Resume

Sign in

Electrical Site Engineer

Location:
Tampines, 520856, Singapore
Salary:
7000 usd
Posted:
September 15, 2012
Email:
iyvet8@r.postjobfree.com
Contact Info:
*********@*****.***


ENGR. REZE G. ARROYO JR. (FILIPINO)

Mobile Number : +65 8522 1564/+65 905 52867

Passport No:UU0467692

(Registered Electrical Engineer) License No. : 27719

(Registered Master Electrician) License No. : 24736

E- mail : reze1642g@yahoo. Com

Permanent address: 3-283 block 856 st. 82 Tampines Singapore 520856

• Total experience: 10years

• Relevant experience: 7 years in Chemical, oil and gas industry, Power Plant as Electrical Engineer

• Qualification: Bachelor Degree in Electrical Engineering (5 years COURSE)

• Certifications : Licensed Registered Electrical Engineer &

Master Electrician (Under Philippine Regulation

Commission)

WORK EXPERIENCE:

SENIOR ELECTRICAL SITE ENGINEER (Owners Engineer/ Representative/ Consultant)

PARSONS and BRINCKERHOFF Ptd. Ltd.

Singapore

May.6, 2012 to September 2012

GMR energy Pvt Ltd. (OWNER)

Power Generation Plant CCPP (Combine Cycle Power Plant) 2x 400 MW

Main Contractors : Siemens Pte. Ltd & Samsung C&T Corporation

Scope of Work :

-Owner Engineers or Representative/ Consultant.

-Project Management.

-Review Engineering Design, Drawing and Commissioning.as per project Specification.

-Act as owner side consultant in the implementation of project construction and Commissioning.

-Monitor all main contractor in the Construction, Installation and commissioning of the project Power Plant

-Attend Site inspection and witness commissioning

-Issue Non Conformance Report to the contractor

-Update site construction progress as per schedule.

-Resolve engineering issue at site.

-Review Design Query, Inspection test plan, Method statement.

-Plant capacity: (230 kv GIS, 2 pcs. 500 MVA transformer, Generator 2x400MW ).

-Attend contractors meetings with regards: Progress, Quality and Safety.

ELECTRICAL SITE ENGINEER

Black Cat Engineering and Construction – EPIC Company

Client: QATAR PETROLEUM

Subcontractor: Kentech Qatar

AL BOROOQ BUILDING 2nd Floor Bin Mahmoud DOHA, QATAR

Project: Engineering, Procurement, Installation, and Commissioning(EPIC) of Upgrade of Recycle Compressor at ARAB D Plant, QATAR PETROLEOUM (SHUT DOWN JOB)

Jan. to April 2012

-Scope of work is Engineering Procurement Installation Commissioning

-Review all Engineering Design in compliance to Clients Requirements and International Standard

- Review all Procurement is in Accordance with the approve requirements within Project Specification and

clients requirements.

-Provide material take off as per project requirements.

-Review and Approved all as built drawings

-Submit Mechanical Completion package

-Supervise all Sub contractor and vendors during Construction, Installation and Commissioning stage of

the project.

-Monitor project progress and review all site engineering query with regards to some design and construction issue.

-Attend regular meeting with client on project management issue.

-Qatar Petroleum Permit to work Authorized applicant. (Brown field)

-Familiar with shut down procedure

-Prepare method statement and risk assessment.

-Review sub contractor Inspection test plan.

-Coordinate with operation team of QP in upgrading procedure of new line of plant.

-Pre commissioning and Commissioning – RFSU for the new 33kv breaker, 33/11 kv Transformer,11 kv breaker& soft starter panel and new 11 kv Motor

-Tie up with the operation or interface with the existing plant with regards of the operational requirements

-Coordinate with vendor from installation to Site Acceptance Test (Commissioning, Testing & Start Up).

-Coordinate with vendor on documentation for Inspection of the equipment from testing to hand over packages.

. -Jan 2012- May 2012

ELECTRICAL PROJECT ENGINEER

Rotary Engineering Company Private Limited

Jurong island, Singapore

Singapore Parallel Train (SPT) Olefins Recovery

CLIENT : EXXONMOBILE CHEMICAL ASIA PACIFIC

Contractor : Stone & Webster International Inc.

March 2010 – Jan 2012

Scope of Work :

-Responsible for managing the cost, schedule control and technical coordination with the client

and project team.

-Responsible for the technical review of drawings, materials, equipment, procedures and other

pertinent project documents.

