Post Job Free

Resume

Sign in

Electrical Project

Location:
ACT, 2905, Australia
Posted:
July 20, 2012

Contact this candidate

Resume:

Personal Information

Address: *** ********* ***, ******** ******, ACT

M: 042*-***-***

E: h2287q@r.postjobfree.com

Qualifications

**** ***** ****** ******* ***********

**** *** **********

2009 Clipsal C-bus basic Programmer

2008 Certificate III Electro technology (A grade Electrician)

2008 Certificate III Telecommunications

2004 Certificate III Optical Fibre

Education

Year 12 St Edmunds College

Core Competencies

• Reading, creating and interpreting architectural drawings including but not limited to line and wiring diagrams, lighting, power and communications plans and layouts

• Good communication with clients and builders to understand and deliver on requirements

• Effective training and mentoring of junior employees and supervision of staff

• Project management, (single and multiple projects) delivering projects, on time, within budget and to specification

• Understanding of electrical system installation methods, fault finding and rectification

• IT skills include but not limited to, Microsoft word, Microsoft Excel, AutoCAD 2010, and various lighting control programming languages

• Design of light and power control systems

• Purchasing practices

Project Experience

Childers Square (Complete Technology Integration)

Challenge: Program base building lighting control system of an eight story building to be energy efficient.

I was originally employed to program the base building lighting control system of this eight story building. The building was comprised of two basements, five tenanted floors and a plant room floor. The project quickly spiralled to more than commissioning a lighting control system. Childers Square was required to be energy efficient so the use of motion sensors, timers and lux sensors were implemented. Due to the basements being incorrectly wired a work around was required to achieve the correct operation of the lighting, this required that I research new products and create non-standard programs within the lighting control systems.

When tenants started moving in, I was required to select the appropriate equipment, explain to the electricians how to install the equipment, and time manage between projects to ensure they were completed in a timely and cost effective manner, and to design specification. Once these jobs where complete, I was required to explain how the lighting control systems operated to the client.

Due to key office staff leaving in the middle of the project, I was required to manage all the necessary works. This included:

• Design - liaising with consultants and engineers to design Greenstar and NABERS compliant lighting systems

• Cost management - estimating and quoting costs for remaining fit outs, researching and purchasing equipment

• Project management - effectively managing time in the office and coordinating multiple activities on site, including communicating with electricians, builders, consultancies, engineers, and end clients.

Achievement: The project was delivered on time, on budget and to design specifications

Department of Housing and Community Services(Phase 4 Electrical and Data)

Challenge: Complete electrical and data fitout and lighting upgrade (outside business hours).

The Department of Housing and Community Services (DHCS) employed Phase 4 Electrical and Data to; complete the electrical and data aspects of their ground floor office fit out in conjunction with a lighting upgrade to level one (to be completed after hours).

I was employed as the leading hand to complete the job. Responsible for the day to day management of running a productive team of around five tradespeople including:

• Design and construction input

• The allocation of work and monitoring of progress against the work plan. managing variations and completing works included as install drawings.

• Planning, managing and training employees

• Purchasing equipment

• Liaising with the builder and client to deliver to design specifications.,

A difficulty of this project was the inclusion of the level one lighting upgrade to be done after hours. I was required to manage staff fatigue and requirements to ensure there were staff split across day and night shifts to complete both tasks timely whilst maximising time/staff efficiencies.

Achievement: The project was delivered on time, on budget and to design specifications

20 Allara St. (Phase 4 Electrical and Data)

Phase 4 Electrical and Data were commissioned by Jones Lang LaSalle to investigate multiple floors lights and lighting control systems for Greenstar and NABERS purposes.

It was my role to;

• Document individual light fittings; record vital information, e.g. wattages and type; record switch zones and circuits on a drawing and record how the switch zone operates e.g. by contactors, time switches (including hours of operation) motion and lux sensors.

• Provide clear documentation so a draftsman could interpret and create as built drawings, and an engineer could do his calculations and interpretations for Greenstar and NABERS.

Achievement: The production of clear documentation to assist draft persons and engineers to complete Greenstar and NABERS ratings

Nick Scali Fyshwick (Reece Henshaw Electrical)

Nick Scali commissioned Reece Henshaw Electrical to install new light fittings. During the installation, management at Nick Scali asked me to find a way to reduce their energy bills and time spent changing globes.

I was required to;

• Research various lamp types and the effect of dimming on halogen lamps.

• Complete a report, on cost effective works to be undertaken reduce energy consumption.

Achievement: Nick Scali used the report and implemented energy saving measures.

Work History

May 2012 – Present

Electrician

Roar Power Electrical

Hume ACT

• Managing multiple housing projects

• Completing Solar projects

• Completing Air-conditioning Instalations

February 2012- April 2012

Sales Representative

Middendorp

Fyshwick, ACT

• Liaising with clients to supply electrical and data solution.

• Estimating and Quoting

November 2010-February 2012

Electrician, Leading hand

Phase 4 Electrical and Data

Mitchell, ACT

• Supervising small teams to complete midsized

• Liaising with clients, builders and engineers to provide data and electrical solutions

• Completing various sized projects to AS3000 and above client expectations

• Reading and interpreting plans and diagrams

• Auditing of multi story structures for Greenstar and NABERS ratings

• Completing jobs to specification

• Training of apprentices

April 2009-Present

Owner/Operator

Reece Henshaw Electrical

Isabella Plains ACT • Estimating and quoting work

• Reporting on pre-existing installations to improve efficiency and safety

• Liaising with clients to provide data and electrical solutions.

• Completing various sized projects to AS3000 and above client expectations

• Programming of building automation for multi-story buildings and houses

• Fault finding integration systems both mechanical and programming

March 2009-November 2010

Integration specialist

Complete Technology Integrations

Tennant St. Fyshwick

• Programming of building automation for multi-story buildings and houses.

• Fault finding integration systems both mechanical and programming

• Managing of multiple projects to ensure there speedy and accurate completion

• Liaising with clients, builders, and engineers to provide energy efficient and user friendly electrical control system

• Reading and interpreting plans and diagrams

• Completing work in accordance with specifications

July 2005-February 2009

Electrician

Heyday Group

Gladstone St Fyshwick

• Training of apprentices

• Running small teams to complete small projects on large construction sites

January 2004-June2005

Apprentice Electrician

Ecowise Services

Tennant St. Fyshwick

• Apprentice electrician

• Installation of transact network

• Maintaining traffic light systems

Referees

Provided on request



Contact this candidate