Career Summary During my 16 year career in heavy highway / civil construction I have successfully managed the following types of projects:

• Design Build Interstate Construction / Extensive Interstate and Highway Resurfacing

• Widening, Utility Relocation and Extensive Storm Drain Installation

• Concrete Paving, Bridge Approach Fills

• Commercial and Residential Site Development

Specialty projects also successfully managed:

• Pedestrian Bridge (inc. MSE Walls)

• Bridge replaced by precast three sided culvert,

• Walking Path with Retaining Walls and Boardwalks

• Specialty Thermoplastic Pavement Markings, and Traffic Signals

Experience

2010-2011 Calumet Civil Contractors Indianapolis In.

Project Manager (MLK Reconstruction DPW Project Indianapolis)

• Developed CPM Schedule, issued subcontracts, issued material PO’s and negotiated change orders. Ensured EEO compliance and Minority goals were met.

• Milling and Resurfacing from Fall Creek to 30th Street.

• Curb, Sidewalk, and Driveway remove and replace.

• Storm Structure and pipe replacement, install new rain gardens.

• Coordinated all subcontractors including specialty thermoplastic cross-walks, bus shelters, street signage, and gateway towers.

• Negotiated additional contract time to reflect additional work order.

Contract Value $2,000,000

2010-2011 Calumet Civil Contractors Indianapolis In.

Project Manager (State Road 38 Dayton INDOT Project Dayton In.)

• Developed CPM Schedule for 3 phases of construction, issued subcontracts, issued material PO’s and negotiated change orders. Changed schedule to double shifts of pipe and concrete crews to accelerate project.

• Installed new storm trunk line and associated laterals.

• Remove approx. 1 mile of existing asphalt roadway, cement stabilization, pour new curb, PCCP pavement and sidewalks.

• Identified design flaw in plans to secure change order and additional contract time.

• Filed 5 claims with INDOT to reflect additional construction cost due to change of condition.

Contract Value $2,500,000

2010-2011 Calumet Civil Contractors Indianapolis In.

Project Manager (Fry Road, Greenwood INDOT Project Greenwood In.)

• Developed CPM Schedule, issued subcontracts, issued material PO’s and negotiated change orders. Ensured EEO compliance and Minority goals were met.

• Widening of east and west side of Fry Rd. including new storm trunk line system, and final resurfacing of entire roadway

• Demo and replace existing bridge

• Faced with extreme utility conflicts I filed 9 claims for loss of production, idle equipment and change of condition. All claims successfully paid by INDOT.

• Project successfully delivered before completion date.

Contract Value $2,500,000

2010-2011 Calumet Civil Contractors Indianapolis In.

Project Manager (Tracy Trail, Greenwood INDOT Project Greenwood In.)

• Developed CPM Schedule, issued subcontracts, issued material PO’s and scheduled manufacturing and delivery of MSE wall panels, panel straps and pedestrian bridge.

• Excavate for leveling pad, place B Borrow, Stone Base, Asphalt Paving new path tie-in, form and pour end bents, set prefabricated pedestrian bridge.

• Negotiated frequency of B Borrow testing be reduced to increase production of bridge approach fills.

• Delivered project before contract completion with minimal punch list.

Contract Value $800,000

2010-2011 Calumet Civil Contractors Indianapolis In.

Project Manager (156th Street Bridge Replacement, Westfield In.)

• Developed CPM Schedule, issued subcontracts, issued material PO’s, delivery of three sided precast culvert, negotiated change orders.

• Demo of 600’ of roadway and existing structure, installed extensive erosion control, bank poured footers, installed new bridge / culvert.

• Identified opportunity to use smaller experienced crew to increase profit without changing production. Self performed asphalt removal to save sub milling cost, all increasing profit by 50%.

Contract Value $400,000

2010-2011 Calumet Civil Contractors Indianapolis In.

Project Manager (Misc. Other Projects Completed in 2010)

• Turkey Foot Walking Path, Zionzville In. - Contract Value $450,000

• Allisonville Road, Indianapolis In. – Contract Value $400,000

• Community South Hospital, Greenwood – Contract Value $300,000

2007-2009 Performance Managed Construction Concord NC

Project Manager / Estimator (Highway and Commercial Site Development)

• Created new commercial site grading department and expanded highway construction department.

