STEVEN D SHROPSHIRE
Los Angeles, CA 90063
Phone: 323-***-**** Email: n9oef4@r.postjobfree.com
Qualifications: Sheet metal mechanic-24 yrs. Field & shop, HVAC & general.
LADBS CERTIFIED WELDER, structural and light gauge.
AWS D9.1, GMAW & GTAW stainless steel (0-.25)” -CERTIFIED.
TABB CERTIFIED TECHNICIAN OSHA30 certified.
Certified rigger, signalman, & lift operator (fork, scissor, & boom)
Special Experience: HOSPITALS, SCHOOLS, METRO RAIL, LAX, CASINOS.
Work History:
Employer: Precision Air Systems, LA, CA 818-***-****
Dates: 2012(08/21-24) Foreman: Arvanez
Project: Elevator generator exhaust completion (welded schedule 40 pipe) at
Normandie Terrace apartments (new construction).
Employer: Countywide Mechanical 619-***-****
Dates: 2011(12/21)-2012(02/16) Foreman: Dan
Project: LAUSD HS#7 new construction: hard duct connections in
shower/locker rooms, GMAW connected 18ga stainless exhaust duct
in chemistry lab/class rooms and kitchen grease duct, FCAW
connected 22ga flashings to 18ga pad covers on rooftops.
Employer: Airemasters A C, Santa Fe Springs, CA 562-***-****
Dates: 2011(07/18- 09/09) Foremen: Richard & Shawn
Project: L A Dept. of Building & Safety certified structural welding for
support of sound traps at Sylmar High (new construction).
Employer: Air-Tec, Carson, CA. 310-***-****
Dates: 2011(04/11- 05/11) Foreman: Dave Bentley
Project: Shop assembly of Kaiser hospital rooftop duct.
Employer: Key Air, Santa Fe Springs, CA. 562-***-****
Dates: 2010(02/01- 03/26) Foreman: Phil Makuch
Project: LADBS certified structural steel welding for new
construction of Dendreon(pharmaceutical) level 4 clean
room.
Employer: University Marelich Mechanical 714-***-****
General Foreman: Sam Shipka
Dates: 2006(06)-2009(10) Foreman: Brian LeCesne
work cell: 714-***-****
Projects: Fabrication and installation of hvac duct and equipment,
including inspected and/or pressure-tested welding at new
construction sites: Ronald Reagan Hospital, USC
Replacement Hospital, UC Irvine bio-science lab, San
Manuel Casino, SLACC student services/administration,
LAX, Metro-rail Gold-line extension (Soto & Mariachi
stations), Westwood Veterans' housing/treatment complex.
Employer: Air-Tec 310-***-****
Dates: 2006(06) one week
Project: Tenant Improvement (TI) duct for a two story Miracle Mile
office building.
Employer: Control Air Conditioning Corporation 714-***-****
Dates: 2004(11)-2005(01) Foreman: Dave Wiley
Project: Kaiser Hospital (Sunset & Vermont): welding of duct
supports in shafts and air-handling equipment to pads and
itself on the roof. Welds were inspected.
Employer: ACCO Engineered Systems 818-***-****
Dates: 2004(04)-2004(11) Foreman: Jaime Gomez
Project: Kaiser Hospital (Panorama City): structural & stainless duct
welding, rooftop rigging, assembly, & installation of airhandling
equipment, plenums and duct. Welds were
inspected &/or pressure tested.
Employer: Western Air & Refrigeration (Limbach) 714-***-****
Dates: 2003(11)-2004(03/22) Foreman: Steve Hinson
current work #: 909-***-**** X 274
Project: Cal-Trans administration building downtown LA: welding of
duct supports in shafts & on the roof, rigging of air-handling
units & duct, seismic reinforcement of duct & components
of the air system, duct installation. Welds were inspected.
Employer: Kinetics Systems Inc (management group) 949-***-****
Dates: 2003(09-10) Foreman: Steve Hinson
Project: Cal-Trans building downtown LA. (same as above)
Employer: Scott Company of California out of business
D a t e s : 2002(12)-2003(09) Foreman: Steve Hinson
Projects: Seismic Replacement Building (UCLA), Cedar Sinai central
plant expansion, Cal-Trans downtown LA (same as above).
Employer: Van Nuys Sheet Metal 562-***-****
Dates: 2002(11) three days
Project: Van Nuys City Hall, new construction: installation of gutters
and roof panels.
Employer Sanders Engineering out of business
Dates: 2002(10-11) Foreman: Rick Diioli
current work #: 805-***-****
Project: Retrofit of Metro-rail side-walk emergency doors with
pneumatic powered openers.
Employer: Western Air & Refrigeration (Limbach) 714-***-****
Dates: 2002(09-10) Foreman: Mike Irei
Project: Hollywood Presbyterian Hospital: duct installation.
Employer: Coastland Air Inc out of business
Dates: 2002(08-09) Foreman: Leroy Herbaugh
Projects: LAUSD schools in Long Beach, Burbank, & Granada Hills:
duct installation in existing facilities.
Education: Some post high school - 1yr LACC, 2yrs UCLA
4yr Apprenticeship Completed with SMWIA#108
LA County Building Trades Council
Classes completed in prints & specifications, TAB, detailing,
welding, supervision
CA Drivers
License Class: C (passenger car)
References: Available on request