Post Job Free

Resume

Sign in

Supervisor

Location:
Singapore
Posted:
April 21, 2012

Contact this candidate

Resume:

Work Experience:

Company: PETROFAC SOUTH EAST ASIA PTE LTD.

( Under Contract to Oilfield Workforce International Pte. Ltd. )

Project: FPSO Berantai ( East Fortune )

Address: Keppel Shipyard ( Tuas )

Position: Electrical Commissioning Technician

Duration: March 16, 2012 - Present

Company: EMAS CONSTRUCTION OFFSHORE AND PRODUCTION

( Under Contract to Tecnomar and Associates Pte. Ltd. )

Project: FPSO Lewek Emas

Address: Keppel Shipyard ( Benoi )

Position: Electrical Commissioning Technician

Duration: February 14, 2011 - July 03, 2011

Company: MAERSK

( Under Contract to Wartsila Singapore Pte. Ltd. )

Project: FPSO Maersk Peregrino

Address: Keppel Shipyard ( Tuas )

Position: E & I Technician

Duration: May 14, 2010 - November 14, 2010

Company: TANKER PACIFIC OFFSHORE TERMINAL

( Under Contract to Wartsila Singapore Pte. Ltd. )

Project: FPSO Montara Venture

Address: Jurong Shipyard ( Jalan Samulun )

Position: E & I Technician

Duration: March 16, 2009 - November 06, 2009

Company: CONOCO PHILLIPS CHINA, INC.

( Under Contract to Brunel International South East Asia Pte. Ltd. )

Project: FPSO Bohai Phase II

Address: Sembawang Shipyard

Position: Electrical Commissioning Technician

Duration: March 18, 2008 - December 20, 2008

Duties and Responsibilities:

Pre-Comm/Commissioning of ( Power Generation);

Powering up/Energized 6.6KV/440V Switchboard, Transformer and 6.6KV Steam Turbine Generator( Nishishiba / Shinko, Japan – [2units] 9.2MW & [1unit] 3MW ), includes Load Test monitoring and Operate/Start-Up 505 Turbine Contol Panel ( TCP ) during Pre-Comm/Commissioning and Load Testing. Performs function check and troubleshoot power and control circuit. Power and control cable loop check and IR test, cable termination to the Switchboard, Distribution Board, Field JB, Field devices, Motors and Equipment.

Performs ( Carry Over Work ) such as Installation of Instrument Devices, cable trays and support, junction box, switches, outlet, lighting fixtures and Heat tracing. Cable loop check, IR test, troubleshooting and termination in Switchboard, Marshalling Cabinet, VMS & PMS panel and in Field JB for both Electrical & Instrument as well as necessary inspection for all device location and elevation as per Fire Zone Layout, Instrument Layout and Hook-up drawings.

Downstream Pre-Comm/Commissioning; Performs function check and

troubleshoot power and control circuit includes energization of

Switchboards, Transformers 6.3KV/400V/230V, HV/LV Compressors and

Motors prior for the completion of work scope. Power and control

cable loop check and IR test, cable termination to the Switchboard,

Distribution Board, Field JB, Field devices, Motors and Equipment.

Preparation of discipline punch list for system and sub-systems.

Completion of discipline PC and Commissioning works for system and sub-systems in line with project priorities.

Maintain Commissioning Discipline documentation and update as-built drawings regarding the actual revision and changes at the field.

Prepares MC & PC ITR’s including compilation of all necessary reports as when required.

Responsible for control and security of discipline Commissioning test equipment and consumables.

Provide discipline vendor assistance as necessary.

Responsible for execution for relevant discipline work scope detailed with the CTP’s ( Commissioning Test Procedure ).

Promoting project HSE objectives.

Check, verify and perform remaining jobs as per S.I. ( Site Instruction ) prior for the project completion.

Company SAUDI ARABIAN OIL COMPANY ( SAUDI ARAMCO )

( Under Contract to Mohammed Qumaish Est. )

Projects: Replace & Relocate Existing SwitchRacks @ North Terminal,

Installation of the Fire Detection System @ Refinery &

Replacement of G&W SF6 Switchgear @ South Terminal

Address: Po. Box 5, Rahima 31941, Ras Tanura, Saudi Arabia

Position: Electrical Engineer / Supervisor

Duration: June 25, 2005 - June 30, 2007

Duties and Responsibilities:

Prepare daily work schedule , permits, material take-off and other engineering works prior to start of construction activities.

Attend job explanation, site visit, occular inspection and pre-bidding conference requested by Saudi Aramco engineers subject for quotation.

Attend weekly meeting with Saudi Aramco engineers to discuss the accomplishment, request and suggestion prior to the project.

Update as-built drawing regarding the actual revision and changes of all electrical installation work.

Project supervision, material control and workers motivation are also executed.

Conduct daily safety toolbox meeting and walk thru inspection.

