CURRICULUM VITAE

WAWAN SALIAWAN

Home Address : Kp. Pasekon Jl.Pasir Kampung Gg. Bunga No 11 Rt./02/16.Cipanas, Cianjur, West Java Province –Indonesia 43253.

Contact No : +62 (263) 516193 /+62-821********

E-mail : obscqr@r.postjobfree.com

obscqr@r.postjobfree.com

Date of Birth : 01 - April – 1974

Religion : Moslem

Nationality : Indonesia

Languages Known : English

Passport No : A 0742935

Education Qualification:

• Bachelor 0f Marine Science (1999) Diponegoro University.Semarang.Central Java Indonesia

• Senior High School (1994) – Jakarta Indonesia.

Professional Job Skills:

• QA/QC Engineer / Welding Inspector.

• Mechanical Piping, Pipeline Inspector.

• Steel Structure Inspector,

• Pressure Vessel Inspector.

• Project Management Certification

Professional Certification / Courses:

• Certified Welding Inspector CSWIP 3.1(Certificate No.54483) certified by TWI SEA ( TWI South East Asia) December 2010.

• ASNT Radigraphy Interpreter (RI) (Certificate No.0711.23.1079) - Institute for Research and Development of Material and Technical Product Industries B4T Bandung 2011

• ASNT UT Level II (Certificate No.0210.22.1099)- Institute for Research and Development of Material and Technical Product Industries B4T Bandung 2010

• T-BOSIET Training( Certificate No: 05070403) Helicopter Ditching (HUET), Boat Transfer, Sea Survival, Basic Fire Fighting / SCBA & Basic First Aid / CPR. Issued by SURVIVAL SYSTEMS ASIA – PT. Samson Tiara. Cilegon Banten. 2009.

• Offshore Pipeline Inspector – DNV, DNV-OS F101 Course: OFFSHORE PIPELINE: Design, Fabrication, Installation, Testing, Maintenance and Pipeline Integrity Management (PIM). Issued by DNV-Norway .Bandung, Indonesia 27 – 31 AUGUST 2007.

• Onshore Pipeline Inspector. ANSI/ASME B31.8 & B.31.4 ONSHORE GAS & OIL PIPELINE Course: Design, Fabrication, Installation, Testing, Maintenance and Pipeline Integrity Management (PIM). Issued by Direktorat Jenderal Minyak dan Gas Bumi. Bandung 23-24 AUGUST 2007.

• Pressure Vessel Inspector Course - ASME VIII Div.1: Design and Fabrication Boiler and Pressure Vessel. Issued by Direktorat Jenderal Minyak dan Gas Bumi. Bogor. 13 – 19 December 2005.

• Welding Inspector (WI) (Certificate No: 0502.12.47.0989) Issued by Institute for Research and Development of Material and Technical Product Industries B4T Bandung 2002

• Indonesian Welding Society (IWS)(Certificate No: 029.05.02.WI.BDG) Issued by Institute for Research and Development of Material and Technical Product Industries B4T Bandung 2002.

• Confined Space Entry and Working at High Level Training. (Certificate No: CTA 017-BI-CSE-IDSA-JUL2009): Issued by PT. BARONS International, Bogor, 4-5 July 2009.

• MS. Office., Internet, Autocad, Scuba Diving

Code Familiarity:

DNV-OS F101 : Offshore Pipeline

API 1104 : Welding of pipe line and related facilities.

AWS D.1.1 : Structure steel welding code.

ANSI B.31.3 : Chemical plant petroleum refinery piping.

ANSI B.31.8 : Gas transmission &* distribution piping system.

ASME VIII & IX : Boiler pressure vessel code and procedure welding code brazing

Qualification.

ASME II Plant C : Specification welding rods, electrode and filler metals.

Summary Experiences

Generally having more than 8 years experience in Inspection, Certification and Engineering in Construction/Fabrication project onshore/offshore for Prepare procedure, Welding work, Steel structure/platform, Piping, Offshore/Onshore Pipeline, Pressure Vessel, Air cooler / Heat Exchanger. Experience In Inspection, Maintenance, Replacement (IMR) Programme, offshore and onshore oil and gas project

As Inspector :

• Material Inspection

• Performed Welder Qualification Test and Procedure Qualification Test

• Inspection of Fit Up

• Recording of welding parameter

• Welding visual inspection

• Dimensional check

• NDT supervision including review radiographic films

• Monitoring PWHT including review PWHT chart

• Review calibration certificates of equipment used

• Performed hardness test and holiday test

• Witness Hydro Test and Leak Test.