- Responsible for interpreting and clarifying all technical details to the project team.

- Provide technical direction or instruction to personnel involved, proposing and reviewing of

corrective actions.

-Coordinate with other departments for problems relating to design and activity execution.

- Conduct daily toolbox meeting together with the Construction and Quality Personnel.

- Ensure that all aspects of works under the company scope are xecuted with respect to the

approved design and specification and with client or owner standards.

-Coordinate and execute statutory inspection and final hand over inspections.

- Managing a group of supervisor and foreman during project execution to achieve

target date of schedule. (Monitoring of project activities)

- Preparation of Method of statement

- Preparation of Installation Test Procedure

- Preparation of Testing and Work procedure

- Supervise with the site supervisor in work scheduling and construction execution.(Material Request, Installation, Inspection, Testing and Commissioning)

- Evaluate daily job safety analysis and work permit

- Coordinate with QA/QC department in implementing work quality procedure.

- Evaluate Scope of work with regards to contract.

- Supervise all job is executed within the exxon mobile global practice of standard, NEMA, IEEE, project specification and Singapore Law.

- Attend regular meeting with the client to resolve issue at site

Coordinate with other discipline in project execution.

- testing and commissioning – SUBSTATION 33 kv (ups, mcc – switchgear- 750, 745,

369 P121 and MM2 relay, LV-MV, bust duct installation, Cable loop Check,

transformer, interposing relay,Annunciator, dcs,motor)

- Installation Commissioning of 15 kv generator circuit breaker and 150 Mva Power transformer

- Preparation and executing all test package as per approve ITP

- Review Technical drawings and confirm installation as per AREA CLASSIFICATION (Zone)

- prepare technical query and as built drawings

- Submit all turn over packages after testing and commissioning

- Attend walk down with the client prior to handover of testing packages & Punch list Clearing

- Preparation of technical query.

- Permit Applicant with Exxon Mobile in Energize Substation and LOTO coordinator.

- Submit daily progress report and monitor project execution as per schedule.

Perform & Coordinate with vendors during SAT (Site Acceptance Test) testing and

Pre –commissioning of Electrical Equipment.

Attend inspection, and monitor project execution as per Project Quality Plan(PQP)

- Procurement of materials

- Preparation of daily progress Report for QS claim.

GAS TURBINE GENERATOR (INSTALLATION, TESTING & COMMISSIONING)

-Scope Installation of GTG, fire alarm, cable pulling, protection panel or Generator Control protection(Commissioning and testing), Motor pump installation, cable termination and glanding, motor testing(Megger, Hipot, Solo run, function check of control), Lighting installation, instrument loop check from mark VI to GTG instrument equipment.

Motor Control Center installation, testing, commissioning, Air circuit breaker testing.

Busbar Hipot from generator leads to Generator Circuit Breaker to the step up transformer.

Generator circuit breaker function check and step up transformer installation, testing, commissioning.

- Boiler (Motor Installation and testing, cable pulling, loop check of instrument folder, lighting installation, Lighting Transformer installation and testing.

-Documentation of Inspection, turn over package preparation, Handover to other discipline, Punch listing and clearing of punch prior to final handover to the client.

TESTING AND PRE -COMMISSIONING :

1.SUBSTATION 33 kv (UPS panel and Battery Load test . Motor Control Center (MCC)

switchgear- 750 – 745 GE (Feeder Management Relay),

Motor Management Relay GE- 369, Differential and Overload Protection P121 and

MM2 relay .

2.Verify Coordination Study of protection from upstream to downstream protection.

Test all relay if as per engineering settings such as; Trip test, Differential test,

Overload, ground fault, line to line fault. test, Under voltage, under frequency,

Automatic Transfer Test (ATS)- timing. Synchronization check.

3. Motor Control. Center (MCC – mm2 Relay) – Trip test for overload, Ground Fault and

timing. Conduct Megger and Hi pot for Medium Voltage and Low Voltage switch

Gear. Loop check of all interconnection cable from Field Equipment, to Switch gear,

to Interposing Relay to DCS.

4.Check all interlock as per circuit diagram.

