Post Job Free

Resume

Sign in

Instrument Engineer/Instrument Supervisor(Construction)

Location:
Cochin, KL, 686027, India
Salary:
60000/-Doller
Posted:
August 11, 2011

Contact this candidate

Resume:

CURRICULUM VITAE

PrecentAddress ozy3at@r.postjobfree.com BijuRajendran 009***********

Vigneswar 009*********** Mariyathuruthu PO

Kottayam-686027

Kerala-India.

TECHNICAL QUALIFICATION

Diploma In Instrument Technology (three year course - completed in 1990, from Govt. Polytechnic, Kerala, India). AutoCad (Release 14).

PERSONAL DETAILS

Nationality : Indian

Born : 10-05-1967

Marital Status : Married

Passport Details : Passport No. E 3580344

Place of Issue : Cochin

Date of Issue : 23-10-2002

Date of Expiry : 2-10-2012

Permanent address : Vigneswar

Mariyathuruthu P.O.

Kottayam - 686 027.

Kerala - (India)

Tel. : 0091- 481- 2391230

CAREER OBJECTIVE

To make the best of my knowledge and experience thereby contribute to the growth of the organization and myself.

CV OVERVIEW

I am working in the field of instrumentation with 20 years experience in process control instrumentation field. I have principally been involved in Instrumentation construction projects and maintenance fields of continuous process plants in offshore & onshore. I have actively participated as key member in various projects and I am well conversant with project life cycle from concept to commissioning.

EXPERIENCE SUMMARY

FOUR MAJOR GAS PROJECTS

1. Yeman liquefied natural gas project(YNLNG) with technip-

France

2. Nigeria liquefied natural gas project (NLNG) with TSKJ NIGERIA LTD, this is a joint venture of Technip of France, Snamprogetti, Kellogg Brown & Root and Japan Gasoline Corp. (COMMISSIONING)

3. On going Gas development projects III (OGD III) for GASCO, Abudhabi, UAE with BECHTEL.(through Kent)

4. Oman Liquefied Natural Gas Project with Chiyoda Foster Wheeler & Co.LLC.

5. Bonkot Field Development Project Indonesia .

Three major Power Plants with Gas turbine and Steam turbines including super heated boilers and desalination plant.

1. Al-Aweer Gas Power Project, Dubai (DEWA) with Mitsubishi Consortium-Japan

2. Hitachi Zosen, Muscat (Muscat Electricity &Water)

3. John Brown Engg. Ltd, UK (Oman Branch) for Muscat Electricity & Water)

1. PETROLEUM DEVELOPMENT OF OMAN, EPC–NIMMER SWD DE BOTTLING & DWD HOOK UP (COMMISSIONING)

EMPLOYMENT HISTORY

Aged 42 with 21 Years of experience in Instrumentation with various multinational Organizations.

1 April 2011 to June 2011 : Bonkot Field Development Project

Indonesia.

Position : Instrument Supervisor

Nature of Job : Pre Commissioning and Commissioning

2 May 2008 to Sept. 2009 : Yemen Natural Gas Project Yemen

Position : Instrument Supervisor

Nature of Job : 1. All underground cabling ad Above

Ground cabling

2. Control room panel instillation and

cable termination

3. Analyzer installation , cabling

termination and Sample / Test gas

Connections

4. Transmitters installations ,impulse

Tubing and field cable laying

5. Loop checking -

Pre commission and trouble shooting

3 October 29th 2007 to January 2008. : TSKJ Nigeria Ltd. Bonny Island, Nigeria

Position : Instrument Supervisor

Nature of Job : Duties involving in Loop-checking, Trouble shooting & Commissioning of process control instruments in NLNG Train-6 project and related two compressors Named MR & PR. (Mixed-refrigerant & Propane-refrigerant). Support the anti surge controls specialist vendor for commissioning the anti surge control panel and related field instruments like anti surge control valves, transmitters, etc…Support the flow serve control valve specialist vender for trouble shooting & commissioning of the control valves.

4 July 2006 to October 15th 2007 : GASCO (Hubshan), UAE

Position : Instrument Supervisor.

Employer : BECHTEL (Eastern)

Location : Hubshan, Abudabi, UAE

Client : GASCO (Hubshan), UAE

Project : Onshore gas Development Phase-III

Nature of job

Panel base frame Installation, control panel Installation, MCT, Cabling and termination of Control room and Loop checking.

5 March 99 to July, 2002 : Saipem U.K. Ltd. FOR JAMNAGAR Proj (MTF area) (OFFSHORE)

Position : Instrumentation Engineer

Nature of job : Loop checking and process control system-Functional checking

Testing, Pre commissioning and commissioning of process control system

1. Gas firing control system and Oil firing control system.

2. Trip system for Gas Turbine.

3. Feed water and steam temperature control loop.

4. Boiler interlock circuit (Boiler trip relay circuit)

5. Drum level control loop (Four element control system)

6. Main stem temperature control (Cascade control) system.

6 January 2003 to 2006 : Southern Refineries

Position : Plant Engineer

Nature of job : Preventive maintenance and Troubleshooting of field instruments, FIRE & Gas Instruments like open-path detector, sonic leak detector, IR point detector, UV/IR detector, Smoke detector and Break glass unit.

Maintenance, Servicing, Trouble shooting and Calibration of the following Process Control instruments

Control valves, Level, Flow, Pressure, Temperatures switches, I/Ps and all type of positioners.

Pressure Trasmitters, Differential Pressure Transmitters, and Sealed diaphragm type transmitters. Level troll transmitters, etc…

Temperature measuring instruments, local indicators.

All types of switches (Flow, Press, Temp, Level).