• Issued Non Conformance Report during fabrication (if necessary)

• Issued Punch List

• Preparation of QA/QC Documentation.

• Preparation Progress spread sheet

Work Experiences

1. January 2010 – present : PT. Biro Klasifikasi Indonesia BKI as Pressure Vessel, Pipeline, Structure, Inspector involved :

Pertamina Hulu Energy (PHE) Offshore North West Java

• New 3 NUI Offshore Platform Fabrication and Installation, PERTAMINA New Field Development.2011 (As qa/qc inspector Deck / Jacket Installation)

• New pipeline installation project for APN Field Development Project 2011 ( QA/QC Welding Pipeline Inspector) 2011.

• Pipeline Replacements Project / PRP Pertamina Hulu Exploration PHE offshore west java 2010 ( QA/QC Welding Pipeline Inspector)

• Pressure Vessel Asset Integrity / qa/qc inspector for existing Pressure vessel Inspection programme

• Under water Inspection Programmers Platform 2010

Premier Oil – Gajah Baru Project

• Jacket Fabrication for WHP at Nisconi Batam ( QA/QC Welding Inspector)

2. 11 April 2005 – January 2010: PT. INDOSPEC ASIA as Third Party Inspector / QA/QC Engineer / Inspector / Field Coordinator.

Main job description: Performs Client Engineering reviewed, shop fabricaton Inspection (Welding Inspector), Testing activities on projects site (Offshore or Onshore) and provide technical reports in the framework of certification on behalf of company and /or government body (MIGAS). Project involved:

o HESS Indonesia ( December 2009 )

Ujung Pangkah Development Phase II OFFSHORE Project, Inspector for Air Cooled Heat Exchanger Fabrication at S & T Corp. South Korea

o Total E&P Indonesie – BSP Area –Pressure Vessel Integrity Project (September – present 2009), scoup of works:

Perform intermediate inspection on existing pressure vessel,

Reviewed Workbook (SAP programme), Inspection drawing with actual condition,

Perform general visual inspection on existing pressure vessel

Supervised on UT Wall thickness measurement on existing pressure vessel

Supervised on UT Scanning process for corrosion survey on existing pressure vessel

Review NDT reports,

Perform Calculation for Required minimum thickness for shell and head. Perform corrosion rate calculation for existing pressure vessel and remaining live for existing pressure vessel

o Conoco Phillips - North Belut Project (July 2009)

10” Pipeline intallation for Condensate pipeline from NBCPP to KRISI PLEM,

Job Responsibility: perform coordination of inspector, Reviewed QA/QC Document, Engineering Document, monitoring, welding production inspection(welding inspector), Hydrotesting.

o Medco E&P Lematang (January – July 2009)

Singa Gas Development Project:

Field Coordinator for Mechanical Static Fabrication at PT. Heat Exchanger Indonesia – Batam, Job responsibility: perform coordination of inspector to monitoring, welding inspection, testing and certification Pressure Vessel, Column, Heat Exchanger, Air Cooler.

Field Coordinator for 12” Onshore Installation for Sales Gas Pipeline from CPP thru PGN - Pagerdewa gas station. Job Responsibility: perform coordination of inspector, Reviewed QA/QC Document, Engineering Document, material receiving monitoring, welding inspection, Hydrotesting.

o HESS Indonesia ( January – November 2008 )

Ujung Pangkah Development Phase II Project:

Field Coordinator for Mechanical Static Fabrication at PT. Puspetindo Fabricator, PT. Barata Fabricator, Gresik Surabaya. Job responsibility: perform coordination of inspector to material receiving monitoring, welding inspection, testing and certification Pressure Vessel, Column, Heat Exchanger, Air Cooler.

Field Coordinator for 24” Onshore Pipeline Installation for Oil transportation. Job Responsibility: Reviewed QA/QC Document, Engineering Document, material receiving monitoring, welding inspection, Hydrotesting.

o PT. TGI Indonesia – MMC Malaysia – K H E South Korea ( July 2008 )

Jabung Gas Booster Field Development Project:

Client Site Representative (CSR) for Fabrication, inspection, testing and certification Heat Exchanger - Air Cooler. Korean Heat Exchanger Fabricator, Gunsan South Korea.

o BP West Java (December 2007 – January 2008)

Project: Inspection, Maintenance and Repair ( IMR )- Complete Inspection ONWJ Offshore Platform.