5. Verify TCC curve, time Current Curve if as per coordination study.

6. Transformer- (Meggering, Hipot, Ratio Test, Dissipation Factor Test, Oil Test,

Function check of accessories from transformer to Annunciator to Switch gear, CT &

VT ratio and polarity test)

7. Cable – Meggering, Hi pot for MV, termination Check, Loop check.

8 Installation Commissioning of 15 kv generator circuit breaker and 150 Mva Power

9. Motor – Solo run ( Vibration check, Temperature & check the starting Current.)

Function Check of local control station ( Stop, Manual, start thru LCS or DCS)

DOCUMENTATION :

1. Verify all testing if as per approved Inspection Test Plan. Fill up all test form sign by all parties involve in the inspection and Prepare also test package as per turn over system.

2. Secure all test form in the Turn Over Packages for hand over to other discipline.

3. Punch writing documentation & closing of punch.

4. Secure all loop folder.

5. Prepare as built drawing.

ELECTRICAL SITE PROJECT ENGINEER

Rotary Engineering Company Private Limited

Pulao Ular Island, Singapore

ECC PROJECT SHELL HOUDINI – Ethylene Cracking Complex ("ECC")

Contractor : CB&I Lummnus - TOYO JV

May 2009 – March 2010

Scope of Work:

- Assists the Construction Superindent in the work implementation complying the drawings and

engineering Specification.

- Coordinate with the QA/QC Engineer and Planning Engineer to ensure quality controls and activity

schedules are met.

- Ensure that the drawings provided and used in the field are approved for construction and are of latest

revisions.

- Managing a group of supervisor and foreman during project execution to achieve

target date of schedule.

- Supervision of project electrical construction works, which includes, installations, inspection and

testing

- Supervise all supervisor on site with regards to Safety regulations, permit to work and Client technical specification requirements.

- Ensure the electrical works complied with project specifications, company procedures, method statements, quality assurance and control documents.

- Maintain daily supervisory surveillance checks and records ensuring that all supervisor are providing safe working conditions and permitting procedures, all required competent personnel, protective equipment, adequate supervision and manpower, with reliable, well maintained equipment to execute the contracted works as per contract schedule and target.

- Ensure the electrical works complied with project specifications, company procedures, method statements, quality assurance and control documents.

- Preparation of method statements and JHA's. Ensure that work is carried out in accordance with the agreed method statements.

- Attend client walkthrough & Resolve some issue regarding client punch list clearing / and coordinate with the turnover group of client

- Supervise / coordinate with QC/QS division.

- Area involve Substation, cable pulling, lighting, power, cable ladder, Termination and glanding

- Substation construction,equipment testing and installation, Motor installation & testing, Lighting

- Conduct STQ and Inspection, prepare weekly work schedule and Daily progress report

- Hot / Cold Commissioning and testing (substation – Installation function test for MCC- and switchgear MV 6.6 kv and 415v LV: 750,369, MM2, P121 relay )-,UPS – BATTERY installation and function test,Transformer installation and testing and commissioning. Loop check for internal cabling in SS, MOTORS – function test signal from substation to Remote control switch, solo run and couple run, function test from DCS to Substation to field motor, LIGHTING & SOCKET OUTLET- lux test and Function test for outlet .

- Cable testing

- Coordinate with other discipline with regards to work scheduling and implementation

- Attend inspection, and monitor project execution as per Project Quality Plan(PQP)

- Preparation of daily progress report. &confirm installation as per AREA CLASSIFICATION (Zone)

ELECTRICAL SITE ENGINEER

Consolidated Contractors Int’l. Company (CCIC)

Ras Laffan Industrial City, Qatar

PROJECT : QATAR GAS CONOCO PHILIPS SHELL (QCS) LNG ONSHORE PROJECT

Ras Laffan, Qatar

CONTRACTOR : CHIYODA TECHNIP JOINT VENTURE (CTJV)

SUB- CONTRACTOR : CONSOLIDATED CONTRACTORS INT’L. COMPANY

November 2007 – October 2008

Scope of Work :

- Responsible for establishing, implementing and maintaining the project quality management

system.

-Responsible for the preparation and submission of progress report as measuring and tracking of

volume.

-Responsible for the supervision of works to complete and meet the required quality standard’s,

specification at the schedule time.

-Ensure projects implemented are according to stipulated schedule and within the approved project

costs.

-Plan, schedule and co-ordinate the implementation of projects for timely provision of services to

client.

-Plan for weekly and monthly activities taking into account the actual materials, equipment and

deliverables.

- Authorized to identify quality related non conformances and initiate corrective actions.

-Preparation of Request for Inspection (RFI).

