PERSONAL DATA
NAME : Pater A.S Pellokila, ST
CONTACT ADDRESS : BTN Tabahria Blok E2/11
Makassar – Sulawesi Selatan 90222
PHONE : 081-***-***-***
PLACE, DATE OF BIRTH : Jayapura, January 14 ,1980
GENDER : Male
MARITAL STATUS : Single
NATIONALITY : Indonesia
PASSPORT NUMBER : A 1166610
COMPEX CERTIFICATE NO. : 24371 (Valid Until May 20, 2016)
BOSIET(OPITO) VANTAGE NO.: 787770 (Valid Until February 17, 2016)
KEY QUALIFICATIONS
More than 6 years of extensive working experiences in various practices on quality assurance / quality control, project planning & controlling, constructions (fabrication), inspections, installations (erection), mechanical completions, & pre-commissioning of Electrical, Instrumentation & Telecommunication of oil & gas project with emphasis on inspection and testing of electrical & instrumentation of onshore and offshore oil and gas such as Service Jack Up Vessel, FPSO, Offshore Living Quarter, LNG Plant and Well Head Platform.
EDUCATION
1998 - 2004 : Hasanuddin University, Electrical Engineering Department
Makassar, South Sulawesi (With GPA 2,85 Scale 4,0)
1995 - 1998 : Senior High School in Jayapura, Papua
1992 - 1995 : Junior High School in Jayapura, Papua
1986 - 1992 : Elementary School in Merauke, Papua
REFERENCES
Frank Skikstein, Site Manager – ABB AS, Tlp : +479*******
Email : r7md4i@r.postjobfree.com
Stale Nerisen, E&I Supervisor - Conoco Phillips, Tlp : +658*******,
Email : r7md4i@r.postjobfree.com
WORKING EXPERIENCES
© Immersive Technologies Pty Ltd (From April 15, 2012 - Present) As Service Engineer
Install, Commissioning, Training & Maintenance of Immersive Product
© ABB AS Under PT. Europe Marine Control Indonesia (From July 18, 2011- December 24, 2011) As Field Engineer/Inspector
ABB – SBM Offshore FPSO Cidade De Paraty Electric House Module (LER Topside) Project At Keppel Shipyard Tuas (Completions Of The Module)
ABB – SBM Offshore FPSO Cidade De Paraty Electric House Module (LER Topside) Project At Wasco Technologies Batam Yard
Mechanical Completion & Punch List Coordinator
Receiving Inspection Report (Material) For Electrical, Intrumentation & HVAC System
Equipment Storage & Preservation
Completed ITR With Client
Testing & Pre-Commissioning Activity
© PT. Megaron Semesta – WASCO Technologies (From April 11, 2011 – July 12, 2011) As E & I Inspector
Petrobras 55 (Roncador Field Development) Electric House Module – Siemens Project
Mechanical Completion & Punch List Coordinator
Pre-Commissioning & Commissioning (SAT) For HVAC System
Complete ITR With Client
Complete Data Sheet And Certificate For All Material
Complete Documention For Final Attachment
ABB – SBM Offshore FPSO Cidade De Paraty Electric House Module (LER Topside) Project
Mechanical Completion & Punch List Coordinator
Receiving Inspection Report (Material) For Electrical, Intrumentation & HVAC System
Equipment Storage & Preservation
Complete ITR With Client
© Master Marine ASA Under Asiapac Commissioning Services Pte. Ltd. (From June 16, 2010 – October 29, 2010) As Electrical Supervisor
L205 Service Jack Up Barge (Haven) Finishing Project (Finishing E&I Constructions Parts For Main Hull, Permanent Living Quarter, Additional Living Quarter (3 Module), Office Module, Helli Deck, & Life Boat Davit) At Nymo AS Fabrication Yard Norway
Review E&I Installation Installation Drawing (Include As Built & Mark Up)
Material & Equipment Inspection
Man Power Arrangement
E&I Installation Construction Activity
