Experience Summary

Total of more than 30 years of working experience, including 20 years in supervisory, inspection, and testing including related QA/QC job functions for diversified projects including oil/gas, refinery, chemical/gas plant, heavy engineering fabrication, pressure vessel fabrication, plus 4 years as a Craft Apprentice. Sound knowledge and experience includes shop fabrication on structural steel, piping fabrication and erection, FAT at vendor workshop and pre commissioning of piping and equipment system

Multi discipline experience and capabilities included QA/QC function related works such as welding inspection, piping fabrication and erection, NDE review, pressure vessel fabrication, tank, structural steel fabrication and erection, offshore engineering, jackets and top side, offshore installation and pipeline, mechanical equipment setting and installation including shop and vendor surveillance, witness pump FAT, Crane accumulators, receiver, gantry crane fabrication, and other marine system, blasting/painting, expediting and project progress report. Monitor and witness pressure vessel and heat exchangers fabrication and testing, including installation of internal trays, such as bubble cap trays, valve trays, packing etc. Experience in setting and inspection of Drilling Equipments and sub sea equipments.

Experience also includes the preparation and/review/approval of QA/QC plan and procedure, preparing of hand over documents, preparing piping/system hydrostatic packages including crosscheck P&ID and ISO, checking piping cutting plan and subsequently follow up QA Auditing/surveillance to verify implementations, ensure Flange Management system were in force and details documented.

Overseer, source and planning, scheduling, handling engineering drawing for Project Management in Refinery, Chemical Plants, Power Plants & Shipbuilding and Heavy Engineering Fabrication projects, offshore engineering and installation, guidance to certification, and completion documents inspection preparation

Responsible for ensuring the co-ordination of activities and a fluent flow of documents in relation with the project procedures.

Professional qualification/certification including CSWIP 3.1- Welding Inspector Certification, and training in welding, piping, Industrial Engineering and Power Plant and Project Management.

Educational and Professional Qualification

General Certificate of Education

CSWIP 3.1 – Certified Welding Inspector

Welding Metallurgy Training – Industrial Training Board

Industrial Engineering Training – Singapore Polytechnic

Welding – Industrial Training Board

ASNT II – DPI/MPI – in house

Gas Tester Certificate – Sarawak Shell

Seminar – theory and Practical Training in Laser Alignment – Durco Pump

Certificate of Proficiency – QA/QC Engineer – FWEL

Computer Training – MS Office/Words/Excel

Professional Affiliations

Members of The Welding Institute of Canada

Associate Member of The Welding Institute

Project Management Institute – Member

Employment History

Sept 2010 – Present

Snr Mechanical Fabrication / Inspection Supervisor – SLC Gorgon Project, Saipem Indonesia, Bandar Lampung

Responsible to ensure smooth progress during fabrication of fabricated beams and platform for Gorgon Australia LNG Marine Terminal, in sub contractor yard, PT Hanjung in Bandar Lampung, Indonesia.

Supporting Project Planning Dept,in monitoring fabrication work progress, tonnage of the fabricated beams and other platform components, such as piping and mechanical, etc, including completion target of fabrication and assembly of the platform and piping and tubular works. Provide advises on quality related matters, on fabrication quality, piping fabrication and other related works as to achieve company goal and expectation on safety, quality and schedule.

Ensure contractor updated all documents and checking final mechanical completion dossier prior to load out, and ensure Saipem HSQE were implemented and followed by the contractors.

Feb 2010 – June 2010

Completion Inspector/Supervisor – Mechanical/Tubing/Piping Brunel Energy / Noble Drilling Corporation

Seconded to Noble Drilling Corporation to inspect and supervise completion works on the instruments, tubing and piping. Lead a group of contractor inspector in inspection and monitoring outstanding works data base compilation prior to commissioning. Ensure instruments were tested and calibrated with completed tubing works, recording of valves stroking, and to ensure piping works were completed, tested and documented.

Sept 2009 – Jan 2010 Brunel Energy - SubSea 7 Pte Ltd

Singapore

Vendor Surveillance Inspector/ Coordinator - Seconded to Subsea 7, and fully responsible on the projects taken by Subsea 7, such as Riser Hold Back Anchor for Murphy Oil, and T pipe skid for Santos, Australia, Stage II Development Project. Responsible to vendors quality programmed implemented, structural steel and pipe spools fabrication, welding, Load Testing, painting, verification of materials, shop testing, documentation procedure review, guidance of certification, and vendor quality surveillance.

