RESUME
Post Applied for : Lead production Operator
Technical activities : Process, startup,
Shutdown and
Well test&head
Total experience : 14 years
Name : A.GANESAN
Father’s Name : S.Angappan
Date of Birth & Age : 14-11-1976 35 years.
Nationality : Indian
Permanent Address : 9, Kulanthaivel puram 1st street,
Vellaikottai, Aruppukottai, 626 101
Vruthunagar (Dist) TamilNadu.
Email id : ndwbqt@r.postjobfree.com
Phone no: : 009**-********,91-994*******
Technical Qualification : Diploma in Chemical Technology
:B.Tech Chemical Engineering
Passport Details
Number : G7223520
Valid upto : 22-04-2018
India Driving License : F/TN/067/001942/2001
Following Training completed
• FIRE FIGHTING
• TBOSIET
• PTW
• H2S
• FIRST AID
• IWCF
Having 14 years onshore and offshore experience in
Oil and Gas field
• Worked with ONGC/Central Process Facility onshore from July 1997 to Dec 1998 as a process operator in onshore at India.
• Worked with ONGC/Bombay High Offshore from Jan 1999 to Feb 2000 as a production operator at India
• Worked with OIL since mar 2000 to Feb 2004 as a well head and Plant operator in onshore at India.
• Worked with CEIL Since Mar 2004 to Jan 2006 as a Production operator in offshore at India
• Worked with RAS GAS since FEB 2006 to Dec2006 as a well head panel operator Under PROSERV in offshore at Qatar.
• Worked with PDO since Jan 2007 to Oct 2009 as a senior well head and test operator at Oman.
• Presently working with TEPQ since Nov 2009 to till date as a Senior operator in offshore at Qatar
My nature of job in onshore well head.
• Inspection of all wells fortnightly.
• Shut and divert the well for control main gas line pressure
• Stop cocking operation of the well periodically.
• Collection of well data’s in all wells periodically.
• Well head maintenance and greasing all wells periodically.
• Change over the bean and housing.
• Test the all wells by separator periodically
My nature of job in Offshore well head.
• Open and close the TRSC-SSSV and SSV by WHCP
• Equalizing the well.
• IRR operation of the well.
• Adjust the flow by production choke.
• Collect the Annulus data from all wells.
• Depressurize the Annulus pressure
• Check the ESP data.
• Change over the ESP and FCV periodically.
• Test the all wells by MPFM periodically.
• Check and collect Hydraulic oil return from TRSC-SSSV
My nature of job in Offshore unmanned and process platform.
• Inspection and co-ordinate of all PTW job
• Maintain instrument air pressure in volume bottle by start I/U comp.
• Check all safety equipment every month.
• Transfer of well fluids to process platform through subsea flow line.
• Top up GCI,OCI,Antifoam,Biocide and demulsifier.
• Check and adjust the chemical rate.
• Change over the oil pump and glycol pump every week.
• Collect the glycol and water sample daily
• Collect oil and gas sample every week.
• Collect all process parameter manually.
• Depressurize the platform for rig move and arrival
• Shut and start up the platform.
• Check ESD function test yearly
• Line up the pig Receiver
• Launch the 12”, 16” and 20” Pig.
• Change over the Sea Water Lift Pump periodically.
• Prepare injection water by RO plant
• Change over the glycol and water filter.
• Check and adjust the injection well rate daily
• Collect water injection sample weekly.
• Co-ordinate loading & offloading the chemical and Hydraulic oil
• Check Eruptivity test on ESP wells
• Inhibition and normalize the GDF, thermo wire as per job requirement.
• Co-ordinate the mechanical isolation and de-isolation.
• Co-ordinate the electrical isolation, de-isolation and LTI.
• Conduct all emergency drills every month.
Operation of gas dehydration
• Maintain separator pressure and level by SDV, LCV and PCV
• Maintain absorber gas pressure by PCV and calculate flow rate by orifice type flow meter.
• Maintain level of Rich glycol in Absorber by PID control Valve.
• Calculate mainline gas flow rate by custody transfer meter.
• Maintain level of Rich Glycol in Flash tank by PID control Valve.
• Maintain reflux column temperature by three-way valve.
• Changeover the glycol pumps periodically.
• Collect Glycol sample daily.
• Drain and refill the glycol.
• Collect regeneration all parameter manually.
Operation of crude stabilization
• Maintain separator pressure, level and temperature by SDV, LCV and TCV
• Inject the Oil Corrosion Inhibitor and demulsifier in up- stream of prod separator
• Disposal of the produced water.
• Gas flow rate control & calculate by PCV and orifice meter.
• Oil flow rate control by LCV and calculate by Turbine meter.
• Change the Storage Tank as and when required.
• Check the S/T level by manually.
My nature of Job in WELL TEST
• Connect Hyd.hose to all well head valves
• Recycle the TRSC-SSSV.
• Collection of well data (FTHP,SITP,H2S,CO2&BSW)
• Monitoring the SC-SSSV, HMV, KWV Hyd. pressure.
• Operation of choke manifold.
• Fitted ESD switch in required place.
• Rig down all equipment after testing.
• Rig up and rig down of 15k &10k package the wt equipment
• Operation of FBL and SMS.
• Monitoring WHP.WHT.ANNULUS &Flow rate
• Operation of test separator.
• Operation of production test.
• Recertification of all well test package every year.
• We are handling callout job operation.
• Pressures test the testing equipment as per procedure.