Post Job Free

Resume

Sign in

Construction Project Manager/Engineer

Location:
Chicago, IL, 60614
Salary:
60000
Posted:
August 30, 2010

Contact this candidate

Resume:

Carline Macias

**** ** **** ******, **** #***

Miami, FL 33178

Mobile: +1-305-***-****

Email: fr4ta2@r.postjobfree.com

Experience I am a professional design engineer with over 13 years of engineering experience in roadway and drainage design. My previous engineering experiences have involved preparing all final roadway plans including: compiling and analyzing comprehensive drainage reports; drafting profiles and cross-sections of all drainage systems; evaluation and design of all water systems.

Professional History

Project Engineer, Drainage Design

RJ Behar and Associates – Miami, FL December 2009- August 2010

NW 7th/9th Connector Project – Broward County, FL

The NW 7TH/9th Connector Project will be an extension in total length of 1.44 miles and will consist of four lanes with median, bicycles lanes, and curb & gutter drainage.

• Actively worked as a member of the drainage team; responsible for the drainage master plan update for the entire connector project, and preparation of all drainage plans.

• Responsible for the design of the storm water system which includes the water quantity detention requirement of the SFWM District; utilized the Advanced Interconnected Channel and Ponds Routing (ICPR) storm water modeling system and ASAD v3 drainage design program to model the complete system.

I-595 Final Design – Fort Lauderdale, FL

This project consisted of the construction of three general use lanes in each direction for the mainline of I-595, the construction of three reversible lanes in the center of the corridor, and upgrades to S.R. 84.

• Actively worked as a member of the drainage team, responsible for the drainage master plan update for the entire project.

• Responsible for the preparation of all the drainage plans, which were divided in 8 zones

• Collected and inputted the basin data for the preparation of a model using the Advanced Interconnected Channel and Ponds Routing (ICPR) Storm water Modeling System and ASAD drainage design program.

Project Engineer, Drainage and Roadway Design

Jacobs – Miami, FL May 2008 – December 2009

Port of Miami Tunnel - Miami, FL

• Actively worked with the drainage team on the design of the drainage system; prepared all drainage plans for the permit process

• Collected and inputted the basin data for the preparation of a model using the Advanced Interconnected Channel and Ponds Routing (ICPR) Storm water Modeling System

Boca Toll Plaza - Fort Lauderdale, FL

• Actively worked with the drainage team on the design of the drainage system of the parking lot; acquired all research data for the drainage system analysis

• Developed the design plan layout for signing and pavement markings

• Worked with the roadway team drafting and compiling all roadway plans, including plan-profile, X-sectional analysis, and superelevation for the roadway expansion.

• Design vertical and horizontal alignment .

MDX Project, S.R. 924 - Miami, FL

• Actively worked with the drainage team on the design of the drainage system for roadway reconstruction and expansion, including drainage maps and drainage structures

• Worked with the roadway team drafting and compiling all roadway plans, including plan-profile, X-section, superelevation and the vertical and horizontal alignment.

• Led the coordination with the clients about deadlines, project milestones, and schedule timeline for the project; prepared all cost estimates of the project.

Additional Projects:

US-1 Jewfish Creek - Miami, FL

Open Road Toll (ORT) at Homestead and Bird Road Toll Plaza - Miami, FL

SW-328 St (Canal Drive) from SW 162nd Avenue to SW 152nd Avenue - Miami, FL

Project Engineer, Roadway Design

Edwards & Kelcey – Miami, FL November 2006 - May 2008

Port of Miami Tunnel - Miami, FL

• Worked on the preparation of all roadway plans for the proposal and exhibits involving the installation of concrete drainage tubes from Marc Arthur Island to Doge Island.

• Led the coordination with the clients about deadlines, project milestones, and schedule timeline for the project

SR 823/NW 57Avenue Roadway Expansion - Miami, FL

Project Engineer, Drainage and Roadway Design

Gannett Fleming – Miami, Florida January 2005 – November 2006

NW 74th Street Extension Project Development and Environmental Study - Miami, FL

The project consisted of the preliminary design efforts for improvements on NW 74th Street from Homestead Extension of Florida’s Turnpike (HEFT) to S.R. 826 and NW 58TH Street from the (HEFT) to S.R. 826.

• Worked with the drainage team on the preparation of all drainage plans

• Acquired all data and prepared design model utilizing the ICPR storm water modeling system for the drainage design system

• Conducted traffic study utilizing Synchro and Syms programs.

• Preparing all cost estimates of the project.

• Coordinate with all clients about datelines, meeting and schedule for the project

Additional Projects:

S.R. 836 Extension from NW 107th Avenue to NW 137th Avenue - Miami, FL

S.R. 823 / NW 57 Avenues Roadway Expansion - Miami, FL

NW 74th Street Interchange at Florida’s Turnpike - Miami, FL

S.R. 874 Ramp Reconstruction and New Connection - Miami, FL

Additional Work Experiences

• Tilteco Engineers, Inc. (Jun 2004 - Jan 2005) – AutoCAD Drafter, Structural Plans

• GTS, Inc. (Feb 2000 - Mar 2004) – AutoCAD Drafter, Structural Plans

• OMNI Corp. (Jan 1999 - Nov 1999) – AutoCAD Drafter, Structural Plans

• Havana International Airport (Jan 1996 - Sept 1998) – Structural Engineer

Education

Bachelor of Science in Civil Engineering, 1995

Instituto Politécnico José Antonio Echeverri, Havana, Cuba

Skills and Achievements

• AutoCAD, Microstation, V-7, V-8, Geopak, ICPR, Syncro, Syms

• Microsoft Office – Microsoft Word, Excel, and PowerPoint

• Fluent in English and Spanish

• Conversational in Italian

References Available Upon Request



Contact this candidate