June 2008 – July 2009 Brunel Energy -Larson Oil Gas / PetroRig I/II/III Project

JSPL Singapore

Snr Mechanical Inspector - Fully responsible for mechanical equipments installation and testing of pumps, exchangers, pressure vessel and components, hydraulic and high pressure air system including drilling equipments, including level and orientation check of steel structural, such as pump and main engine foundation, deck crane column and ensure welding of the crane adapter were done as per approved procedure, witness mechanical testing on pumps, vendor scope hydraulic and piping system testing, receiving inspection, monitoring FAT ( Factory Acceptance Test ) and punch list, also compilation and preparations of MC documents, prior to equipment system commissioning and start up during construction of 6th Generation Semi Sub PetroRig 1, PetroRig II, PetroRig III and Larson Rig 1.

Playing active role on implementations of approved project HSE procedure, and to ensure company target of zero injuries is achieved.

Nov 2007 – April 2008 Third Transmission Pipe line Project – PRP Ofshore Platform System

PTT Thailand / Bechtel International – Offshore Thailand

Mechanical / Piping/ Construction Engineer – Seconded to Bechtel International to provided supervision during completion stage of the PTT PRP Platform, including supervision during gas receiving duration unto the system up to 1100 psi. Primary duties are to supervise and co ordinate completion activities and commissioning of mechanical equipments and piping system, as to received 1st gas transmission. Playing active role with CSR to ensure gas receiving and mechanical commissioning works were done with highest safety standard and ensure contractors followed safety procedure .Documents review and certification for commissioning, testing and preparation of gas receiving system of the platform. Vessels closure audit and re verified internal components to ensure intact and as per specification prior to commissioning and start up, coordinating deck crane testing with classification authority.

May 2007 –Oct 2007 Akpo FPSO Project – Total Upstream Nigeria Limited

Mokpo / Ulsan – S Korea

Construction Supt/ Site Representative - Seconded to Technip France, and stationed in Mokpo, S Korea, to fully supervise fabrication/erection & transportation of HP/LP & KO Drums and Pumps Skid modules at sub contractor site, including its facilities, piping, mechanical, pumps, installation, E&I, painting, testing and HSE, to provide support to engineering group and to ensure skid and facilities were fabricated as per company specification and requirements, tasks were to deliver modules in time, with quality and works done safely. Provide support to planning and scheduler on sub-contractor works progress as well as updating and monitoring updating works measurement with MS Project. Coordinating in between trades supt, and day to day and technical and shop problem solving on engineering fabrication issues.

March 2006 – May 2007 Prosafe Production Pte Ltd – FPSO POLVO

Devon BMC8 BRASIL

Piping Inspector – Seconded to Prosafe to oversee/supervise conversion work of FPSO Polvo. Primary duties are to carry surveillance and inspection during demolition and renewal of marine piping system including all the components, and also new process piping with modular system, system testing, line inspection, materials verification, review and approval of hydratest dossier, and compilation of report and certification, checking dossier prior to final documentation,for commissioning. Monitor construction and Welding related activities, follow up / monitor detailed construction activities including interpretation of engineering & material / construction specifications to ensure alignment of project goals and strategy, attends to and resolves Contractor queries and provides technical guidance and expertise to ensure project requirements are clearly understood and met.

May 2005 –March 2006 Third Transmission Pipeline Project- Offshore Platform System (PTT Thailand/Bechtel)

Piping/Mechanical Inspector – Seconded to PTT/Bechtel International Inc, to supervise, monitor works during fabrication of TTP PRP Platform. Primary responsibilities to ensure works done by the contractors were as per project specification and requirement. Monitor and carry out quality surveillance during fabrication of the platform structural and all the facilities including the LQ, monitor piping fabrication works and erection, equipments receiving inspection and installation, checking on supports and service platform, to ensure they were fabricated and erected as per drawing requirement. Responsible in piping system line inspection and Testing,dossier review and approval, hydro testing,flushing, chemical cleaning and pre commissioning activities function to completion, final documentation and certification.