-Check for Damage and discrepancy against specifications and drawing

-Review of applicable drawings

-Continuity test for control cable and check trench depth and soft sand bedding

-Check electrical under ground stub up installation are inline with lay out drawing

-Insulation resistance and continuity test for LV and HV cable

-Verify cable routing against drawings, project specification and standard details

-High voltage injection test, cable joint installation and LV,MV,HV installation

-Inspection of Cable installation, glanding, identification and termination

Scope of Work : Substation Construction

-Cable tray installation / Grounding

-Preparation Cable list schedule for interconnection

-Inspection of Cable installation, glanding, identification and termination (Internal)

- Installation of power transformer, switch gear, motor controls centers,

-Installation of neutral earth transformer, batteries, chargers and ups

- Installation of 22kv and 6.6 kv switchgears, motor feeders, rcu, safety switch.

- Switchgear relay testing and interlocking .

ELECTRICAL SITE ENGINEER

HYUNDAI - Heavy Industries KSA

Damman Office KSA Telephone No. 03-805-6502

PROJECT : Construction of New Khurais 380/115 KV Bulk Supply Point (BSP) Substation

: Power Supply to SAUDI ARAMCO’S khurais area field development

CLIENT : Saudi Electricity Company –Eastern Operating Region (SCECO-EOR)

CONSULTANT : ZAMEL and TURBAG (ZATE)

CONTRCTOR : HYUNDAI - MEEDCO

SUB- CONTRACTOR : Al – Quinaieer Contracting Est

February – October 2007

Scope of Work

Supervision in the implementation of Approved Electrical Plan at Work Site :

- Supervise activities required to complete the work on time ensuring it meets the drawing

specification and requirements.

- Ensure compliance with quality Control.

- Plan, execute and monitor work activities and take corrective action if delays are identified.

- Review Daily, weekly and monthly work activities and reports

- Make Sure that all work is in accordance with the Project technical Specification between

HYUNDAI and SCECO.

- Implementation in the construction of electrical design in accordance to SCECO standard

- Cable pulling (internal and underground) & grounding

- Loop checking & termination and glanding

- Installation of transformer, switchgear, lighting, socket & welding outlet, cable tray.

- Prepare weekly schedule and daily progress report

- Supervision in the civil work of Sub Contractor

- Preparation of material take off.

- attend weekly meeting with client and coordinate with the regarding STQ and resolve site issue regarding drawing discrepancy.

QA/OC Engineer :

Prepare Request for Inspection for material and Work ( Including Civil, Mechanical and Electrical)

Work Scheduling and Monitoring

- Preparation of Daily Progress Report to be Submitted to SCECO

- Monitoring of daily progress versus the Main Schedule

- Responsible for establishing, implementing and maintaining the project quality management system.

- Assist the site management team at various stages of construction by conducting inspections and test in accordance with the approved inspection and test plan and project specification.

- Authorized to identify quality related non conformances and initiate corrective actions.

- Assist the construction personnel in solving problems pertaining to quality in order to prevent recurrence.

- Conduct testing, monitoring and inspections of assigned site activities.

- Prepare ITPs for particular parts of works.

- Prepare and completes QVD and ensures forms are transmitted.

-

SUBSTATION TENDER / ENGINEER

Leyte III Electric Cooperative Inc. (LEYECO III) (DISTRIBUTION UTILITIES)

Tunga, Leyte

June 2004 – Dec. 2006

Scope of Work: (Operation and Maintenance of Distribution Utilities)

Load Monitoring and Maintenance of substation Equipment’s such as (2)10 mva power transformer, (1) 3mva power transformer and High voltage protection namely,SF6 @ 69KV (PRIMARY Line), Oil Circuit Recloser and Vacuum Circuit Breaker using P122 relay alstom and siemens @ 13.2KV (Secondary Line), power fuse installation, air circuit breaker, disconnect switch.

Mobilization of linemen in case of fault trip off or outages in substation : locating, isolation (to minimize the scope of interruption), repair and restoration of power immediately to minimize loses.

Preparation of Monthly Engineering Report (Energy input & output, pf, system loss) and Monthly Interruption Report (SAIFI, MAIFI)

Segregation of distribution System Losses (Technical, non - Technical, Administrative) and Reduction of System Loss

Preparation of Feasibility study for Major Capital Projects.

