Project Design

Location:
United States
Posted:
October 31, 2011

Contact this candidate

Resume:

Yuhui Hu, P.E.

Address: ***** ****** **, ******, ** 46074

Phone:

Email: qzi7m1@r.postjobfree.com

Overview

Senior engineer with experience of large scale infrastructure projects, Ms. Hu is proficient with civil engineering design and planning, project budgeting and construction monitoring, dealing with customers and problem solving, and report composition. Familiar with design codes, software such as CAD and Microstation, Projects, and MS office.

Project Specific Experience

• 2,500 ft long Retaining walls (between Lehigh Street and Huntington Street) design for I-95 expansion project around Girard Avenue of Philadelphia for PennDOT from January, 2009 through September 2010. The project included rerouting Conrail over Richmond Street and interchange expansion. My role includes soil and rock identification and classification, subsurface profile development, concrete retaining wall design, including loads combination design, wall design and stability analysis (slope, bearing capacity) based on the best design options. Code used: AASHTO design manual, LFD abutment and retaining wall design Version 5.4, etc. ASD design and LRFD design methods were both used due to the request of property owner (Conrail);

• MSEW Retaining wall design and sound wall design for PA Turnpike NE extension expansion project from January, 2009 through September 2010. My role included project planning, soil and rock identification, subsurface profile establishment, MSEW retaining walls design and sound walls design. LRFD was utilized for this design by AASHTO.

• Mill Creek Diversion Tunnel Preliminary Investigation Project for USACE, Philadelphia District, Mar. 2009 to Jun. 2009. Rock classification and geophysical investigation, west of I-76, between Delaware county and Montogomery County.

• Instrumentation Monitoring Delaware River, Wilmington Harbor, Chesapeake & Delaware River Canal facilities for USACE Philadelphia District (Feb., 2009). Ms. Hu performed inclinometer reading and data process to evaluate the settlement and slope stability of landfill.

• UGI-LNG Tank and Facilities Geotechnical Investigation Project (June 10 to September 26, 2008), in limestone sinkhole prone area of Temple Plant of LNG, in Reading, Pennsylvania. Ms. Hu was involved in soil and rock core identification, lab testing, and shallow / mat foundation settlement analysis and micropile option pile analysis. The project included proposed tank of about 160 feet in diameter and 155 feet in height, associated piperacks and equipment pads, the compression load on the tank floor was about 3,700 psf of full height LNG and 4,700 psf due to hydrostatic test.

• Allegheny Ludlum New Rolling Technology geotechnical investigation project, (2008) soil and rock core identification and classification, lab testing, groundwater and river flood level data analysis, spread footing settlement analysis, steel pipe pile and H beams static and dynamic capacity analysis, soil property data analysis, site condition analysis, and report drafting.

• New Orleans East HPO Levee Upgrade Project (2007 to May 2010), lab and geotechnical boring data deduction and analysis, CPT data reduction and analysis, soil profile establishment, soil stress and shear strength estimation for staged construction, settlement analysis, levee design, wick drain design, geosynthetic reinforcement design and slope stability analysis.

• Gloucester County Landfill Cell 11 Lateral Expansion Project, measuring about 52 acres. (Dec 2007-Feb. 2008). My role in this project included lab data analysis, soil profile development, soil strength properties analysis, bearing capacity analysis, liquefaction analysis, settlement estimation, landfill design and stability analysis.

• Series of Projects for PECO Energy Company of Philadelphia, PA from Sep. 2004 through September 2010. Those projects includes Proposed Philadelphia Tunnel substation, Penrose Substation, Bradford Substation Improvements, Elroy Substation Improvements, Upper Merion Substation Improvements, Warrington Substation Improvements, Planebrook Substation Improvement, Chichester Substation Upgrade, Cromby Substation Upgrade, etc. My role in those projects included project planning and proposal preparation, field investigation inspection, soil and rock classification, field and lab tests planning, lab data analysis and subsurface profile development, foundation design recommendation and analysis (bearing capacity, settlement, lateral capacity analysis, compression and shear capacity analysis, and report writing.

• Series of projects for Sunoco Inc. of Philadelphia, PA from Aug. 2004 to September 2010. The projects included Unit 1232 Revamp project, Ultra Low Sulfur Diesel Unit Project, Unit 433 hydro Floride Upgrade Project in Philadelphia Refinery, Low Sulfur Gasoline Unit Investigation and Construction Project, Unit 859 Construction Project, Flare Gasoline Recovery Project, Inter-Refinery Pipeline Project investigation Project, LSG in Markus Hook refinery, etc. I was involved in geotechnical investigation, soil profile development, soil properties analysis, foundation analysis and recommendation, static load (compression and tension) testing and dynamic testing of indicator piles (PDA), field concrete and grout testing, pile installation inspection and construction monitoring, geotechnical investigation report and construction report writing.

• Series of projects for Wyeth Pharmaceuticals, NY. (May, 2007 to May 2008) Those projects included Building 215A subsurface investigation Chiller plant investigation and retention basin studies for Pearl River plant, Utility Upgrade Project in Monmouth Junction plant, etc. My role in those projects included field investigation, lab testing, resistivity study of soil, engineering properties of soil, settlement analysis, and foundation recommendation.

• Iron Removal Project LIWC Plant No. 8 at Lynbrook, NY for Long Island Water Corporation (American Water). (Jan. 2007, and Jun. 2008). My role consisted field investigation inspection and foundation settlement analysis for foundation recommendation.

• Von Thaden Property geotechnical investigation for Liberty Property Trust New Warehouse Project in Florence Township, NJ. Ms. Hu did the preliminary survey, geotechnical investigation inspection, groundwater monitoring, and soil classification.

• Series of Ruby Tuesday Restaurant Project in Hamburg, PA, Mt Laurel, NJ, Willow Grove, PA etc. Ms. Hu was involved in site survey, geotechnical investigation inspection, environmental monitoring, soil identification and classification, and subsurface profile generalization.

• William Transcontinental Gas Pipeline Compressor Station Project in Long Island, NY. Ms. Hu did the safety work plan, site selection-phase survey and geotechnical investigation inspection, final investigation inspection and environmental monitoring and sample collection, soil identification and classification, subsurface profile development, foundation analysis and design, dynamic pile testing, settlement monitoring, pile driving inspection, and construction monitoring and reporting.

Professional Registration

P.E.

Education

Master of Civil .Engineering University of Delaware

Bachelor of Science in Civil Engineering Guilin Institute of Technology

Professional Societies/Affiliates

American Society of Civil Engineers (ASCE)

Languages

Bilingual in English and Chinese

Specialized Training

2004/OSHA HAZWOPER 40-hour Supervisor’s Training

Publications

“Limited reinforced space in segmental retaining walls”, Geotextiles and Geomembranes, Vol. 22, Issue 6, December 2004

Chronology

2004 – Present/URS Corporation, Fort Washington, PA

2000-2002/Ebase Inc. China

1996-2000/the 20th Metallurgical Construction Company



Contact this candidate