• Budgeted and secured contracts for new commercial site development work and highway projects.

• Managed construction activities, subcontractors, material procurement, and developed relationships with existing clients leading to future projects.

• Projects included: Grading for multiple new bridge approach-fills, new roadway alignments, storm drainage, asphalt paving, and pavement markings. Commercial work included grading, storm drain and utilities for commercial buildings, school renovations, apartment buildings.

• Acted as field superintendent / equipment operator / laborer when needed.

• Budgets Between $100,000 to $2,000,000

2002-2007 APAC Charlotte Division Charlotte, NC

Design Build Project Manager / Estimator (Highway Construction)

• Accepted the lead position to develop a new design build department for the APAC Charlotte Division.

• Assembled and managed a design build team of industry professionals to secure the Divisions first and second design build highway projects (Interstate 485 and Interstate 77 in Charlotte NC).

• Estimated all quantities and compiled budget for the project using HCSS / Heavy Bid software.

• Developed a written proposal to the NCDOT including our design criteria, budget, Primavera schedule, and quality control proposal.

• Gave verbal presentations to senior NCDOT officials outlining the proposal details, schedule, and project design.

• Managed all construction activities, budget, subcontractors, and the design build team to bring both project in on schedule and under budget.

• Design Build Project Contract Values $15,000,000 and $5,000,000 respectively

• Developed estimates (using HCSS / Heavy Bid) for, and successfully secured multiple interstate and major highway projects in and around the Charlotte metro area.

• Managed and directed each project, subcontractors, negotiated change orders with owners, scheduled material delivery, and ensured project were completed on time without penalty, and within budget.

• Projects included: Interstate I-77, I- 85, SC 521, SC 161, John Belk Freeway – traffic control, milling, widening, asphalt resurfacing (inc. nova chip), pavement markings, stop light installation, utility relocation, and storm drainage.

• Budgets Between $1,000,000 to 6,500,000

2001-2002 Roche Constructors Denver, CO

Assistant Project Manager (Commercial Building)

• Responsible for development of the project Submittal Log, RFI Log, and all Material Delivery to the project in coordination with the CPM schedule.

• Provided weekly schedule updates to subcontractors and project developer using Microsoft Project.

• Conducted daily erosion control and safety inspections for the entire project and compile weekly report to the safety director.

• Managed and assisted in all aspects of site construction including site grading, storm drainage, utilities, foundation, steel erection and interior finishes for a new Safeway Superstore, associated retail units, and large parking areas.

Contract Value $11,000,000

1997–1999 Mulkey Highway Engineering US 17 Widening Edenton, NC

Owners Field Engineer III (Highway Construction)

• Responsible for soil compaction testing, concrete testing and material quality control.

• Monitored all storm drain construction and prepared as built plans.

• Monitored grading, asphalt pavement placement, pavement markings, and guardrail installation.

• Recorded bridge pile installation, tested concrete, slump, and air. Checked foundation, end bent, and cap grades.

• Compiled monthly estimate and change order quantities for payment to contractor

• Project Budget $24,000,000

1995-1997 Mulkey Highway Engineering US 74 Widening Lumberton, NC

Owners Field Engineer II (Highway Construction)

• Document all daily construction activities and production quantities.

• Test compaction of soils and ensure all materials used are approved for the project.

• Recorded bridge pile installation, tested concrete, slump, and air. Checked foundation, end bent, and cap grades.

• Compile monthly estimate of quantities for payment to contractor.

• Negotiated change order quantities and unit prices with contractor.

• Monitor all grading, erosion and environmental Best Management Practices installed on project.

Project Budget $12,000,000

Education 1999-2001 East Carolina University Greenville, NC

• BSc, Construction Management.

Computer Skills Microsoft Project, Excel, Power Point, Access, Word, Primavera, Heavy Bid (HCSS), Quest Take-Off Software.

References • Mr. Kevin Green, President, Calumet Civil Contractors Tel 317-***-****

• Mr. Kenny Blackwelder, Owner, Performance Managed Construction and former Division Manager APAC Charlotte Division.Tel. 980-***-****

• Mr. Brandon Hill, Propst Construction Co., Concord NC Tel 704-***-****