Post Job Free

Resume

Sign in

Project Engineer

Location:
Bandar Baru Bangi, 436500, Singapore
Salary:
USD15,000 per month
Posted:
February 13, 2012

Contact this candidate

Resume:

Ir. MUHAMMAD NADZRI HUSIN

PERSONAL DETAILS

Date of Birth : 09 May 1974

Marital Status : Married

Nationality : Malaysia

I/C No : 740***-**-****

Tel No. : +601*-*******

Email : mbhbv9@r.postjobfree.com or

mbhbv9@r.postjobfree.com

Address : No.6 Jalan 7/2E Bangi D’7 Bandar Baru Bangi 43650 Selangor Malaysia

EDUCATION/QUALIFICATION

Degree in Naval Architecture & Ocean Engineering - University of Glasgow.

Registered Professional Engineer with Board of Engineer Malaysia ( Reg No. 13361)

Corporate Member of Institute Engineer Malaysia (IEM)

COURSE ATTENDED

Super User for Ship Design software “FORAN” in Madrid, Spain.

Basic Design - Hull Form Design

Basic Design - Stability & Damage Stability

Ship Management Audit Training

Project Planning & Implementation

DNV Superintendent Management Course

ISO 9001/2000 Course

H.S.E.M.S PETRONAS Course.

Writing and communication Skill.

Workshop for SBM maintenance.

BOSET Course for PCSB Offshore Passport

Port Facility Safety Officer (FPSO)Course

Floating Production Storage Offloading (FPSO)Course

CSWIP 3.1 Welding Inspector Level 2.

EXPERIENCE

1. PRESENT EMPLOYER : PETRONAS MARITIME SERVICES SDN BHD

Level 16, Menara Dayabumi

Jalan Sultan Hishammudin

50050 Kuala Lumpur

DEPARTMENT : MARITIME SERVICES AND CONSULTANCY DEPARTMENT

GENERAL JOB SCOPE (from 2002 to 2005):

1. Conduct Consultancy Services and Study.

I.e. A. Conditional Survey for Upstream Activities PCSB

B. On-Hire/off Hire Survey

C. Construction Supervision of Vessel and Marine Project.

2. Conduct Tendering Exercise and Develop Technical Specification.

PETRONAS Tendering Process

Pre-Tendering

• Technical Specification/Scope Of Works

• Pre-Screening Of Bidders

Contracting Strategy

• Project Brief And Scope Of Works

• Contracting Approach And Schedule

• ITB Synopsis

• Bidders’ List

Bidding

• Bid Issuance

• Pre-Bid Conference/Tender Briefing/Site Visit

• Communication With Bidders

• Receipt And Custody Of Bids

Evaluation Of Bids

Evaluation Criteria

3. Conduct Marine Audit on PETRONAS Term Chartered Vessels for

Downstream and Upstream activities. (MITCO, LPPG & PCSB)

4. Conduct SBM Inspection & Maintenance.

5. Project management on Vessels construction for KPSB, SUPSB & PCSB.

Sept. 2010 – Current 2012

Project Assignment : Conversion and Life Extension of FSO SEPAT for PETRONAS Carigali Sdn. Bhd.

Position : Head of FSO SEPAT

Scope of Work : Managed and lead the plan, execution, control and supervise engineering work activities and perform project execution activities from contracting strategy, technical & commercial evaluation, contract execution and budget observation throughout conceptual and detail design, fabrication, installation, testing and commissioning.

April 2007 – August 2010

Project Assignment : Conversion and Life Extension of FPSO RUBY II for PETRONAS Carigali Vietnam Ltd

Position : Senior Naval Architect

Scope of Work : Plan, execute, control and supervise engineering work activities and perform project execution activities from contracting strategy, technical & commercial evaluation, contract execution and budget observation through out conceptual and detail design, fabrication, installation, testing and commissioning of surface facilities particularly in Naval Architect/Structural Engineering for FPSO RUBY project in line with company policy/objectives to ensure reliable and successful implementation which is critical to operational needs.

Provide total technical integrity solutions and expertise through technical review/compliance check and specialised studies; and continuously assess and enhance facilities design concepts, strategies, philosophies, standards and specifications to domestic and international.

Involve in Project activities such as Hazard and Operability Study (HAZOP), Project Integrated Review (PIR), Project Risk Assessment (PRA) etc in compliance with PETRONAS Technical Standard (PTS); international codes and standard, and best practices; local authorities or government regulations.

Detail scopes but not limited to the following:-

Responsible for management of FPSO conversion/modifications work, including hull, turret, topsides and mooring system.

Responsible for turret & helideck engineering & construction

Responsible for Ship Accommodation area modification and renewal.

Responsible for PLEM & Risers engineering & construction

Conduct material inspection as per applicable codes, standards and clients specifications

Check the welding procedure/processes as per approved welding procedure specifications.

Check/review IFC drawings to ensure fabrication is working according with the latest revision.

Monitor the works in progress and ensure conformity and consistency of application of the inspection procedure and other technical specifications.

March 2008

Project Assignment : Special Survey of MOPU and FPSO for PETRONAS Turkmenistan at Turkmenistan

August - Sept 2007

Project Assignment : Special Survey of FPSO RUBY PRINCESS for PETRONAS at Vietnam.

: Route Survey and Soil Boring Survey at Block 01 & 02 Vietnam water.

Jan 2006 – March 2007

Project Assignment : Conversion and Life Extension of FSO ABU CLUSTER for PCSB at MMHE, Pasir Gudang, Johor.