In charge to supervise and monitor instrumentation works such as installation and termination activities on MOV’S (Motor Operated Valve) Field Cabinet, Switchrack panels, Level Transmitter, Pressure Transmitter, Temperature Transmitters and in Marshalling cabinet including DCS at PIB Room.

Supervise and monitor termination activities on 13.8KV SF6 Gas Insulated Switchgear including splicing activities.

Conduct Testing and Commissioning of Switchgears, Switchracks, Motor Control Centers and Fire Detection System witness by Saudi Aramco engineers.

Conduct Testing and Commissioning for 13.8KV SF6 Gas Insulated Switchgear (SIEMENS) 5units located at RT Terminal South witness by Saudi Aramco Engineers and PDD.

Conduct a HI-POT 13.8KV DCV test on the new cable as well as on Switchgear itself prior to energization.

Company: UNITED COCONUT CHEMICALS, INC.

SAKAMOTO ORIENT CHEMICALS CORP.

STEPAN PHILS., INC.

( Under Contract to Beezy Seven, Inc. )

Project: Electrical Projects / Works

Address: CAIP Cmpound, Bauan, Batangas, Phils.

Position: Electrical Engineer / Supervisor

Duration: November 15, 2004 - June 15, 2005

January 02, 2004 - May 15, 2004

Company: UNITED COCONUT CHEMICALS, INC.

Address: CAIP Cmpound, Bauan, Batangas, Phils.

Position: Purchasing Staff / Expediter

Duration: May 20, 2004 - November 5, 2004

Company: MONTE CARLO RESORT HOTEL

Project: Construction of Three Storey Hotel Building

Address: San Jose, Mabini, Batangas, Phils.

Position: Electrical Engineer / Supervisor

Duration: May 02, 2003 - December 18, 2003

Company: STEPAN PHILS., INC.

( Under Contract to MAJ Construction & General Services, Inc. )

Project: Electrical Projects / Works

Address: CAIP Cmpound, Bauan, Batangas, Phils.

Position: Field Engineer (Electrical)

Duration: April 15, 2002 - April 15, 2003

Duties and Responsibilities:

Purchasing / Tendering works such as canvassing of prices and sourcing of suppliers both local and Manila, for all project materials, tools / equipment and consumables needed for preparation of quotation before the issuance of the MWO/PO from clients.

Attend occular inspections or pre-bidding conferences requested by clients and do the measurements needed for the possible project subject for quotation.

Prepare papers works such as printed materials needed for marketing and client tendering. (i.e. Fabrication Procedures, QA/QC Procedures, Company Profile, etc.)

Supervision on field and monitor daily project schedule and activities.

Monitor daily project materials, tools and equipment and consumables consumed or to be consumed for the project using the prescribe forms and prepare or do constant logging daily.

Analyzed possible project problems and condition encountered before equipment need, materials and consumables needs, and problems involving worker’s skill and work attitude.

Conduct safety toolbox meeting.

Prepares work schedule, equipment and material take-off, procurement prior to start of construction activities.

Prepares necessary documentation needed for the project acceptance and turn- over.

In SOCC, Supervise fabrication and installation of electrical conduit and support at PG Plant.

In-charge in PM Lighting activities in SOCC in different areas like in the Warehouse, Production, RG plant, Refinery, Admin and Laboratory.

SEMINARS ATTENDED:

Shipyard Safety Instruction Course

Ministry of Manpower Accredited Training Provider

NTUC Workplace Safety and Health Training Centre

NTUC Learning Hub

10 Anson Road, #06-18, International Plaza

Singapore 079903

Expiration Date: May 12, 2012

Substation Engineering

AVR Golden Gate Colleges – February 9, 2001

Micro Digital Motor Controller

Double Ended System Protection

Inspection of Industrial & Commercial Installation

Energy Saving Management On Lighting System

Rizal Technological University – February 2, 2001

Simplified Method of Fault Calculation

Illumination

Power Quality Analyst and Solution

Rizal Technological University - February 1, 2001

GOVERNMENT EXAMS PASSED:

PROFESSIONAL REGULATIONS COMMISSIONS

Licensure Exam for Registered Electrical Engineer (REE)

License Number: 30621

Examination Date / Location: Sept. 2002 / Manila, Philippines

PERSONAL DATA:

Name Jay Dimaculangan Maramot Date of Birth November 02, 1979

Age 32

Sex Male

Civil Status Married

Citizenship Filipino

Passport No. XX5187173

Fin No. G6011702R

EDUCATION :

Degree / College Level

BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING

Golden Gate Colleges

P. Prieto St., Batangas City, Philippines

Graduated March 23, 2002

Secondary Level

Sta. Teresa College

Bauan, Batangas

Graduated March 24, 1996

Primary Level

Sta. Maria - San Pedro Elementary School

San Pedro, Bauan, Batangas

Graduated March 28, 1992



Contact this candidate