Post Job Free
Sign in

Project Manager Technician

Location:
United States
Posted:
October 31, 2011

Contact this candidate

Resume:

Paul Cecil

254-***-****

Cell: 832-***-****

********@*****.***

October 17, 2011

Education and Training after high school

Two years of technical training in

• Small and large engine theory, operation and maintenance

• Gasoline, natural gas and diesel engines

• Naturally aspirated and turbo aspirated engines

• Engine controls and instrumentation

Experience

Seven years of experience with the mechanical design of onshore naturally aspirated and turbocharged aftercooled natural gas, and reciprocating compressors used for gas storage, trim units, and pipeline boosting stations.

Five years experience as ASE automotive technician.

ASE Certifications:

- A1 – Engine Repair

- A4 – Suspension & Steering

- A5 – Brakes

- A6 – Electrical/Electronic Systems

- A7 – Heating & Air Conditioning

- A8 – Engine Performance

Employment

08/06/2007 – 04/01/2011

NGS Energy

Position: Rotating equipment manager/Project Manager

02/16/2004 – 08/05/2007

Atlas Engineering

Position: Rotating Equipment Package Specialist

03/11/2003 – 02/04/2004

McKay’s Automotive

Position: ASE Technician

01/22/2002 – 03/10/2003

Champion Automotive

Position: ASE Technician

07/10/2001 – 01/21/2003

Firestone

Position: ASE Technician

05/25/1999 – 07/11/2001

Techstar Automotive

Position: ASE Technician

Scope of Experience

• Various studies of

o Constructability

o Operability

o Configuration

o Efficiencies

o Exhaust emission

o Noise

o Fuel consumption

• Detailed mechanical design, including materials of construction

• Overall equipment performance

o Torque requirements

o Horsepower demand

o Load analysis

• Equipment specifications, including

o Materials

o Procedures

o Testing

o Inspection

o Documentation

• Bid evaluations, including

o Technical and commercial evaluations of proposed vendor offers

o Vendor recommendation, including

Technical

Commercial

Vendor qualifications

o Equipment inspection, including

Fabrication

Assembly

Conformance with specifications, and drawings

o Commissioning and startup, including shop and field site locations

Numerous projects executed from concept though startup, including compression packages, centrifugal pumps, ultra sonic meters, and generators.

Past Projects

Pine Prairie Energy Center LLC

• Responsibilities

o Compression equipment package performance curve and load step selection

o Prepare and submit compression packager request for quote

o Packager commercial and technical bid evaluation

o Packager drawing review and approvals

o Piping class data sheet calculations

o P&ID review

Tres Palacios Gas Storage LLC

• Responsibilities

o Compression equipment package driver and compressor selection

o Compression equipment package performance and load step selection

o Prepare and submit compression packager request for quote

o Packager commercial and technical bid evaluation

o Packager drawings review and approvals

o SCR vendor selection

o SCR vendor drawing review and approvals

o Close working relationship with vendors to address issues with equipment

o Piping class data sheet calculations

Leaf River Energy Center

• Responsibilities

o Prepare and submit solution mining and disposal pump request for quote

o Technical and commercial review of pump package proposal

o Pump drawing review and approval

o Gas handling major equipment request for quote, review and submit for purchasing

o Compression equipment package driver and compressor selection

o Compression equipment package performance and load step selection

o Prepare and submit compression packager request for quote

o Compression commercial and technical bid evaluation

o Packager drawings review and approvals

o SCR vendor selection

o SCR vendor drawing review and approvals

o Close working relationship with vendors to address issues with equipment

o Project manager of interconnects

Constant communication with tie-in clients, and engineering company for meter site design, controls, resolution of drawings

Engineering company drawing review

Material takeoff list

Material requests for quote, bid review, and procurement

Resolve interconnect agreements conflicts between tie-in company and company

P&ID reviews

Weekly reporting

Scheduling of vendors for commissioning

Approval of Hydro test packages and calculation, as required for elevation changes

Weekly/Bi-weekly site visits for construction support, tie-in client issue satisfaction, P&ID walk though, issued for construction drawing review, and field changes.

Three Future project compression package analysis and selection.

ASE Auto Technician prior to natural gas storage background.

References:

Robert Thornton

832-***-****

Jerald Garcia

713-***-****

Laura Luce

203-***-****



Contact this candidate