID’s, Plot Plan, specification, and international standard, piping information to other discipline, pipe support anchor point location and thermal displacement implementation, planning and estimation. Prepare sketches of tie-in point location for new plan drawing and isometric drawing. Responsible for the preparation of new piping design / layout for the relocated Sour Water Tank and Area 63 for its new pump and tower. Prepare detailed engineering in Manila office, includes piping information to civil, electrical, mechanical and instrument for the design requirement using PDS software. Responsible for modeling of new piping route to existing piping. Revised design changes as per comment of JGC Yokohama in PDS model and countercheck in Smart Plant Review (SPR).

-PIPING ENGINEER /DESIGNER

SOHAR REFINERY LLC. Project Sultanate of Oman

March 15, 2004 to June 24, 2004

Assigned in controlling all of the NPIC’s (Notice of P & ID Change) and NPPC’s (Notice of Plot Plan Change)

In all areas. Prepare material take off in Off-site Fire Water System and prepares fabrication drawing for special piping assembly. Performs manual / computer layout using standard drawings, specifications, design instruction, plot plan and flow diagram.

ARCC / EEI CORPORATION

-QUALITY CONTROL ENGINEER (PIPING)

SAUDI ARAMCO-BGP Project Jubail, Kingdom of Saudi Arabia

February 2003 to November 2003

Worked as Piping Quality Control Engineer, responsible for the line checking and punch listing of different piping systems. Assigned in different types of testing of piping such as bolt torquing, tensioning, hydro test and pneumatic testing of lines. Coordinate with the ARAMCO inspectors for visual inspection of welding for piping and pipe supports. Responsible for the acceptance of piping during restoration. Also assigned in site engineering for the preparation of test packages and as-built drawing for submission with the client.

KELLOG BROWN AND ROOT PHILIPPNES (BRISPI)

-PIPING ENGINEER (Full Time)

BITUMEN IMPORT FACILITIES Project Tabangao, Batangas City

September 2002 to February 2003

Assigned in project material control, coordinates in all discipline for the material needed as per project requirement. Assist construction group in execution of erection of structure, piping, and equipment. Coordinate with JGC site representative for the design queries during construction. Update progress report and submit to Site Manager.

J & S CONSULTANCY (ENGINEERING SERVICES)

-PIPING DESIGNER

NHMJ Project JAPAN

July 2002 to September 2002

Assigned in assigning of pipe support in piping plan and isometric drawing, prepare isometric sketch with detailed pipe support to use. Take off material requirement for piping and structural support as per design and develops detailed design using AutoCAD application. Review and apply project specifications, standard drawings, and design instructions during detailed engineering.

EEI CORPORATION

-PIPING ENGINEER

UNITED LABORATORIES WHSE (UNILAB) PROJECT Mamplasan, Laguna

April 2002 to July 2002

Assigned in handling fire protection subcontractor during construction. Supervised, prepares schedule and provide instruction as per priority activities for construction. Coordinate with the client for the design changes and other discipline for other parallel activities. Prepare fabrication shop drawing as per approval of the client. Attends weekly meeting for the progress report of assigned subcontractor.

EEI CORPORATION

-PIPING ENGINEER

PNOC-EDC REFURBISHMENT Project Tongonan, Leyte

October 2001 to April 2002

Assist in the design of client’s additional cross country piping for the geothermal power plant. Prepare fabrication shop drawing of Rock Muffler and piping isometric as per approval from PNOC Design Department. Check and prepare punch list items prior to hydro test and post hydro test. Provide estimate number of drawings to produced, and control all drawings as assigned. Review AFC documents (design drawings, specifications, and vendor data).

EEI CORPORATION

-PIPING /QUALITY CONTROL ENGINEER

MALAMPAYA ON SHORE GAS PLANT Project Tabangao, Batangas City

December 2000 to August 2001

Responsible in the early completion and acceptance of piping system for the Malampaya On Shore Gas Plant, through coordination with the Foster Wheeler and SPEX Inspector. Coordinate and raise technical query with the site engineering for the design changes thru checking with Smart Plant Review (SPR) and give instruction to operation.

EEI CORPORATION

-PIPING ENGINEER

ANALOG DEVICES PHASE II Project Gen. Trias, Cavite

May 2000 to December 2000

Responsible in the preparation of all piping isometric drawing from piping plan and P & ID given by Fluor Daniel site engineering. Raise technical query for the design changes as per vendor and engineering drawing. Performs manual / computer layout using specification, standard drawings, design instruction, plot plan and flow diagram. Assist in providing fabrication shop drawing for special support on site run piping. Estimate and reconcile all the change order for final cost work plan.

KELLOG BROWN AND ROOT PHILIPPNES (BRISPI)

-JR. QC ENGINEER (Temporary)

CALTEX REFINERY SHUTDOWN San Pascual, Batangas

April 1999 to September 1999

Assigned in Quality Control department, responsible in preparation of isometric drawing for the new piping for tie-in. Responsible for the endorsement of new weld joint for radiography and liquid penetrant test. Prepares documentation for acceptance of piping system for pre-hydro and post-hydro testing.

EEI CORPORATION

-PIPING LEADMAN

SHELL REFINERY SHUTDOWN Tabangao, Batangas

March 1998 to August 1998

Prepares isometric drawing and take off piping material. Responsible in the layout and fabrication of new piping for tie-in and hydro testing of line prior to start-up.

EEI CORPORATION

-QUANTITY TRACKER

GAS OIL DISTILLATION UNIT (GODU) Project Limay, Bataan

December 1994 to April 1995

Assigned in estimate of cost of material, consumables, equipment and manpower requirement. Prepares and report progress of piping erection, testing and acceptance of piping system to submit with the client for claims.

EEI CORPORATION

-PIPING LEADMAN

SHELL TABANGAO ASSET RENEWAL (STAR) Project Tabangao, Batangas City

May 1993 to December 1994

Responsible in take-off of materials, fabrication of piping spools for compressor, furnace and turbine areas and erection of piping spools as per schedule. Assist hydrotest group in preparation of line system for testing.

SKILLS AND KNOWLEDGE:

Design, construction, computations and inspection.

Computer literate in MS Excel, Word, Power Point Application, AutoCAD 2000,3D Autoplant

Plant Design System (PDS), PDMS (Basic), PD Draw, Microstation and Smart Plant Review (SPR)

CHARACTER REFERNCES:

Available upon request.



Contact this candidate