Supervise Substation Construction with the Contractor

Load balancing, distribution transformer management, power factor correction

Preparation of Cost benefit analysis of System Loss reduction program

Preventive maintenance, commissioning and testing of substation power transformer and equipment’s

Load Calculation and fault calculation

Maintenance and Construction of 13.2 kv Transmission line

Load Forecasting

Preparation of Capital Expenditure (CAPEX) in the Technical Department

Preparation of annual Transmission Supply Contract with NAPOCOR / TRANSCO.

PROJECT EVALUATION OFFICER II

DSWD Regional Field Office VIII

Tacloban City, Leyte

January 2004 – June 2004

Scope of Work :

Conduct Consultative services to LGU’s, NGO’S and PO’s on livelihood program and makes recommendation of strategies to improve program implementation

Conduct Small business management and SEA-K training

Assess and Evaluate proposal submitted by individuals / association to determine the viability and feasibility of the projects

Provide technical assistance and Conduct project evaluation.

Conduct environmental scanning to provide shopping list for LGU’s, NGO’s, PO’s and other livelihood program for liable and feasible projects.

CADET ENGINEER

Paradyne Construction

Culianan Highway, Zamboanga City

August 2002 – JANUARY 2004

Scope of Work :

Substation Construction/ Design

LINE MAN / INSTALLER

JCE Builders Incorporated (BAYAN TEL.)

JANUARY 2001-DEC 2001

Scope of Work

Installation of Telephone line (DP’s and OPAC)

PERSONAL DATA

Name : Reze G. Arroyo Jr.

Age : 34

Civil Status : Married

Wife : Shiela P. Arroyo

Occupation : Physician (Geriatric Medicine Changi Gen. Hospt.)

Daughter : Sofia Lexi Arroyo

Father’s Name : Reze B. Arroyo Sr.

Mother’s Name : Fedilina Gabon Arroyo

Home Address : Block 856 St. 82 Tampines Singapore

Cell # : +65-83858231

SAFETY TRAININGs:

CONFINE SPACE SAFETY ASSESSOR

Absolute Kinetics Pte. Ltd

64 Hillview Terrace, Singapore 669277

29/11/2010

EXXONMOBIL LEADERSHIP IN SAFETY WORKSHOP

Singapore Parallel Train (SPT) Olefins

Recovery EXXONMOBILE CHEMICAL ASIA PACIFIC

4/11/2010

PERMIT APPLICANT FOR ENERGIZE SUBSTATION

Singapore Parallel Train (SPT) Olefins Recovery

EXXONMOBILE CHEMICAL ASIA PACIFIC

15/9/2010

LOTTO PROCEDURE (Permit applicant) ECC PROJECT SHELL HOUDINI – Ethylene Cracking Complex ("ECC")

Pulao Ular Island, Singapore

10/07/2009

JOB SAFETY ANALYSIS COURSE

Absolute Kinetics Pte. Ltd

64 Hillview Terrace, Singapore 669277

15/06/2010

SAFETY INSTRUCTION COURSE (MANHOLE) FOR SUPERVISORS

Absolute Kinetics Pte. Ltd

64 Hillview Terrace, Singapore 669277

10/06/2010

CONSTRUCTION SAFETY

Absolute Kinetics Pte. Ltd

64 Hillview Terrace, Singapore 669277

21/05/2009

OIL/PETROCHEMICAL INDUSTRIAL

SAFETY

Absolute Kinetics Pte. Ltd

64 Hillview Terrace, Singapore 669277

22/05/2009

OSHO – Supervisory Specific Training

National Occuptional Safety and Health Center

Ras Laffan Qatar

April 14, 2008

TECHNICAL TRAININGS / SEMINARS :

Performance Management (Key Performance Indicators(KPI) training

Rotary Engineering Limited, #61 Jurong Island Singapore

26/10/2010

Authorized Trained Person (Switching & Enegrization) Conducted: J.M. Pang & Seah (PTE) Ltd for Shell Ethylene Cracker Complex Project Pulao Ular Island, Singapore

01/07/2009

Strategic Planning Workshop

Jastinberg Resort, Brgy. Macopa, Jaro, Leyte

November 16-17, 2006

Orientation Seminar on Submission for Evaluation and Approval of Major Capital Projects for Visayas Electric Cooperative

(DISTRIBUTION UTILITIES) Nov 21- 22, 2005 Cebu business hotel, Cebu City

PLC Basic Level with FESTO Philippines

Festo Didactic Training Center, Mandaue City, Cebu

December 5 to 7, 2006

Automation –Programmable Logic Controller (PLC) Programming (42 hour)

Center for Industrial Technology and Enterprise)

CITE Technical Institute, San Jose, Cebu City.

