Post Job Free

Resume

Sign in

Engineer Project

Location:
India
Salary:
5000
Posted:
April 03, 2012

Contact this candidate

Resume:

CURRICULAM VITEA

R.SENTHIL KUMAR Current Contact

# **/** ********** ******, ********* – IGD Project

New washermenpet, Chennai-600081. Habshan5-Abu Dhabi-U.A.E

E-mail:m0knl2@r.postjobfree.com, Mobile No : +971-*********

m0knl2@r.postjobfree.com +971-*********

Mobile:+919*********,+919********* -----------------------------------------------------------------------------------------------------------------PROFESSIONAL PROFILE:

I have Total 11 years of professional experience in the project engineering phase of onshore Oil and Gas, LNG, Refinery, Petrochemical, gas processing plant construction and Hydro testing, pre commissioning in India and abroad. Experience ranges from the fabrication, erection, Pressure testing and Pre commissioning of various process equipments, piping systems, equipments, skid mounted assemblies, structural etc. and coordinating with various departments including Quality control, Planning, fabrication and site erection crew.

Education Qualification :-

B.Tech Mechanical Engineering

West Coast University – Panama

Diploma in Mechanical Engineering (D.M.E) (UAE Attestation)

Secured 86.08%-1st Class with Distinction.

Professional Qualification :-

Diploma in Workshop supervisor

Secured 71.25% 1st Class.

Diploma in Safety Officer

Skillfull Accredited Training

Designing Course

Plant Designing Management System(PDMS)

Kagira Drawing Solution

Technical Qualification :-

ASNT Level II- PT,UT,RT&MT

PTW Course

Qatar Petroleum approved PERMIT HOLDER (04/06/2010 upto Valid)

Safety Course Attended

Helicopter Under water escape training and basic sea survival valid till 04/06/2010

H2S and BA awareness RAS GAS

Computer Skills

PGDCA

Operating System- MS-Office

Programming – C, C++ & Visual Basic

DETAIL PROFESSIONAL EXPERIENCE

Organization : Tecnimont (U.A.E)

Designation : Piping Superintendent

Duration : May 2011 to Till Date

Client : GASCO

Project : HABSHAN 5 - IGD Project

Tecnimont is a leader in the provision of engineering, procurement, project management and construction activities internationally with emphasis on the Middle East region. HABSHAN 5 - IGD Project is the “Biggest project in the world” I was worked as a Site Field Supervisor-Piping in Process area SRU Phase-1&2

Organization : JGC/KBR Joint Venture(Qatar)

Designation : Piping chief Supervisor {Ref B # E-3079}

Duration : March 2010 to feb 2011

Client : Qatar Shell

Project : Qatar Shell Gas To Liquid

JGC/KBR Joint Venture is a leader in the provision of engineering, procurement, project management and construction activities internationally with emphasis on the Middle East region. Qatar Shell Gas to Liquid Project is the “Biggest GTL project in the world” I was worked as a Site Supervisor-Piping in Process area Phase-1&2

Organization : Chiyoda Technip Joint Venture(Qatar)

Designation : Piping Chief Supervisor {Ref B # RGX-1244}

Duration : October 2008 To Feb 2010

Client : RASGAS

Project : Ras Laffan-RGX 6&7 /AKG 2

Chiyoda Technip Joint Venture is a leader in the provision of engineering, procurement, project management and construction activities internationally with emphasis on the Middle East region.RasGas Expansion Project is the “Biggest LNG project in the world” I worked as a Site Supervisor-Piping in Process area train 6&7/AKG2.

Job Profile

• Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.

• Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.

• Raising MTO(s) for all materials required to additional materials for hydro test etc.

• Preparation of field piping system test packages ,including system limit on P&ID and piping Isometrics

• Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.

• Ensure that hydro test reinstatement is to be done as per procedure.

• Ensure tat all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.

• Elaborates construction feasibility analysis evaluating the available materials & drawings

• Carrying out final P&ID check of installed piping systems in the module.

• Develop Construction Engineering Technology in line with Company Policy and Procedures.

• Ensure all operations are carried out in accordance with Company National and International Health Safety and Environmental Legalization.

• Examine engineering proposals for constructability.

• Maintain the necessary records to ensure full quality assurance requirements are met.

• Organizing and allocation of right manpower for fabrication & erection.

