Post Job Free

Resume

Sign in

Manager Project

Location:
San Jose, CA, 95148
Posted:
April 19, 2011

Contact this candidate

Resume:

SUBIR BASU

**** ** ********* **.

San Jose, CA. 95148

408-***-**** (Cell)

408-***-**** (H)

svyx7v@r.postjobfree.com

SUMMARY

Seven plus years of experience in implementing Agile PLM solutions using Agile 9.2, Oracle 10i and process modeling and mapping for various clients. Accomplished Oracle Agile Database PLM Developer/Consultant experience in interacting with Business process users analyzing business process, user requirements, design and Configuration, dry test run in software lifecycle development projects, data modeling and legacy migration, IQ/OQ and workflow analysis in Electronic, Medical device and Semiconductor industries, looking for Process Architect/Solution Architect position in a growth oriented Company

SKILLS

Agile PLM 9.2.3.1, Agile Scrum Methodology, Steering Committee, Agile PC, PPM, PQM Module, Oracle SOA Suite 10.1.3, Application Server, Installing Agile PLM with OAS, Requirement gathering, Software Test protocol, Upgrade File Manager, Database server, Configure design attributes, Role and privilege, PLM Arena, URS, SRS, Specification, Workflow, SQL+, SDD, Agile Server Installation Protocol, IQ/OQ, PQ, TM, CR, VSR, i2 MDM, i2 eSource, eDesign, Part Configuration, Data Migration, SAP MM, Bills of Materials, Attributes, Manufacturers, AVL, System Architecture, Data Model, work Instruction, cPDM, Configuration of File Manager, Project Planning, Agile Database, Application Server, Web Proxies Installation, SAP MM, Capacity Planning, CM Forecast, Scenario Planning, SQL+ script, CAPA, Quality Audit. JDE ERP System implementation and integration with MES,, MRP, MAX, SPC, Six Sigma Green Belt, Datasweep MES 6.1, SPC, Six Sigma Green Belt, Project Management.

RELEVANT EXPERIENCE

Sr. Process Architect/Business Analyst Abbott Diabetes Care. (Abbott Lab Inc.), Alameda, CA 05/10 – 03/11 (Contract job)

• Achieve significant cost savings implementing and managing Agile 9.2.1.3 File Manager Server Installation Agile PLM for Server installation, Process Extension, role remediation and SDK Batch job Integration sprint projects. Lead Agile team in sprint projects gathering requirements from users, defining system requirements, defining Business process architecture, ERD, Classification Schema, Database sizing analysis and Workflow configuration for change control process of EC, AC and MC relating managing and collaboration of product record information, requiring administration and updating roles and privileges, custom searches via Agile UI, Forms and Reports, Dry test run for various business rules and criteria, set relationship rule. Communicate the vision of the Create and update production and validation workflow in production environment, configuring synchronization of design attributes, assign, create, inactivate roles, privileges to users

• Key contributor for managing and generating Risk Analysis Product Deployment Plan, SDD, SRS and URS, Use Case, Change Request, VSR, IQ/OQ, PQ, Traceability matrix, execution and verification of File manager Server Installation and File Migration to new Server.

• Facilitator of Steering Committee meeting. Responsible for ensuring that all documentation accurately reflects the current status of changes and outstanding issues so that business requirements reflect application features and functions

• Responsible for managing Disaster Recovery Plan and Agile Administration Plan.

• Responsible for troubleshooting day to production issues,

Sr. Process Architect, R&D, Biosense Webster Inc. (Johnson & Johnson Company), Los Angeles, CA 07/09 – 05/10 (Contract job)

• Achieve cost savings implementing Agile PLM and defined ERD relating Agile PC module to add, review and upgrade EC, AC and MC, understand existing user requirements, generate proposed requirement guidelines, execute Dry test run for various business rules and criteria in Development and test environment, set relationship rule when ECR is added to ECO, analyze and query application data schema, EC validation workflow creation, auto generate item descriptions in Agile PLM. Responsible for ensuring that all documentation accurately reflects the current status of changes and outstanding issues so that business requirements reflect application features and functions

• Achieve cost savings reconciling and organizing error analysis, prepare URS, SRS, on PX project, review SAP iDOC error report to validate accuracy, responsible for data reconciliation, determine reason for error, rectify products that cause error during batch load. Execute Material substitution, match code ID, Material Description and object selection based on associated BOM in SAP