June 13-30, 2000

Pneumatics and Electropneumatics Control and Design (40 hours)

Center for Industrial Technology and Enterprise (CITE )

CITE Technical Institute, San Jose, Cebu City.

Industrial Electricity (Industrial electrician NC2 level)TESDA RTC Region VIII

Tacloaban City, Leyte

Feb. 25 – March 15, 2001

AUTOCAD 2000

AMA Computer Learning Center

Tacloban City, Leyte

July 4 – August 17, 2001

Refrigeration and Air- Conditioning

TESDA RTC Region VIII

Tacloban City, Leyte

Mrach 19 – April 30, 2002

ACHIEVEMENT/ TEST TAKEN:

Registered Electrical Engineer (REE), 75.85 – passed

Cebu City

Registered Master Electrician (RME), 70.50 – passed

Cebu City

Industrial Electrician (NC2 level)

TESDA, Regional Training Center VIII

Brgy. Abucay Tacloban City

EDUCATIONAL HISTORY:

Bachelor of Science in Electrical Engineering

Eastern Visayas State University (EVSU)

Tacloban City, Leyte, Philippines

1994-1999

Bachelor Science in Computer Science

Divine Word University

Tacloban City, Leyte, Philippines

1993-1994

Secondary

Eastern Visayas State University (EVSU)

Tacloban City, Leyte, Philippines

1989-1993

ORGANIZATIONAL AFFILIATION:Institute of Integrated Electrical Engineers (IIEE)

Cebu chapter

LANGUAGE AND DIALECT :

Cebuano, Hiligaynon, Waray, Tagalog and English

SKILLS:

Microsoft word, Excel, Power Point, Autocad 2000,PLC programming

INTEREST AND RECREATIONAL:

Sports: table tennis, basketball, football, volleyball and sepak takraw

MARITIME TRAININGS :

Ratings Forming Part of Engineering Watch

NATIONAL MARITIME POLYTECHNIC

Cabalawan, Tacloban City, Leyte, Philippines

May 13- May 17, 2002

Marine Refrigeration / Air – Conditioning

NATIONAL MARITIME POLYTECHNIC

Cabalawan, Tacloban City, Leyt, Philippines

May 20- May 24, 2002

BASIC SAFETY TRAINING

Personal Survival Techniques (16 hours)

Fire Prevention and Fire Fighting (24hours)

Elementary First Aid (24hours)

Personal Safety and Social Responsibilities(32 hours)

NATIONAL MARITIME POLYTECHNIC

Nov 6-12, 2001, Tacloban City, Philippines

Proficiency in Survival Craft and Rescue Boats (other than rescue boats)

(32 hours)

NATIONAL MARITIME POLYTECHNIC

Cabalawan, Tacloban City, Leyte, Philippines

April 22- 25, 2002

Proficiency in Crisis Management and Human Behavior Training in Passenger Safety, Cargo Safety and Hull Integrity Training

INTERNATIONAL MARITIME TRAINING FOUNDATION INC.

3/f 1125 M.H. Del Pilar St. Ermita Manila Philippines

Crowd Management, Passenger Safety and Safety Training for Personnel Providing Direct Services to Passengers in Passenger Spaces

INTERNATIONAL MARITIME TRAINING FOUNDATION INC.

3/f 1125 M.H. Del Pilar St. Ermita Manila Philippines

September 18 - 19, 2002

• Seafarers Registration Certificate (SRC),

Registration No. TC00339-02

Rating: Electrician Assistant

Date Issued:May 7, 2002, Philippines

REFERENCES:

MICHAEL CAPATI

Shift Leader Mechanic

CGG AMADEUZ

iyvet8@r.postjobfree.com

Teodulfo M. Troyo

Section Head, Planning and Scheduling Section

National Power Corporation

Leyte Geothermal Power Plant

Brgy. Lim-ao, Kananga, Leyte

+63-917-***-****/iyvet8@r.postjobfree.com

Carlo Ramirez Algallar

Estimating and Proposals Department

Saipem Singapore Pte Ltd.

DID: +65 63727662 <iyvet8@r.postjobfree.com>

Santos E. Getalado

General Manager

Leyte III Electric Cooperative Inc.

Tunga, Leyte

+63-917-*******/ iyvet8@r.postjobfree.com

I hereby certify the correctness of the above information

REZE G. ARROYO JR.