• Coordinating with Planning for work schedules and priorities.

• Coordinating with Safety and QA/ QC dept. for smooth functioning of works

• Reviewing of the progress on daily & weekly basis and analyze the productivity of Resources.

• Re-conciliation of the works executed on regular basis.

Co-ordination with engineering team for Technical queries / Clarifications.

Organization : Trags Engineers & contactor Company(Qatar)

Role : Piping Engineer

Project : QVC,RAS-GAS,QP,& QAPCO(Shutdown)

Period : May 2008 to September 2008

Supervise Piping modifying for plant shut down preparations. Fabrichydro testing pipe spool piece for hook up and tie –in point for the piping modifications. Checking and planning of how to be done in existing point location while processing operating. Supervise how to cutting , welding and working for safety every point including work permit /fireman, fire water, gas detector checking before work starting and Pressure testing, air blowing.

Organization : Consolidated Contractors Company.W.L.L (K.S.A)

Designation : Piping Engineer

Duration : Jan 2007 to Jan 2008

Client : MHI

Project : INDEPENDENT WATER, STEAM AND POWER PROJECT (IWSPP)

Consolidated Contactors international Company (CCIC) is a leading diversified company carrying out construction, engineering, project management and procurement activities internationally with emphasis on the Middle East region. INDEPENDENT WATER, STEAM AND POWER PROJECT (IWSPP) is the combine cycle power plant in (kingdom of Saudi Arabia) Rabigh

Job Profile

• Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings

• Ensure the Productivity and Quality is maintained by subordinates.

• Coordinate with other Disciplines in site.

• Request spools, Supports, Fittings and Field erection materials as per schedule

• Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.

• Review technical documentation / drawings / projects / schedules. Responsible for safety and ensure that company safety regulation are applied in all areas.

• Self checking of isometric drawings against Master P & ID considering the integrity of the design base on project requirements, material specification, good design philosophy and practice.

• Responsible for line checking the punch items before hydro test as per P&ID, and ISO drawing prior for testing.

• Responsible for counter checking by Isometric/Piping plan ie GA drawing for the spools erected in the correct location, orientation, alignment and plumpness.

Organization : Gulf Spic (Kuwait)

Designation : Piping Engineer

Duration : May 2005 to Oct 2006

Project : EQUATE PETROCHEMICAL

Job Profile

Preparation of Consumables & Tool list according to the scope of work

Preparation of work reports and manpower plans

Issuing instruction to subcontractors in order to rectify the defects of the work

Manage the subcontractor foreman and labour

Arrange for the appropriate materials to be drawn from the stores

Prepare and submit daily records of the site activites

Good knowledge of reading piping drawing,isometrics and P& ID

Lead several piping erection team on site to erect piping and pipe support

Checking of piping works according to the execution procedure.

Preparation of time sheets,Production reports,welding & QC reports

Good knowledge of spool fabrication,erection,installation and hydro testing.

Experience in India: 1.Tamilnadu Petro Products Limited.

Manali, Chennai – 68

July 2004 – April 2005

Engineer

As a piping supervisor in Essen contract company maintenance of steam pipe line and spool fabrication maintenance work.

2. Pipe line Engineers.

Engineers & Contractors,

Thirumangalam, Anna Nagar,

Chennai -40,

May 2002 – June 2004

Engineer

As a piping & structural supervisor in pipe line engineers and contractors plant pipe line maintenance and pipe line construction

3. V. Marine ship yard,

M/S, Float Engineer Pvt.Ltd,

Chennai -81,

June 2000 – March 2002

Engineer

Working as the piping and plate work fabrication supervisor in the Indian coast guard ship major refitting work.

Working in Naiki Devi & Avvaiyyar India Coast Guard ship major refitting work as piping structural work supervisor.

Name : R.Senthil Kumar

Father Name : V.Rathinam

Date of Birth : 09-10-1981

Nationality : Indian

Marital Status : Married

Passport Details

Passport Number : E 7073587

Date of issue : 18-11-2003

Valid up to : 17-11-2013

Place of issue : Chennai

Passport status : ECNR

I here declare that all the statement made in this application are true and correct to the best of my knowledge and belief.

Place : Chennai Yours sincerely,

Date : (R.SENTHILKUMAR)



Contact this candidate