7 September, 1998 to February, 1999 : Oman Liquefied Natural Gas Project.

Contractor : Chiyoda Foster Wheeler & Co. LLC.

Client : Oman LNG LLC.

Position : Instrumentation Engineer

8 January ’97 to August, 1998 : Al-Aweer Gas Power Project, Dubai.

Contractor : Mitsubishi Consortium – Japan

Client : Dubai Electricity & Water Authority (DEWA)

Consultant : Kennedy & Donkin Middle East Ltd.

Project : 6 x 100 MW 701D Gas Turbine Power Station ‘H’ at Al- Aweer, Dubai

Position : Instrumentation Engineer

Nature of job : Loop Checking and Process Control System – Functional Checking.

1. Gas firing control system and Oil firing control system.

2. Trip system for Gas Turbine.

3. Gas treatment control system.

4. Fuel Oil control system.

5. Instrument air control system.

6. Service air control system.

II Pre Commissioning and Commissioning of Process system

1. Generator cooling system, Turbine cooling air system, Lube oil cooling system, Control Oil cooling system.

2. Final gas separator system and Gas firing system.

III Analyzers

1. Calibration and maintenance of analyzers such as SO2 Analyzer ( Non Dispersive infra red Analyzer)

2. Stack gas analyzer (Thermal conductivity analyzer).

3. Oxygen Analyzer.

9 1st January 1996 to 1997 : Hitachi Zosen, Muscat

Client : Muscat Electricity and Water (MEW), Sultanate of Oman.

Consultant : Dr. Ali Al-Sai – Cairo

Project : Power and Desalination Plant Capacity 35 MW and Boiler Capacity 230T/hour with Desalination Plant.

Position : Instrumentation Foreman

Nature of job : I. Loop Checking and Process Control System – Functional Checking

1. Boiler Drum level Calibration.

( Leveltrol (Boincy Principle)

(Flow meter - with square root extractor)

2. Split range control system in Desalination plant.

3. PLC installation and functional checking.

4. Burner Interlock system, igniter control system.

5. Deartor Pressure and level control system.

II. Testing Calibration of various type of Instruments.

1. Temperature and Pressure transmitter calibration (Roesemount, Yokogawa Bells & Taylor ).

2. Maintenance and trouble shooting of conductivity and PH meter.

3. Testing and Commissioning of Damper control valves ( Hydraulic)

Pneumatic control valves, shut down

valves.

10 24th Sept. 1995 to Dec. 1995 : Petroleum Development Of Oman

Project : EPC-Nimmr SWD debottllenecking & DWD Hookup

Position : Instrumentation Supervisor

Nature of job : 1. Erection and Commissioning of three Separators.

2. Split Range control system for DWD hookup.

3. Loop checking and controller tuning in central control systems (Yokogawa).

4. Testing and Calibration of system signal isolation cards, input output cards, Alarm cards, Split range Control cards, PI and PID Control Cards.

11 15th Mar.’1995 To 14th Sept. 1995. : John Brown Engg. Ltd., U.K. (Oman Branch )

Client : Muscat Electricity and Water (MEW),

Consultant : Kuljian Corporation - Philadelphia

Project : Combined Heat and Power Project, capacity of 220 MW and Boiler capacity 210 tones / hours.

Position : Instrumentation Supervisor.

Nature of job : Loop Checking and Process Control System – Functional Checking.

1. Gas firing control system and Oil firing control system.

2. Trip system for Gas Turbine.

3. Feed water and steam temperature control loop.

4. Boiler interlock circuit ( Boiler trip relay circuit)

5. Drum level control loop ( Four element control system )

6. Main stem temperature control ( Cascade control) system

II Pre Commissioning and Commissioning

of Process system

1. Generator cooling system, Turbine cooling air system, Lube oil cooling system, Control Oil cooling system.

2. Final gas separator system and Gas firing system.

III Analyzers

1. Calibration and maintenance of Analyzers such as SO2 Analyzer ( Non Dispersive infra red Analyzer)

2. Stack gas analyzer (Thermal conductivity analyzer).

3. Oxygen Analyzer.

12 4th July 1990 to 25th Feb. 1995. : Gas Authority Of India Ltd. (GAIL), India. (Contract)

Position : Instrumentation Engineer

Nature of job 1. Calibration and Maintenance of Pressure, Temperature level and flow ( Differential Pressure Transmitter, Turbine Flow meter and Magnetic Flow meter) Transmitters and Guages.

2. Control valves repairing, gland pack changing and Calibration of Positioners ( Linear, Square root and quick off)

3. Final alignment of instrument loops and controller tuning in DCS systems.

13 10th May’1988 To 18th Jan’1990 : Cochin Refineries Ltd., India. (On Contract basis)

Position : Instrumentation supervisor

Nature of Job : 1. Process instrumentation in the plant.

2. Maintenance and calibration of electronic, pneumatic instruments.

Nature of Job : 1. Calibration, installation and maintenance of Pressure transmitter, Temperature transmitter and Flow transmitter ( Turbine Flow meter, Magnetic Flow meter and D/P Transmitters )

I. Loop Checking and Functional Checking

1. Anti surge Control system.

2. Burner interlock system.

3. Igniter control system.

4. Deartor pressure and level control system.

5. UV (Photo cell) control system.

II. Control Valves

1. Servicing, Assembling and rooting test.

2. Linearity, sensitivity and performance testing for 2 way double ported valve, cage guided valves, angle valves, 3 way valves and 2 way double ported valve with cage guided trim.

III. Analyzers

1. Calibration and maintenance of Analyzers such as SO2 Analyzer ( Non Dispersive infra red Analyzer)

2. Stack Gas& oxygen analyser



Contact this candidate