Post Job Free

Resume

Sign in

Project Construction

Location:
Los Angeles, CA, 90063
Posted:
October 11, 2012

Contact this candidate

Resume:

STEVEN D SHROPSHIRE

*** * ******* **

Los Angeles, CA 90063

Phone: 323-***-**** Email: n9oef4@r.postjobfree.com

Qualifications: Sheet metal mechanic-24 yrs. Field & shop, HVAC & general.

LADBS CERTIFIED WELDER, structural and light gauge.

AWS D9.1, GMAW & GTAW stainless steel (0-.25)” -CERTIFIED.

TABB CERTIFIED TECHNICIAN OSHA30 certified.

Certified rigger, signalman, & lift operator (fork, scissor, & boom)

Special Experience: HOSPITALS, SCHOOLS, METRO RAIL, LAX, CASINOS.

Work History:

Employer: Precision Air Systems, LA, CA 818-***-****

Dates: 2012(08/21-24) Foreman: Arvanez

Project: Elevator generator exhaust completion (welded schedule 40 pipe) at

Normandie Terrace apartments (new construction).

Employer: Countywide Mechanical 619-***-****

Dates: 2011(12/21)-2012(02/16) Foreman: Dan

Project: LAUSD HS#7 new construction: hard duct connections in

shower/locker rooms, GMAW connected 18ga stainless exhaust duct

in chemistry lab/class rooms and kitchen grease duct, FCAW

connected 22ga flashings to 18ga pad covers on rooftops.

Employer: Airemasters A C, Santa Fe Springs, CA 562-***-****

Dates: 2011(07/18- 09/09) Foremen: Richard & Shawn

Project: L A Dept. of Building & Safety certified structural welding for

support of sound traps at Sylmar High (new construction).

Employer: Air-Tec, Carson, CA. 310-***-****

Dates: 2011(04/11- 05/11) Foreman: Dave Bentley

Project: Shop assembly of Kaiser hospital rooftop duct.

Employer: Key Air, Santa Fe Springs, CA. 562-***-****

Dates: 2010(02/01- 03/26) Foreman: Phil Makuch

Project: LADBS certified structural steel welding for new

construction of Dendreon(pharmaceutical) level 4 clean

room.

Employer: University Marelich Mechanical 714-***-****

General Foreman: Sam Shipka

Dates: 2006(06)-2009(10) Foreman: Brian LeCesne

work cell: 714-***-****

Projects: Fabrication and installation of hvac duct and equipment,

including inspected and/or pressure-tested welding at new

construction sites: Ronald Reagan Hospital, USC

Replacement Hospital, UC Irvine bio-science lab, San

Manuel Casino, SLACC student services/administration,

LAX, Metro-rail Gold-line extension (Soto & Mariachi

stations), Westwood Veterans' housing/treatment complex.

Employer: Air-Tec 310-***-****

Dates: 2006(06) one week

Project: Tenant Improvement (TI) duct for a two story Miracle Mile

office building.

Employer: Control Air Conditioning Corporation 714-***-****

Dates: 2004(11)-2005(01) Foreman: Dave Wiley

Project: Kaiser Hospital (Sunset & Vermont): welding of duct

supports in shafts and air-handling equipment to pads and

itself on the roof. Welds were inspected.

Employer: ACCO Engineered Systems 818-***-****

Dates: 2004(04)-2004(11) Foreman: Jaime Gomez

Project: Kaiser Hospital (Panorama City): structural & stainless duct

welding, rooftop rigging, assembly, & installation of airhandling

equipment, plenums and duct. Welds were

inspected &/or pressure tested.

Employer: Western Air & Refrigeration (Limbach) 714-***-****

Dates: 2003(11)-2004(03/22) Foreman: Steve Hinson

current work #: 909-***-**** X 274

Project: Cal-Trans administration building downtown LA: welding of

duct supports in shafts & on the roof, rigging of air-handling

units & duct, seismic reinforcement of duct & components

of the air system, duct installation. Welds were inspected.

Employer: Kinetics Systems Inc (management group) 949-***-****

Dates: 2003(09-10) Foreman: Steve Hinson

Project: Cal-Trans building downtown LA. (same as above)

Employer: Scott Company of California out of business

D a t e s : 2002(12)-2003(09) Foreman: Steve Hinson

Projects: Seismic Replacement Building (UCLA), Cedar Sinai central

plant expansion, Cal-Trans downtown LA (same as above).

Employer: Van Nuys Sheet Metal 562-***-****

Dates: 2002(11) three days

Project: Van Nuys City Hall, new construction: installation of gutters

and roof panels.

Employer Sanders Engineering out of business

Dates: 2002(10-11) Foreman: Rick Diioli

current work #: 805-***-****

Project: Retrofit of Metro-rail side-walk emergency doors with

pneumatic powered openers.

Employer: Western Air & Refrigeration (Limbach) 714-***-****

Dates: 2002(09-10) Foreman: Mike Irei

Project: Hollywood Presbyterian Hospital: duct installation.

Employer: Coastland Air Inc out of business

Dates: 2002(08-09) Foreman: Leroy Herbaugh

Projects: LAUSD schools in Long Beach, Burbank, & Granada Hills:

duct installation in existing facilities.

Education: Some post high school - 1yr LACC, 2yrs UCLA

4yr Apprenticeship Completed with SMWIA#108

LA County Building Trades Council

Classes completed in prints & specifications, TAB, detailing,

welding, supervision

CA Drivers

License Class: C (passenger car)

References: Available on request



Contact this candidate