Make E&I Installation & Construction Reports
Pre-commissioning Activity
© PT. Wifgasindo Dinamika Instrument Engineering (From March 23, 2009 – June 10, 2010) As Project Engineer
Electrical, Instrumentation, Telecommunication Installation & Pre-Commissioning Project L 205 - Service Jack Up Barge & Permanent Living Quarters For Conoco Philips – Master Marine At Drydocks World Graha
Man Power Schedulling
Review Drawing For E&I Installation (Include As Built & Mark Up)
Project Planning & Controller
Material Arrangement
Project Meeting & Coordination
E&I Installations & Constructions Coordinator
QC Coordinator For MC, ITR & Punch List
© PT. Air Drilling Indonesia (From September 1, 2008 – July 19, 2009) As Aerated Drilling Trainee Supervisor (Operator)
Operated & Maintenance Sullair Compressor (Powered By CAT Engine)
Operated & Maintenance Booster (Powered By CAT Engine)
Operated & Maintenance Chemical Injector Pump For Foam & Inhibit
Install & Maintenance Washington Rotating Unit
Install & Maintenance Hydraulic Valve
© PT. Indokomas Buana Perkasa – Cegelec (From May 09, 2008 – August 31, 2008) As Instrument Technician
BP Berau Ltd. (BP Tangguh) Electrical & Instruments Maintenance Project (Onshore & Offshore)
Assisted BP Tangguh & KJP Commissioning Team
Train 1&2 Process
Gas Production Facilities (Platform/Offshore)
VR-A & B WHP Maintenance
Job Plan & Closing Work Order In Maximo
© PT. Hanindo Automation Solutions / Hanindo Group (From December 14, 2007 – May 08, 2008) As Field Engineer
Design, Install & Commissioning Automatic Tank Gauge (ATG) – Gilbarco & 4Tech
Install & Commissioning Intelligent Forecourt Terminal (IFT)
Fuels Management System ( Fuelomat & Topkat Gasboy)
Petrol Station systems Integration & Automations
Tank Calibration (Underground Storage Tank)
Sales Team Technical Support
© PT. ODG Wormald Indonesia / Tyco Fire & Security (From July 12, 2006 – December 13, 2007) As EAS Engineer
Design, Install & Commissioning EAS System
Demo & Making Technical Site Survey For Customers
Install , Termination & Setting Access Control System (Kantech Security System)
Install, Termination, & Setting CCTV System
Install & Termination Public Address
Maintenance Project For Security & Telecommunication Systems
Sales Team Technical Support
© PT. Mitra Lintas Technology (From May 16, 2006 - July 11, 2006) As Project Engineer For Ericsson RBS & Mini-Link Project
© PT. Mitra Lintas Technology (From November 28, 2005 - March 31, 2006) As Project Engineer (Site Coordinator)
PT. BADAK N.G.L (Security Master Plan Phase I) Telecommunication Sub-Contractor For Tadiran Electronics System Ltd (Israel)
Install & Termination CCTV (Fixed & PTZ Pelco Camera)
Install & Termination Proximity Reader
Install & Termination Intercom
Install & Termination IP Processor On Junction Box For Fence Sensor
Install & Termination Pelco Fiber For Wireles PTZ Camera
Install & Termination IR Detector On KM. 53 Well Head
Install & Termination Yagi Antenna On Beras Basah Island & Old Port For Wireles PTZ Camera
Install & Termination Transmiter On Beras Basah Island For Wireles PTZ Camera
Install & Termination Repeater On Old Port For Wireles PTZ Camera
Integration CCTV
Integration Proximity Reader, Intercom, Push Button & Magnetic Switch
Integration Came Automation (Swing Door, Sliding Gate, Boom Gate) & ElectricTurnstile
Integration IP Processor, Repeater, Network Controller, Card Detector, Terminator Kit For Fence Sensor