Position : Senior Naval Architect

Detail scopes but not limited to the following:-

Responsible for management of FSO conversion/modifications work, including hull, topsides and mooring system.

Responsible for turret (650 MT) & heli- deck (120 MT) engineering & construction

Responsible for 74” piles fabrication and installation.

Responsible for Ship Accommodation area modification and renewal. (30persons to 45 persons)

Responsible for Mid Water Arch & Anchor Block engineering & construction

Conduct material inspection as per applicable codes, standards and clients specifications

Check material specifications and types prior to layout, cutting and fit-up.

Check the welding procedure/processes as per approved welding procedure specifications.

Check/review IFC drawings to ensure fabrication is working according with the latest revision.

Monitor the works in progress and ensure conformity and consistency of application of the inspection procedure and other technical specifications.

Monitor weld repair works to ensure it is being carried out in accordance with the technical specification.

Inspect the installation of structural steel works for conformity ensuring correct configuration and weld preparation (i.e. straightness, levelness and ovality)

March 2006 – September 2006

Project Assignment : Construction of Turret and cantilever for FSO ABU CLUSTER at B.T Engineering Tuas, Singapore.

Position : Naval Architect

March 2006 - September 2006

Project Assignment : Construction of Mid Water Arch for FSO ABU CLUSTER at Hup Seng Engineering Services at Tuas, Singapore.

Position : Naval Architect

November 2005 – December 2005

Project Assignment : SUDAN Project for SBM-2. Operation and maintenance of SBM -2. Bidding the contract for Petronas Maritime Sdn Bhd.

Position : Project Coordinator

September – November 2005

Project Assignment : Pressure test and Installation Floating hoses for Armada Perkasa and Baram-E Platform at Baram Field, Miri.

Position : Project Coordinator

January – September 2005

Project Assignment : Construction of 2 units Tug Boat at Sumber Samudera Shipyard, Teluk Intan, Perak for Kerteh Port Sdn Bhd.

Position : Naval Architect

Jan 2005 – August 2005

Project Assignment : Construction of one unit Patrol Boat 7.5 m. at Sumber Samudera shipyard, Teluk Intan, Perak for Sungai Udang Port Sdn Bhd.

Position : Naval Architect

Jan 2005 – August 2005

Project Assignment : Construction of one unit Mooring Boat at Port Shipyard, Port Klang for Kerteh Port Sdn Bhd.

Position : Naval Architect

August 2003 - Dec 2003

Project Assignment : Project Maintenance Dredging & Beach Nourishment at Kerteh Port Sdn Bhd

Position : Maintenance Dredging’s Superintendent

January 2003 – Dec 2004

Project Assignment : Single Buoy Mooring (SBM-5) SKO - Quarterly

Inspection & Maintenance

Position : SBM Surveyor & Project Engineer.

May 2003 - July 2003

Project Assignment : Tug Boat Modification on Armada Teja at Miri

Position : Naval Architect

December 2002 - Feb 2003

Project Assignment : Tug Boat Modification on Armada Lekiu at Miri

Position : Naval Architect

June 2002 – Dec 2004

Project Assignment : Shipmanagement & Vessel Audit

Project Assignment : Vessel Inspection (Upstream vessel)

Position : Auditor & Surveyor

2. EMPLOYER : PSC NAVAL DOCYARD SDN BHD

TLDM NAVAL BASE

Lumut, Perak

Oct 2001 - May 2002

Project Assignment : Offshore Patrol Vessel (OPV) for Royal Malaysia Navy

Project Assignment : Penang Ferry for Penang Port

Project Assignment : Tall Ship for Royal Malaysia Navy. (Proposal - Fwd Design)

Position : Naval Architect

Scope of Work : Perform Basic & Detail design of Hull Structure design. Perform Intact & Damage Stability calculation.

Sept. 2000 - Sept. 2001

Project Assignment : Project Attachment at Blomn & Voss Shipyard, Hamburg, Germany for OPV RMN.

Position : Naval Architect

Scope of Work : Attached to Blomn & Voss Design office:-

Perform Basic & Detail design of Hull Structure design. Perform Intact & Damage Stability calculation.

Jun 2000 - August 2000

Project Assignment : Foran Super User Training in Madrid Spain

April 1999 - May 2000

Project Assignment : Conceptual Design - Forward Design Department

Diving Tender Vessel - (RMN)

Landing Ship Troop (LST) - (RMN)

Offhore Patrol Vessel (Iran)

Fast Ferry Various Type - RMN, Iran & Others

Target Barge (RMN)

Position : Naval Architect

3. EMPLOYER : LINTASAN KIRANA SDN BHD

Kota Bharu, Kelantan

Sept. 1998 - March 1999

Project Assignment : Sub- Contractor on Building and Structure Construction for Kementerian Kesihatan

Position : Site Engineer

4. EMPLOYER : DREXEL BAKTI OILFIELD SERVICES SDN BHD

Kemaman Supply Base

Kemaman, Terengganu

Nov. 1995 - June 1996

Project Assignment : Maintenance Services for PETRONAS CARIGALI & ESSO

Blasting & Painting

Pipeline

Fabrication

Position : Project Estimation

References:

1. Tuan Hj. Ir. Intizam Ayub

Ex PETRONAS Maritime Services Sdn. Bhd.

Resident Engineer for FPSO CTOC, Korea

Resident Engineer for FSO ABU CLUSTER, MMHE

Marine Engineer for MOPU Project PCPP

HP: 006-019-3521385



Contact this candidate