THINH TIMMY LAM
HOUSTON TX *7084
pibzl4@r.postjobfree.com
OBJECTIVE : Electrical Mechanical technician Looking for a challenging position in electrical firm ,with my demonstrated
Track profile in oil field marine industry with an experience .willing provide
The best of my experience in the oil field of electricity,,
EXPERIENCE
STEWARDS STEVENSON 1-2011
Suige system Dc-2000 Data van control system ,digital controller process display.control center on truck trailer or skid.medium voltage switchgear.generator control ,Intelligent pump control system.
EAGLE OIL TOOL 2-201*-**-****
Off shore services switch gear ,over hauling top drive ,drawwork ,pipe rack system ,lay pipe system
Conveyer ,install service loop for topdrive ,replace all jbox on 144level derrick. replace all new power cable ,wire ,proximity sensor block dolly ,install top drive head .install travel roller
Pipe rack system .replace all junction box.for upper arm ,lower arm ,and lower drive and slew
Reassembly all motor ,actuator .hydraulic manifold solenoid ,replace all hydraulic hole.
Assembly all electrical .and termination ,install all service loop cable, drag chain ,check all proximity
Sensors ,replace all cable for brake power ,heater ,overload temp ,overload brake ,all new 1200a breaker for switch gear system,replace all dc power .generator power cable Conveyer ,install new drum ,and belt all hydraulic cylinder ,all sensor .Test all function on pipe rack system top drive switch gear ,trouble shooting electrical plc ,trouble shooting hydraulic
Hp power LLC 10-200*-*-****
Ips system Vfd system ,install ac dive, and dc dive ,generator engine install .scr house
Driller house assembly and wired ,install and termination 777mcm cable
For 750 kva transformer ,install all mcc unit with 480 v main bus ,routing all 120v
And 220v to mcc breakers ,install main tie main bus ,termination for dc plug panel
For top drive ,draw work , mud pump, all interconnect wire ,point to point
Check all termination,wire tag check list ,testing all dc drive power
National oilwel varco 2-200*-*-****
Switch gear system install ,scr ,generator ,install 750 kva transformer
Install plug panels , install switch gear dc main bus ,install dc power contactor
Wire all plc panels and install, wire all scr ,gen interconnect .assembly dc bridge
All dc connector ,install motor control center ,assembly mcc bucket .prewire all cable For profibus module,routing all dc power for top dive draw work .rotary table
Assembly and wire for driller console . check all the wire ,and dc power cable
Point to point ,final check before testing all equipment
Omron oilfield marine 3-200*-*-****
Driller chair .driller house Plc control room ,scr drive ,vfd drive ,ac drive, install
Install relay panel ,dcs building,switch gear system .install motor control center
Compelte test for plc ,mcc ,all testing equipment
EDUCATION
Highschool Diploma
Electrician Diploma
Electrical engineering technology in progress