© PT. Mitra Lintas Technology (From September 29, 2005 - November 25, 2005) As Rectifier Team Leader & Area Project Coordinator
PT. Indosat Tbk (Eaton Powerware Rectifier Project Sumatra Area)
Install & Commissioning Rectifier (Eaton Powerware)
Maintenance & Troubleshooting Rectifier (Eaton Powerware)
© PT. Truba Jurong Engineering (From December 07, 2004 - May 05, 2005) As Electrician
INCO Project Job T – 7134 (Maintenance and Construction Works) Sorowako – South Sulawesi
Shut Down Kiln # 1 (Working On MCC)
Electric Furnace # 3 (Install, Termination & Maintenance Electrical Equipment On Furnace # 3)
Bag House Furnace # 3 Off Gas Cleaning System Electro Static Presipitator (Install & Termination Electric & Instrument Equipment)
Screening Station # 10 Petea (Working On MCC)
Install & Termination ION Metering in Larona Dam Project And Balambano Dam Project
DC Link Converter (Install & Termination Electrical & Instrument Equipment)
Install & Termination PLC for Turbotak, DC Link Converter & Screening Station # 10
Install & Termination Hitachi Breaker 11 Kv On Switch Yard
Pulling Cable From Breaker 11Kv In Switch Yard To Furnace # 3 Transformer
Cable Tray Arrangement, Installation & Fabrication
Continuity & Lighting System
Sett Current Transformer
Motor Connection
Glanding & Termination
ORGANIZATIONAL EXPERIENCE
© Basic Training Leadership Himpunan Mahasiswa Elektro, 1998
© Organizing Committee of Basic training HME, 1999 and 2000
TECHNICAL SKILLS
© CCTV Installation & Maintenance
© Security System Installation & Maintenance
© Fire & Gas System
© Public Address System
© LOS Survey
© Initial Network Design (RF Survey)
© Rectifier Installation & Maintenance
© High Voltage Installation & Lighting System
© Motor Cotrol Centre Installation & Maintenance
© PLC Installation & Maintenance
© Motor Connection
© Automatic Tank Gauge
© Bench Test (Popping Test) For PSV (Pressure Safety Valves)
© Pressure & Temparature Transmitter Calibration
© Fire & Gas Detector Calibration
© Control Valve, On/Off Valve & Choke Valve Calibration
© Vibration Sensor Install & Calibration
© Lapping valve
© Data & System Integration
© Sullair & Booster Electrical System
© Multi Cable Transit (Roxtec)
INSTRUMENTS AND MEASUREMENT SKILLS
© Garmin GPS 12XL
© Garmin eTrex Vista
© Compass
© Multimeter
© Megger Tester
© Digital Multi Meter Equipment
© BNC & LAN Tester
© IP Processor Calibrasitor (For Fence Sensor)
© DVR & Switcher
© HART Communicator
© Druck Pressure Calibrator
COMPUTER LITERATES
© Operating System: Windows 98, Windows 2000, Windows ME, Windows XP,Vista & Linux
© Microsoft Office (Ms. Word, Ms. Excel and Ms. Power Point)
© Hardware: PC Assembling & Troubleshooting
© Visio Technical Professional & Autocad (2D)
© Networking
© CAT Electronic Technician
ON JOB TRAINING, TRAINING & SEMINAR ACTIVITIES
© April 22 – May 5, 2012
Training at Immersive Technologies Pty Ltd Production Factory in Malaga - Perth & On Job Training in Various Site (Field) around Perth - Australia
Level 1 : Trainer Operation
Level 2 : Setup, Maintenance & Troubleshooting
Level 3 : Administrator Operation
© February 16-18, 2012
Basic Offshore Safety Induction & Emergency Training (BOSIET) and Travel Safely by Boat – OPITO
Approved From M&O Indonesia (Certified)
© February 21-25, 2011
ETAP Power System Engineering Workshop (ETAP 7.5) Conducted By Mille Mega Power Solutions (ETAP Authorized Representative In South East Asia For Operation Technology Inc.)