June 2004 – March 2005 Brunel SEA – BP Exploration – Shah Deniz TG 500 Gas Export Project

Piping/Mechanical Inspector – Seconded to BP Exploration Shah Deniz Ltd, to monitor and witness all aspect of piping/structural works including testing, flushing hydro jetting, tank survey, during construction of Shah Deniz Gas Export Platform for BP Exploration. Primary responsibility is to supervise, surveillance and inspection during fabrication of heavy wall Duplex/Super Duplex, stainless and CuNi piping to ensure works carry out as per specification and requirements. Carry out line inspection and witness testing, mechanical testing on maintenance lifting gears and accessories, keep track on Site Instruction to ensure works completed as required, check/liaise with engineers and contractor and to ensure no SI outstanding for system commissioning, including preparing/reviewing technical documents for project certification and final acceptance.

June 2003 – May 2004 Brunel SEA – Conoco Phillips - BERLANAK FPSO

Piping Engineer / Hydro Test Pack Coordinator – Was seconded to Pt McDermott Indonesia. Primary responsibility is to supervise a team of line checkers including managing of hydro test pack dossier. Review all punch list issued by line checkers, determine and conformed A/B items, cross check test limits and test loop from P&ID and ISO, ensure updated document/drawing and preparing for release notes and NDE clearance prior to testing the pipe line/system, and to ensure Flange Management System were follows and documented in details in terms of flange sizes and ratings, bolts sizes and bolts class, flange/mating flange surface were checked andgasket install as per pipe class and bolts were torque and recorded., Follow up reinstatement works after testing, coordinating with all parties in preparing for final documents prior to final/total Mechanical completion dossier to be submitted to client fore approval. Keep track on all test pack movement and ensures timely tested and completed as planned. Assigned to Task Force team in supporting project management team for timely system hand over to client.

March 2003 – June 2003 Brunel SEA – KBR P43 – BARRACUDA FPSO

Mechanical/Piping Inspector - Primary responsibilities is to ensure piping fabrication/erection on marine and process-piping system is conformed as per design & specification. Carry out line inspection, and witness hydrostatic testing, site inspection and verify &ID, pipe support, and review Hydro test pack and related document prior to final acceptance, during conversion works on the FPSO P43, Barracuda at Jurong Shipyard, Singapore. It is including of coordination works and supervision of a group of line checker/inspector prior to system testing and commissioning and to ensure timely system handover.

November 2002 – March2003 Brunel SEA – Vanguard SPC – Wollybutt Project

Mechanical Piping Inspection Engineer – Primary responsibilities is to ensure piping fabrication/erection on marine and process piping system is conformed as per design. Carry out line inspection, witness hydrostatic on piping, site verification as per P&ID, pipe supports, and reviewing of document for final acceptance, during conversion works on the FPSO Four Vanguard at Keppel Shipyard Benoi, Singapore

April 2002 – October 2002 – Japan Vietnam Petroleum Company – JVPC RANG DONG Full field Development Project

General Inspector/Supervisor – Primary responsibilities is to oversee/supervise fabrication of piping for the N1 2nd phase expansion during onshore/offshore piping/structural fabrication and offshore installation, it does include all the piping facilities, flow lines, gas lift lines, raiser and installation of new separator on the platform, including to supervise fabrication of the E1 Well Head Platform in Vung Tau PTSC yard, and it does include of piping/steel fabrication, blasting/painting, NDE coordination including offshore installation of the N1 deck expansion and upgrading of piping system on the platform

Feb 2001 - March 2001 – Singapore Chemical Complex/ExxonMobil – Poly Olefin Plant

Contract Inspector- Boiler

Seconded to SCC, to carry out joint inspection with Ministry of Manpower – Industrial Division inspector in carrying out physical survey on the boiler B, external and internal condition. Monitor NDE on all the welded components to ensure no indication of visual defect on all welded seams.

May 2000 – November 2000 – JVPC – Japan Vietnam Petroleum Company

Installation Engineer – Primary responsibility is to overseer and supervise sub-assembly/fabrication, welding, NDE, of offshore steel structure and process piping/flow line during fabrication and erection, material verification, line inspection as per P&ID, cross check ISO/P&ID, and installation of the Rang Dong N1 4 Slot Expansion in Vietnam, including of reviewing of the hydro test pack and line inspection of flow line tie-in points, witness hydro testing of the piping line/system, blasting/painting of splash zone and insulation of piping system, material take off, reviewing MDR and to overseer day to day installation activities during offshore installation.