Monitoring and inspection Jacket Platform (underwater): Scouring, Jacket member, wall thickness, marine growth, anode, riser, j-bow.

o Conoco Phillips (July - August 2007)

Project: Inspection, Maintenance and Repair ( IMR )- Complete Inspection Southern Area Platform.

Monitoring and inspection Jacket Platform (underwater): Scouring, Jacket member, wall thickness, marine growth, anode, riser, j-bow.

o Kondur Petroleum (June – July 2007)

Project: Pressure Vessel Recertification

Monitoring UT wall thickness measurement, visual inspection pressure part, pressure gauge and safety valve.

o Chevron Indonesia (January – February 2007)

Project: Inspection, Maintenance and Repair ( IMR )- Complete Inspection Northern – Southern Platforms

Monitoring and inspection Jacket Platform (underwater): Scouring, Jacket member, wall thickness, marine growth, anode, riser, j-bow.

o HESS Indonesia ( 2006 )

Project: Ujung Pangkah Development Phase I at PT.HEI Batam, PT.SSB Jakarta, PT.PAL Indonesia Surabaya.

Monitoring, inspection, testing and certification Pressure Vessel, Heat Exchanger, Air Cooler and WHP-A Well Platform

o Total Indonesie (2006)

o Project: TUNU 10 Development at PT. Daekyung Heavy Industries Cilegon

o Monitoring, inspection, testing and certification Pressure Vessel.

o BP West Java (2005)

Project: Annual Platform Inspection - Above Water /Top Side platform Inspection.

Visual Inspection for detect deteriorating coating system, excessive corrosion, and bent, missing, or damage Jacket members and monitoring anode potentials at splash zone.

o Medco E&P Indonesia (June – July 2007)

Project: Pressure vessel Recertification

Monitoring UT wall thickness measurement, visual inspection pressure part, pressure gauge and safety valve.

o Kodeco Energy (April - November 2005)

Project: KE 30 Field Developments at Adiguna Fabricator Tj. Priok, Multifabrindo Gemilang, Cilegon.

Monitoring, supervise, and inspection KE – 30 Platform / Jacket Fabrication, and pressure vessel fabrication

3. PT. ELPUTCIKA PERSADA Fabricator (28 Feb – 28 Sep 2004)

Project: Pressure Vessel Fabrication for Akar Golindo TAC-Pertamina

Monitoring, inspection and testing pressure vessel fabrication.

4. PT. TRIPATRA EPC / GULF (01 July 2003 thru 12 Feb 2004): as QA/QC Inspector on behalf PT. Perusahaan Gas Negara (PGN),

Project:

• 28 inch BRANCH SUBMARINE PIPELINE 215 Km with DNV OS-F101-2000 Specs. On Board HYUNDAI HEAVY INDUSTRIES Lay Barge HD-423 (Auto Welding), HD-289 and Jaya Barge 254.

• 28 inch BRANCH PIPELINE 3.8 Km (Offshore-Onshore) API 1104 Specs

Monitoring, inspection and testing for offshore – onshore gas pipeline installation.

5. PT. HORIZON OFFSHORE INDONESIA (July - August 2002) as QA/QC Inspector

Project: 20 inch Sub sea Pipeline Installation MWP. A to SWP.G TotalFinaElf E&P Indonesie. Peciko Offshore Development Project-Phase III

Monitoring, inspection and testing 20 inch offshore pipeline, Dog-Leg installation with DLB.Sea Horizon.

6. February – June 2002 PT. KUALITA INSPECTINDO DINAMIKA as Welding Inspector, Project : PT. SEMPEC INDONESIA, PECIKO ONSHORE DEVELOPMENT PROJECT – PHASE III (TotalFinaElf E&P Indonesie). Job Responsibility : Inspection and test for Welder Qualification, Welding Procedure Specification (PWHT, STRUCTURE, PIPING) including Destructive and Non-Destructive Test, verity material, fit-up inspection, visual inspection, supervised NDT, monitoring and auditing of welding at PT. Promits Engineering and Construction Workshop.

Declaration –

I here by declare that the above information is true and best of my knowledge.

Date: 12 Mar. 2011

Wawan Saliawan