• Responsible for successful configuration, customization and deployment of Agile PLM to map to the customers business process for product development, New Product Introduction and engineering change management, understanding of Agile PLM modules, administration. Generated Part configuration and part inventory list with AVL in Agile PLM system

Project Lead/Engineer, Lens Vector Inc., Mountain View, CA (Contract Job)

June, 08 – Nov. 08

• Contributor of installation of Agile PPM project module in order to manage the movement of projects through UMS system Milestones by managing the approval of all checklist items within each Milestone, gathering Client User Requirements, managing use cases relating documenting system level and function specification, tracking schedule progress of the project to schedule plans by coordinating with subject matter experts.

• Reviewed, analyzed and created detailed documentation of business systems and user needs including workflow, system and operational requirement gathering, ensure and gather clear and concise Business requirements from subject matter experts, generate process flow, program functions and steps required to develop effective business tools. Worked with IT to conduct testing to meet project timelines.

• Developed Business process flow model coordinating with user and software development team to interact MES with Equipments, Deliver Demand Plan and Capacity Constraint Model.

Database PLM Consultant/Project Lead, SanDisk Corporation, Milpitas, CA

Nov. 06 – Apr. 08

• Performed selection of oracle Application server components, installing Oracle Application Server, and Server Patch, deploying Agile 9.2.2.1 Application and verifying Application Server, Copying from Oracle Server to Solaris Server, configured Oracle HTTP server and Agile Application Server cluster, Non Repository Host Server testing Agile Cluster. Configured and validated File Manager in Agile Server Application, monitored, progress and informing project management on all project activities

• Lead Weekly Forecast meeting to discuss opportunities, assess risk and come up with approval decision. Used Agile PPM , Capacity Planning modeling, ER diagram using i2 MDM, store business information using SQL queries, enforce business rules using constraints, updated table structure, generated reports, scheduled projects, allocated resources. Customized configuration of Material Master Data and mapped out Plant, procurement, vendor info, storage location logically using SAP R/3 MM Module. Managed projects to simulate business inventory model, troubleshoot, maintain and associate BOR, Part No. in MDM.

Agile Analyst, General Dynamics, Cupertino, CA (Hardware Industry) Apr. 06 - Nov. 06

• Performed Business process Scripting for Agile 9.1, gathering requirement, Installed oracle Application Server and Server patch, installed Agile PLM, Agile Application Server components

• Involved in upgrading Agile 9.1 Application, Schema upgrade. Lead MRB and 8D+ Team for CAPA of Rugged laptop build reliability and quality issues.

Business Analyst, Align Technology, Santa Clara, CA (A Medical Device Company) May, 04 – Apr., 06

• Achieved cost savings of $82K by rationalizing BOM, AVL, creating ECO thru Agile PLM 9.1 to 9.2, wrote Business Process Scripts. Involved in selection of oracle Application server components deploying Agile 9.2 Application and verifying Application Server, involved in CAPA team for compliance with quality system regulation relating Aligner build, CT Scanning and SLA manufacturing issues.

• Leader of internal and cross-functional team based process development and improvement efforts, chair meetings and lead projects for GAP Analysis, smog test, training of end users

Project Manager, i2 Technology 2000 – 2003

• Managed deployment of eSource and eDesign SCM data service solution to clients. Defined Data modeling using eDesign Data Model Classification structure and Schema mapping to accommodate Client part entities. Deployed custom catalog e-procurement solution to standardize procurement processes to reduce customer cycle times for ordering approval and payment Used GUI relational database.

• Performed data modeling, designed, developed eSource, eDesign solution classification schema, worked with Explore Application Architecture, API Architecture

Program Manager, Smart Modular Technology 1998 – 2000

• Drove Prototype Embedded PCB Assembly, Memory Card, Input/ Output Card product from the concept stage to volume production on time and within budget. Coordinated with relative departments, Supplier, Sub-Contractor and Customer relating gathering requirement and documents relating new and existing product.

EDUCATION B.S. Mechanical Engineering, National Institute of Technology, Durgapur, India

P.G. Diploma, Business Management, Jadavpur University, Kolkata, India

Certificate in Project Management, Integrated Business Technology, CA, USA, 2001

Certificate, Six Sigma Green Belt, Datazinc Inc., CA, USA 2004



Contact this candidate