Feb 99 – May 2000 - Bechtel International

Construction Engineer/ Mechanical – Be responsible on all aspect of piping and welding works during construction of Exxon’s Singapore Chemical Complex in Singapore. Duties including of piping fabrication and erection, welding inspection and NDE review, welder qualification, fabrication of stainless steel silos, reviewing of ISO and P&ID, mechanical installation, underground piping including all aspects of project quality function including overseer construction of 2 unit of spherical tank and 1 unit of cylindrical tank as per ASME DIV 1 & 2 requirement. Preparing of hydro test pack and plan and preparing of work release note to painting and insulation on pipe line and vessel.

Dec 98 – Feb 99 – Technic Offshore Engineering Pte Ltd

QA/Qc Inspector – Responsible on Quality works function during fabrication of pressure vessels, Air Receiver and piping fabrication, duties including of documenting and monitor all QA/QC work on project assigned as per quality system requirements, perform project drawing review for the improvement possibilities in design or welding parameter, selecting of appropriate WPS for projects, receiving and inspection of incoming materials as per quality system requirements, in process inspection and verification of all assigned work as per quality system requirements, co-ordinate with NDE contractors, coordinate with fabricator and approval authority, witness and records PQR, WPS, WPQ as per project requirements.

Aug 98 – Dec 98 - Free Lance Inspector

Doing inspection and cost estimation for maintenance works for engineering firm, and doing cost estimation for the company to do bidding on maintenance works for the chemical plant in Bontang Indonesia. Preparing MTO, materials and labor cost including technical data for bidding.

July 98 – Aug 98 – Cost Engineers SEA

Piping/Mechanical Coordinator -To provides cost estimation for piping works on SUT 11 plant, which is still under planning. Responsibilities are to do estimation on materials and labor cost, and preparing MTO and data sheet for material pricing.

Jan 98 – May 98 – Brunel Energy International

Mech. Inspector – Responsible to ensure fabrication/erection quality works of jackets and N1 Wellhead Platform for Japan Vietnam Petroleum Company, Duties include piping / structural inspection and supervision, line inspection, review hydrostatic test packages, review NDE result, mechanical installation, vessel closure audit, witness mechanical testing and hydrostasting, painting, insulation and system flushing and precommissioning and review documents prior to approval.

Oct 97 – Dec 97 – PetroBras SA

Piping/Mechanical Inspector – Typical responsibilities including pipe spool fabrication and erection, review system hydrostastic documents and line inspection and witness testing, NDE coordination, system flushing, review inspection documents prior to system acceptance during major conversion job of PetroBras P27, from semi sub drilling rig to storage floating unit.

Jan 97 – July 97 – Scheering Plought Pham. Plant

QA/QC Engineer – Responsible to ensure proper and smooth system hand over and to ensure that all relevant technical documents were provided in the test packages, before approval of system testing, and to ensure P&ID and ISO were updated as per as built including piping modification design and approval. May

95 – Dec 96 – Manessmann Demag JV / Singapore Aromatic Plant

QA/QC Coordinator – Typical responsibilities including pipe spool fabrication and erection, preparing MTO, mechanical equipment installation, NDE coordination and responsible for preparing piping hydro-static test packages for system testing and commissioning, design additional piping works, update P&ID and ISO, and taking up as an Asst. QA Manager and responsible in coordinating with client and day to day quality problem including supervision a group of site inspector during plant construction.

Mar 95 – Apr 96 – TEK Singapore Pte Ltd / Du Pont Delrin Upgrading/Expansion

Construction Supervisor – Typical responsibilities including plant services and maintenance, during plant expansion and modification works, site office maintenance, engineering services, site safety, preparing documents for bidding and quotation, vendor audit and evaluation, quotation review, setting up filing system and computerize technical data records, also doing multi discipline site QA/QC activities related to works requirements.