Workshop Agenda : Load Flow, Short Circuit, Device Coordination, Arc Flash, Motor Acceleration,
Transient Stability & Harmonics Analysis (Certified)
© February 8-9, 2011
PRIMAVERA P6v7 Training From EDP MEDIA Proffesion Learning Center
PMS 101 Planning & Controlling (Certified)
© December 6 –10, 2010
Hazardous Area 5-Day Comp’EX’ Competence Based From Assets Training & Technical Services Pte Ltd
Performing Installation, Inspection, & Maintenances In Hazardous Area (Certified)
© February 23, 2010
CCG Cable Gland Installation Training From CCG Singapore
© August 27, 2009
Roxtec Introduction & Installation Training From Finesco Engineering PTE LTD (Certified)
© July 22, 2009
Introducing & Practice Of Oglaend System From Oglaend System Singapore PTE LTD
© September 12, 2008
First Aid Level One Training Program From International SOS (Certified)
© September 11, 2008
Safe Start Advanced Safety Awareness Training From PT. Air Drilling Associates
Introduction & Overview
Eyes On Task & Mind On Task
Line-Of-Fire & Balance/Traction/Grip
Rushing, Frustation, Fatigue, & Complacency
Critical Error Reduction Techniques
© September 10, 2008
H2S Safety Awareness Training Program From PT. Air Drilling Associates (Certified)
© July 10, 2008
Introduction & Training Ventil Test Unit For Pressure Safety Valves From EKC – ERNST KOMROWSKI GMBH (Vendor) & BP Tangguh
Pressure Safety Valve Test
Body Test
Safety Valves Unit Test For Equipment Maintenance
Introduction & Training Lapmaster Model 15 & Model LM24 Equipment For Lapping From EKC – ERNST KOMROWSKI GMBH (Vendor) & BP Tangguh
© June 23, 2008
SIMOPS Training From KJP Tangguh LNG Project
© June 22, 2008
Fall Protection Training From KJP Tangguh LNG Project
© June 20, 2008
Basic First Aid & CPR From International SOS & KJP Tangguh LNG Project
© June 20, 2008
GPF/NUI Platform Induction From BP Tangguh LNG
© June 19, 2008
Authorized Gas Tester From Petrofac – BP Tangguh LNG
© June 17, 2008
Confined Space Entry Training From Petrofac – BP Tangguh LNG
© June 12, 2008
Induction Skill From KJP Tangguh LNG Project
© June 11, 2008
Work Management Systems (WMS) – MAXIMO Taining & Implementation From BP Berau Ltd
Commissioning Transitional (CTT) Training From KJP Tangguh LNG Project
Malaria Movie Training From KJP Tangguh LNG Project
© June 10, 2008
Confined Space Entry Training From KJP Tangguh LNG Project
© May 13, 2008
Sea Survival Training From PT. Safetindo Perkasa (Certified)
© May 12, 2008
Energy Isolation – Electrical Training Lock Out & Tag Out (Onshore & Offshore) From Petrofac
© May 9, 2008 To May 11, 2008
HSE Mandatory Training From BP Indonesia
Day #1
HSE Induction
Passport Procedure
Personal Protective Equipment (PPE)
Day #2
Golden Rules Of Safety
Day #3
Safety Training Observation Program (STOP) Training
Integrated Safe System Of Work (ISSOW) Awareness
© February 12, 2007 To February 15, 2007 (Certified)
Tyco Safety Product (Singapore)
EAS Technical Training covering as :
1. AMS – 3004 Loop System
2. UltraExit Integrated Traffic Flow Counter Kit with AMC-1060 Remote Alarm
3. Overhead People Counting
4. Smart Device Manager
© October 13,2006
PT. ODG Wormald Indonesia / Tyco Fire & Security
Teleconference Training to learn about the features and benefits of our new American Dynamics Network
Client Intelligent Video Analytics (NCIVA) solution featuring ObjectVideo OnBoard™ (the award-
winning embedded intelligent video analytics technology).
Tyco Fire & Security forms strategic alliance with ObjectVideo® to provide powerful American Dynamics™ video analytics solution.
© September 19,2006
PT. ODG Wormald Indonesia / Tyco Fire & Security & Crockett Internasional (PELCO Representative Office Singapore)
PELCO Seminar & Roadshow 2006
© August 18, 2006
PT. ODG Wormald Indonesia / Tyco Fire & Security
Teleconference Training For American Dynamics New EDVR
© From May 29, 2006 To May 30, 2006
PT. Ericsson Indonesia (Ericsson Knowledge Center) & PT. OCK Telecommunication (Malaysia)
ASP Assistance Center, Training Installation Theory For :
RBS 2206 & RBS 2106
Mini – Link E, Mini – Link High Capacity, Mini – Link Traffic Node
© From September 27, 2005 To September 28,2005
PT. Main First Indonesia (Eaton Powerware)
Local Training for Indosat Rectifier Project Sumatra Area
© From September 13,2005 To September 17, 2005
PT. Mitra Lintas Technology
On Job Training performing RNP Survey
© From September 07, 2005 To September 11, 2005
PT. Mitra Lintas Technology
On Job Training performing LOS/TNP Survey
© From July 15, 2003 To August 15, 2003
PT. PLN (Persero) Wilayah Sulselra Unit SCADA dan Telekomunikasi
On Job Training performing “Operations And Systems Planning”
© From February 01, 2003 To February 28, 2003
PT. PLN (Persero) Wilayah Sulselra Unit Transmisi dan Gardu Induk (Tragi) Panakukkang
On Job Training performing “Protection Systems”