OWOLOYE OLATUNDE. O
***, ****** ******, *** **, Brooklyn, NY 11212
Project Planner / Scheduler
ovy0pt@r.postjobfree.com.
EXECUTIVE SUMMARY:
Experienced project planner/scheduler with for over 7 years on commercial, institutional and
industrial projects. Planned many IT and construction projects bringing them on time and on
budget.
• Expert in CPM scheduling with a great deal of experience preparing schedule, work breakdown structure (WBS), Project Breakdown Structure (PBS),
• Planning and evaluation of schedule, activity float and utilization of critical path method and
understand budgets, Cost, activity coding, man-hour performance systems,
• Earned Value reports and other elements of overall project monitoring for -contractors and reviewing schedule for owners,
• Planned from FEED stage to EPC the finish date with skills at integrating the schedule
through project control software such as Primavera P6, P3, MS Project, SharePoint,
Project Server, Access, and Visio
EXPERIENCES:
2011-2012
Position: Scheduler and planner
Company: (Gulf Copper Marine. Galveston Texas)
Description: Management consulting
• Uses planning skills to refine the project strategy into a project plan consisting of key events, major milestones, and durations of top level activities necessary to execution
• Work with engineering and contracting teams to ensure the project is on schedule,on budget and to minimize the associated risk
• Have the ability to do cost and resource loaded schedules
• Strong background in budget management and development
• Have change management skillset
• Implementation experience with Oracle Primavera P6
• Practical experience with Primavera P6 Identify and analyze schedule variances, as well as recommend associated corrective action.
• Update and produce scheduling management reports.
• Measure progress and review invoices of contractors.
• Review purchase orders and subcontract schedule status.
• Provide management with input on subcontract performance.
• Assume responsibility for some elements of baseline schedule and associated maintenance.
• Conduct or assist in performance measurement and associated schedule trends.
• Support various levels of project reporting.
• Support the development of plans and schedules for proposals.
• Assist in coordination of schedule input from all parts of the organization.
• Resource loads schedule and performs remedial schedule risk analysis.
• Assemble data for schedule updating.
• SAP Portal Project (Application) IPC Portal Project,
• SWIFT upgrade
• Portal Project (Application)
2008-2010 (CB&I HOUSTON TEXAS)
Scheduler and planner
Company: CB&I, Houston, Texas.
Position: Planning/Scheduling
• Reporting to the Planning/Scheduling Manager, responsibility includes prepare and
update the project EPC Schedule on a regular basis.
• Consolidated and analyzed information from Project Discipline Engineers, Sourcing and
the Participants Project Planners to develop the overall project Schedule (baseline time-
• phased schedule with proper constraints) and Work Breakdown Structure (WBS) for
assigned project.
• Developed, manage, update, and monitor individual project schedules and integrated
overall master program schedule
• Planning, scheduling and estimating project activity times, sequencing those activities
from concept to completion
• Alert management and prepare recovery schedule if variances occurs.
• Prepare and update progress S-curves, commodity curves.
• Assist preparation of weekly and monthly report
• Attend management and subcontractors meetings
• Coordinates schedule from multiple contractors and incorporate the information gathered
into the overall project master schedule.
• Close out the EPC Schedule at completion of the project to reflect the final actual start
and completion dates of all construction activities.
2007-2008
Company: Costain West Africa PLC
Position: scheduler/planner
Project: Nigeria branch expansion of watch tower bible and tract society, Igieduma, Edo-State.4nos of 3storey building, 3services buildings, boiler building, road and external works
Description: Construction
• Travel to clients site twice per month.
• Support the project management team on schedule related matters.
• Develop detailed CPM schedules based on data assembled from a variety of sources (i.e., A/Es, clients, and contractors) using Primavera P6 software
• Schedule updating and production of short-and medium range work plans.
• Develop pre-construction proposal/bid schedules
• Assist Project Manager and Superintendent in development of master project schedules
• Assist Project Manager and Superintendent in development of subcontractor schedules
• Assist Project Manager and Superintendent in updating schedules
• Perform schedule analysis for change orders and claims
• Assist in claims preparation and analysis
• Develop scheduling department procedures
• Work at the direction of the consultant and other supervisors.
• Assist in preparation weekly and monthly progress report, project coordination with
• Subcontractor
• Ensure target is meet according to plan, attend weekly construction meeting, assist in preparation of monthly progress claim, site progress checking
•
Certification:
• Primavera Project Management P6. CPSI . 2008