May 89 – Mar 95 – Ebasco Quality Services

Snr Quality Rep – Typical assignment including vendor surveillance and inspection of various fabricated equipment such as pressure vessel, steel structure, piping, welding inspection, painting, insulation, mechanical installation and testing. Doing multi discipline site QA/QC activities related to construction projects including welding, mechanical, piping, mechanical testing and documentation.

Typical Major Assignment includes: -

Badger Engineer Incorporate – US

Representing BEI, during fabrication of pressure vessels, columns, during construction of Mobil’s Aromatic Plant in Jurong, Singapore, and also responsible for fabrication of vessels and columns for Thai Refinery constructor during construction of their plant in Rayong, Thailand.

Primary responsibilities are to liaise with contractor on quality assurances function, schedule, fabrication, NDE coordination, painting, shipping including of final documentation reviews and preparation of MDR. These include carrying out vendor surveillance on company purchase items such as pipes, valves, plated, bolts/nut, etc, and to ensure commodities conformed to company requirements and certification.

Mitsubishi Corporation /Ministry of Environment – Singapore

Seconded to MOE as site QA and responsible for auditing QA/ QC function for Mitsubishi Corporation during vendor procurement and site construction at Senoko Refusal Incinerator Plant, Singapore. Multi discipline responsibilities including reviewing of NDE result, welding inspection on boiler tubes, fabrication and repair procedure, vendor surveillance, product audit and inspection during erection of 6 units of Water Wall Boiler, including mechanical equipment installation and inspection on various system to ensure compliance to fabrication specification. Witness functioning test of major equipment and record data review before submission/approval.

Offshore Pipeline/OPI – Singapore

General Inspector – Seconded to OPI to conduct WQT and PQT for Sarawak Shell BHD, MLNG II pipeline installation project. Utilizing the SMAW and CRC automatic welding technique. Piping and welding inspection and NDE review including fabrication of riser pipe and clamps during fabrication of the expansion of the loop lines.

Du Pont Adi Pure Project

Lead Mechanical QA/QC – Representing the end user during construction and installation of mechanical equipment and pressure vessels associate with construction of this 500 millionth dollars plus project. Responsibilities including but no t limited to receiving inspection on equipment, check/review heavy equipment rigging plan and procedures, monitor equipment storage and organize Preventive Maintenance Team, check equipment location, foundation, establish orientation and elevation, monitor equipment installation works, check equipment levelness, plumpness, orientation and elevation after installation, check grouting preparation of equipment base, check equipment internal components and monitor installation of trays, demister, packing etc insulation and painting works organize vessel closure audit for equipment acceptance and pre commissioning, compilation/review of all installation/equipment records for submission and dimensionally check, torque and bolts inspection on structural steel.

June 88 – Dec 88 – Vietco Services

Offshore Inspector – Seconded to Sarawak Shell to carry out general inspection during installation of Bokor and Temana jackets and platform facilities, including laying of 4”and 6” dia. inch of pipeline offshore Miri and Bintulu Sarawak. Duties include material verification, piping and structural inspection, welding inspection, NDE, check/witness jacket leveling before piling, distortion check, monitor [piling and progress during offshore installation works. Witness NDE inspection, result review/filing, monitor piping piging and flushing and line hydrostatic testing.

Jan 87 – Feb 88 – Kejuturaan Kota Aman

QC Inspector – Welding inspection function during fabrication and construction of Bokor C jacket and facilities as well as piping fabrication at Pasir Gudang yard, Malaysia.

1985-1987 – MSE

Welding Supervisor – Welding inspection/QC function during fabrication and construction of coastal tankers/vessels for Petronas, Malaysia. Responsibilities are including supervision a group of skill welder/fitter, production organization and daily activities of subordinates including welder training.

1981-1983 Dillinger Stahbalau -Gmbh

Qc Inspector – Carry out welding inspection function during construction of Sabah Gas and Methanol Plant. Duties include all aspect of welding inspection function, NDE coordination and compilation of all test, and preparing report for client submission.

1977 – 1979 – Hitachi Engineering

QC Inspector – Carry out welding works on boiler tubes and piping, and taking up QC works function during plant shut down.

1973 – 1977 – JSL

Apprenticeship – Craft Apprenticeship in Marine Engineering and was trained by IHI Japan, in all aspect of offshore/marine Engineering works including fabrication, welding, NDE, mechanical installation, testing and commissioning and Quality control.