DUL MOUNG
*** ****** ******, ****, ** *****
CAREER OBJECTIVE
Hardworking, reliable individual seeks a career in a goal-driven, team-oriented environment
EXPERIENCE
****- ***2 MKS Instruments Wilmington, MA
Mechanical Assembly / Test Technician
• Build Ozone Systems from written instructions,followed sequence of assembly operations using bill of materials, wiring diagrams, and assembly drawings.
• Worked in a clean room to assemble gas panels, i-blocks, and tested both assembly products to ensure it pass inspection.
• Install many miscellaneous mechanical assemblies, mechanical components, sub-assemblies using hand tools, power tools.
2007-2010 BellMicro Products Acton,MA
Configuration Tech/ Qaulity Control/ Out of Box Auditor
• Installed software onto PC’s and server, performed correct configuration onto units according to customer specifications by following online instructions.
• Performed tests on configurations, mechanical and visual Inspections on various types of units from Cisco Servers, Nortels, General Dynamics, Cardinal Health, Exagrid, and Hologic systems.
• Responsible for the final process of out of box inspection by following AQL sampling plan to ensure final products leaving company building meets customers requirements.
2005- 2007 Hewlett Packard Andover, MA
Test Technician
• Wiped and tested Compaq, Dell, Toshiba, Sony, Hewlett Packard computers and laptops.
• Installed and replaced system boards, hard drives, floppy drives, processors, memory, power supplies, DVD drives, video cards and other peripherals devices.
• Maintained a clean and safe work area.
• Performed quality control audits and record keeping into company database.
2003- 2004 MetalCrafters Methuen,MA
Electro-Mechanical Assembly
• Applied cover gaskets onto U.S. army tank control box unit under military specifications.
• Responsible for building MRI and X-Ray power supply cabinets, using avdel guns, rivet guns, soldering iron, air drills, and other assembly tools.
• Assembled, disassembled, reworked, and repaired Copley Controls Corps chassis and improved product quality under ISO standards.
• Helped identified improper mechanical assembly problems and took necessary steps to correct the problems, cutting project time length from an average of seven weeks to four weeks.
EDUCATION
1994-1998 Lowell High School Lowell, MA
High School Diploma
2003- 2004 Computer Education Institute Lowell, MA
PC Technician