Brijesh Kumar
E-mail: ohg0hn@r.postjobfree.com +91-930*******
Site engineering implementation, coordinating and supervision of site installations schedule. Coordinating the RF/LOS survey engineers and BTS/MICROWAVE I&C teams. Doing transmission planning. .Seeking assignments in Telecommunication Transmission network Planning, Microwave I&C for all major vendor companies.
SYNOPSIS
A keen learner with a degree in B.E (Electronics & Communication) and more than 2.8 yr experience in telecom sector. Presently associated with SRI RAM GROUP as Project Coordinator. Exposure in handling telecom project of RF/LOS SURVEY, BTS/MICROWAVE INSTALLATION &COMMISSIONING. Excellent communication & organisation building capability with proven ability in planning optimal utilisation of the resources.
CAREER CONTOUR
SRI RAM GROUP (Patna).
Since Aug’09 I am associated with SRI RAM GROUP. Currently working as PROJECT COORDINATOR and handling the entire network project under taken by SRI RAM GROUPS in PAN INDIA of all the major companies.
KEY RESULT AREAS
Handling all the survey engineers and BTS/Microwave I&C team of Sri Ram Group.
Site engineering implementation, mainly including hardware installation, software debugging, system joint commissioning and primary acceptance test (PAT).
Coordinate and supervise site installation schedule and quality progress from the site RFI verification to site acceptance.
Carry out specific plans and conduct implementations based on the specifications defined by VENDOR cluster leader.
Follow up & keep track of Site delivery progress.
Share the site integration plan and update with corresponding vendors.
Site installation completion documents management.
Doing transmission planning for LOS survey sites and finding the repeated sites.
Get punches point information from QA audit team as well as project team.
Issue tracker update and punch point clearance.
Support survey and I&C activities.
Daily trouble-shooting.
Reporting to Project Manager of vendor companies
MAJOR ASSIGNMENTS
RF&LOS Survey
LOS Survey for TATA DOCOMO in Tamil Nadu from Dec 08-April09.
LOS Survey for TATA DOCOMO in ROTN from Dec08-April09.
LOS Survey for TATA DOCOMO in KERALA from Feb09-May09.
LOS Survey for TATA DOCOMO in BIHAR from Oct09-Dec09.
LOS Survey for DATACOM in HARYANA from Dec09-Feb10.
LOS Survey for DATACOM in U.P EAST from Dec09-Feb10
LOS Survey for DATACOM in M.P from Dec09-Feb10.
LOS Survey for DATACOM in GUJARAT from Dec09-March10 and more.
Installation & Commissioning
Microwave I&C for NEC in GUJARAT from Jan10 till date.
Microwave I&C for NEC in M.P from Jan10 till date
Microwave I&C for NEC in BIHAR from Dec09-Feb10
Microwave I&C for NEC in HARYANA from Jan10 –Feb10.
Microwave I&C for HUAWEI in MAHARASTRA from Feb10-April10.
Microwave I&C for HUAWEI in ROB from Feb10-April10 and more.
L&G Engineering Services (P) Ltd, Jabalpur.
From June’08 to July’09 I worked with L&G Engineering Services (P) Ltd. as TRANSMISSION ENGINEER handling all the survey engineers working across India for different operating level of companies.
Project Coordination: Coordinating all the survey engineers working across India for different operating companies and providing them site data for survey.
Tracker Maintenance: Collecting the tracker from vendor companies and providing the site from it to our engineers and maintaining the tracker after survey. Maintaining DPR of all the engineers.
Generating Path Profile: Generating the path profile of all the hopes on PL4, preparing GR4 and finding repeated site if LOS gets blocked.
Telecom Network Solution (P) LTD, Noida.
From Dec’07 to March’08 I worked in TNS (P) Ltd. as RF ENGINEER, worked in Rajasthan and Maharastra for Aircel Project and did RF/LOS Survey. Generate the path profile for the hope allotted to me.
Job Profile:
Getting the best site location in the search radius for mounting the new tower.
Allotting the best sector for GSM antenna considering the positive clutter.
Checking for obstacle details that may obstruct the transmission path of MW link as planned.
On field obstacle heights collection of transmission path of PTP MW link.
Proposing the optimum height of antenna keeping in view the height of obstacles and
Clearance criteria.
Preparing path profile for all the hopes with the help of PATH LOSS and MAP INFO.
TRAINING
Attended training on GSM fundamental, PL4/GR4, 3G technology for 10 days in ZTE INDIA (P) LTD, Gurgaon.
Attended training on Digital Wireless Technology for 2 months in TNS Noida.
ACADEMIA
B.E (Electronics & Communication) from Anna University, Chennai 2008. Secured 74% marks.
H.S.C from Bihar Board in 2003. Secured 64% marks.
S.S.C from I.C.S.E Board in 2001. Secured 65% marks.
PROJECT
Title : True Multimedia Transmitter @ DACE, Chennai.
Objective of project : To design a true multimedia wireless transmitter that works over the range of 1 km and allows the transfer of video and audio signal from one source to different destination.
IT SKILLS
Operating system : Window 9x / XP
Language : C, C++.
Packages : MS-Office, PATH LOSS 04/GR 04, MAP INFO, MCOM, TEMS 8.0.2
Tools : GPS, Altimeter, Inclinometer
PERSONAL DETAILS
Father name : Devesh Thakur
Date of Birth : 02nd September, 1986.
Language Known : English, Hindi
Nationality : Indian
Marital Status : Single
Permanent Address: House no.04, Road no.18,Gardanibagh,Patna
Contact number : +91-933*******/+91-544*-******
Brijesh Kumar