Name : SOFYANTORO
Address : Mangga street **,Rt *6 Rw 03.Karang kandri
Kec.kesugihan.Cilacap
CENTRAL JAVA-INDONESIA 53274
Place/birth of day : Cilacap,july 26.1984
Height : 173 cm
Weight : 57 kg
Sex : Male
Religion : Moslem
Marital status : Maried
Phone number : 082********* / 082*********
NPWP : 88.145.594.3-522.000
Email : ry74wz@r.postjobfree.com
EDUCATIONAL ATTAINMENT
Elementary Education : Karang kandri elementary school
Junior High School. : SLTPN 02 Maos
Senior High school : Technical Secondary School Boedi Oetomo
Cilacap
Course/Training :
-BLKI CILACAP(Mesin produksi)
-Training Vibration and Balancing fans PT Cistech Alpha Indonesia.
SPECIAL SKILL
• Mechanical technician/Millwright(Maintenance Rotating Equipment)
WORK EXPERIENCE:
1. Company : PT KALTIM SUPACOAL.
Project/location : Tabang-kalimantan Timur.
Classification : Leadhand mechanical technician rotating(Maintenance)
Period of service : January 27,2011 until December 19,2011
Reason of leaving each : Job completed
Work description : Daily monitoring during plant running include :
*check vibration,temperature, level oil and abnormal sound
Troubleshooting and overhoul include
* Balancing,fans,Turbin-generator,Boiler feed pump,Circulating Water pump
secondary air fan,primary air fan,induced draft Fan,compressor
2 .Company : PT SURYA SEMBADA JAYA
Project/location : Project Maintenance[PT Newmont)
Classification : Mechanical maintenance/Millwright
Period of service : August 10,2010 until January,17,2011
Reason of leaving each : Job completed
Work description : Maintenance service in Water treatment process,
Concentrator/grinding area,over Head crane,Sag
Mill,crusher,ball mill and cyclone pump.
3.Company : PT SULZER TURBO SERVICE INDONESIA
Project/location : SDTA Chevron Geothermal Salak
Classification : Mechanical technician/millwright
Period of service : June 25,2010 until July 25,2010
Reason of leaving each : Job completed
Work description. : Remove and install diaphgram,glandseal,trust
bearing and journal.bearing steam turbine.remove rotor steam
turbine and check clearance rotor to lower cassing,Rotor
to upper cassing.Centering rotor and bearing,Alignment
steam turbine and generator
4.Company : PT TRUBA JAYA ENGINEERING
Project/location : Muara Karang Gas Powerplant
Classification : Mechanical technician/millwright
Period of service : February 05,2010 until June 23,2010
Reason of leaving each : Job completed
Work description : Remove upper & lower Bracket bearing,Rotor
Generator,Trust bearing,exciters,Alignment Vaccum Pump Condenser
Alignment ball RE-circullating water Pump 1,2&3.Install New Rotor Generator
(200 MW)
5.Company : PT TRUBA JAYA ENGINEERING
Project/location : PLTU 1 Indramayu 3X300 MW Power plant
Classification : Millwright
Period of service : May 27,2009 until November 14,2009
Reason of leaving each : Job completed
Work of description : Assembly and install Circulation Water Pump,Setting
Guide grovefor trash track and travelling band screen.
Setting and levelling rail for gantry crane 10T and overhead
Crane 30T.Alignment back wash pump and Circulation water pump.
6.Company : PT TRUBA JAYA ENGINEERING
Project /location : Muara karang Gas Power PlantJob T-3106
Classification : Milwright
Period of service : December 03,2008 until May 04 ,2009
Reason of leaving each : Job completed
Work description : Setting and install generator,erection slipring
Seating plate,erection and setting generator seating plate
Bushing,and current transformer,assembly encluoser of
Generator,alignment turbine and generator.
7.Company : PT TRUBA JURONG ENGINEERING
Project/location : T-5084 Mechanical and Piping converting RAPP
Classification : Millwright
Period of service : July 28,2006 until october 10,2006
Reason of leaving each : Job completed
Work of description : Setting and lavelling bucket elevator,alignment pump
Assembly and install cooling tower,levelling and alignment Seating blade
colling tower.
8.Company : PT TRUBA JURONG ENGINEERING
Project/location : Cilacap 2X300MW Coal fire steam Power Plant
Classification : Milwright
Period of service : June 28,2005 until July 15,2006
Reason of leaving each : Job completed
Work of description : Assembly pulfarizer,boiler auxelary,coal mill,coal
feeder,Induced fan,force draft fan,primary air fan,final alignment.
9.Company : PT UTAMA JAYA TEKNIK
Project/location : FNJ-2 Project[PT KOLON INA],Ciujung keragilan
Banten
Classification : Millwright
Period of service : August,2004 until April,2005
Reason of leaving each : Job completed
Work of description : Fabrication,erection,setting fan blower,vessel,pump,
Electric hoist,commisioning and start up
10.Company : PT UTAMA JAYA TEKNIK
Project/location : Drow twister Project(PT Indonesia toray syntetic)
Tangerang-Banten
Classification : Millwright
Period of service : April,2004 until July,2004
Reason of leaving each : Job completed
Work of description : Setting spindle frame,levelling rail joint,setting bobin
Holder,alignment motor to gearbox.
Best regard