Post Job Free

Resume

Sign in

Application For The Post: Operation Superivisor,Site Incharge,Shift I

Location:
CHENNAI, TN, 600082, India
Salary:
above 100000 INDIAN RUPEES
Posted:
January 12, 2012

Contact this candidate

Resume:

CURRUCULAM VITAE

Application for the Post: OPERATION SUPERIVISOR,SITE INCHARGE,SHIFT INCHARGE.

RIAZ AHMED

Email id; fq8fbk@r.postjobfree.com (INDIA) phone -0091-9840406515.

Career Objective:

Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people, which will help me to explore myself fully and realize my potential. Willing to work as a key player in challenging & creative environment.

Education Qualification:

i) Diploma in PETROCHEMICAL ENGINEERING, (Completed in 2002- 2005).

Attestated with HRD IN INDIA & ( UAE /OMAN/QATAR) EMBASSY IN INDIA.

ii) Diploma in INTERNATIONAL SAFETY MANAGEMENT. (Completed in 2005- 2006).

iii) AUTOCAD (Completed in Nov 2005) / Knowledge of Operating Computer Basics.

iv) X th std (Completed in mar 2002).

INDUSTRIAL SAFETY TRAINING:

Completed orientation FIRE EXTINGUISHER AND SAFETY INDUCTION TRAINING PROGRAM conducted by QATAR PETROLEUM.

Completed basic orientation SAFETY INDUCTION conducted by SHELL PEARLGTL State of Qatar.

Completed basic safety training programs conducted by CHIYODA TECHNIP JOINT VENTURE (CTJV), State of QATAR as follows below,

• INDUCTION IN INDUSTRAIL SAFTY / AUTHORIZED GAS TESTER / CONFINED SPACE / RESTRICTED AREA ENTRY / FRIST AID/FIRE FIGHTING.

POSITIONS HELD & DURATION:

SHIFT INCHARGE : NITCO client of QATAR PETROLEUM (which deals with

LARGEST PETROCHEMAICAL COMPANYS, RAS LAFFAN

INDUSTRIAL CITY IN QATAR.) from 23 /11/ 2007 to 23/11/2011.

SHIFT OPERATOR : MURAGAPPA GROUP client TI CYCLE OF INDIA( Zero Discharge System (STP,ETP, UF, Drinking water plant and RO Plants) from 15 /06/ 2006 to 20 /11/ 2007.

SHIFT OPERATOR : MEMBRANE TECHNOLOGIES LTD client (CPCL) CHENNAI PETROLEUM CORPORATION LIMITED (which deals with PETROCHEMAICAL COMPANYS), MEMBRANE TECHNOLOGIES LTD Chennai, INDIA, from 05 /06 /2005 to 10 /06/ 2006.

IN PLANT TRAINEE : (CPCL) CHENNAI PETROLEUM CORPORATION LIMITED in (Manufacture Department) REFINERY-3 CHENNAI, INDIA, from 29/10/2004 to 30/11/2004.

Professional Experience: (7 Years - Aboard Experience 4 years & INDIA Experience 3 years)

7 years in operations of Waste water treatment plants IN PETROCHEMAICAL INDUSTRIALS & COMPANYS (WTP/WWTP/STP/ ETP/ RO PLANT/UF PLANT /PILOT RO PLANT & DRINKING WATER PLANTS).

Contd….

ABROAD EXPERIENCE (4 years)

SHIFT INCHARGE in NITCO under client of QATAR PETROLEUM with partnership of AL JABOUR in NITCO (New International Company) an Italian based Company carry out Services to Waste water treatment plants and its utilizes, It operates and maintains 9 waste water treatment plants in with more than 250 employees.

Key Experience:

Operation of waste water treatment plants WTP/WWTP/STP/ ETP/ RO PLANT/UF PLANT/IRRIGATION PUMPING STATION /PILOT RO PLANT & DRINKING WATER PLANTS.

Experience in O & M (operational and maintenance) of WTP (water treatment plant ) & waste water treatment plants, Knowledge of handling the DM plant.

Experience in SCADA/DCS SYSTEM/HMI SYSTEM OPERATING,

Experience in LAB analysis,

Experience in INDUSTRIAL SAFTY,

Experience in Operating Computer applications for office work,

PROCESS OUTLOOK:

Preliminary treatment : by drum & bar screen, screw compactor, odor control system,

Primary treatment : by equalization tank,

Secondary treatment : by extended aeration – by air diffuser, settling tank, primary clarifier

Tertiary treatment : by filtration, chlorination (By UV, sodium/ calcium hypochlorite/secondary

clarification/lime treatment),

Reverse-osmosis unit : by Cartridge & membrane filtration, de-chlorination

Sludge management : by filter press/ drying bed /solar pond system/ aerobic digester/Thickener &

Centrifuge (dewatering).

RESPONSIBILITES & HANDLING OF OPERATION / MAINTENANCE /LAB WORK/ CHEMICAL CLEANING FOR (RO) REVERSE OSMOSIS/ ULTRA FILTERATION (UF):

Involved in day to day plant monitoring, Co-ordinate plant maintenance job, data logging and operation activities through PLC checking of temperature, pressure, levels, flow rate and any plant abnormal note down faults different kinds of break downs coordinating with engineer’

Attaining QATAR PETROLEUM meeting, QATAR PETROLEUM safety meeting, coordinating with all engineers, QA/QC, conducting safety tool box to operators and helpers.

Managing the operation & maintenances team of around 250 staffs includes chemist, technician (mech, elect, inst etc), operators, helpers and monitoring site for efficiency of treatment process.

Ensure that the consistently produce an effluent of quality equal to or better than it is designed produce.

See that all detail is performing promptly and efficiently. This is best accomplished by establishing a routine schedule of operation; keep proper record of operation and maintenance.

Systematically monitor and record different process parameter including chemical consumption.

Sludge treatment well versed knowledge in all type of DECANTER CENTRIFUGE, capacity of 1m3 to 20m3/hr (ALFA LAVAL,ANDRITZ,GEA WESTFALIA).

Reporting directly to project manager for day to day activities.

Co-ordinate with qa/qc eng, mech engg, elects engg & inst engg.

Conducting tools box task & operational training program.

Prepares shift Rota, time sheet (attendance), plant log sheet, vocation leave & compensatory leave schedule for operation dept.

Prepares and maintains Weekly, Monthly, Yearly chemical consumption, flow data & lab report.

Arranging transportation for shift.

Prepare snag list while plant taking during hand over period.

Record the flow rate in all areas & monitoring the level of all storage tanks.

Contd….

Checking and distribution of treated influent for irrigation & tanker loading of treated influent for irrigation.

Co-ordinate plant operation through SCADA system as well as field work in the plant.

Performing of all parameters, chemicals and dosing adjustment.

Operation knowledge about Decanter machine.

Experience in water treatment, waste water treatment, Reverse Osmosis.

Process knowledge in water treatment plant like activated sludge process, sequence bioreactors, moving bed bioreactor.

Experienced in physical and chemical treatments, biological treatment, sedimentation system, filtration systems, and disinfection system and distribution system.

Through experience in filtration techniques such as pressure and rapid sand filter, micro filtration, ultra filtration and experienced in washing of the above mentioned systems.

Experienced in disinfection systems, such as chlorination, ultra violet treatment system.

Experience in thickener, aerobic, filters press, and drying beds.

Filtration equipment handling such as Pressure sand filter, Rapid sand filter, Up flow filter, Activated carbon filter, Multimedia filter and Iron removal.

Performing laboratory testing such as PH, CT, TDS,DO, TSS, COD, MLSS, RAS MLSS, SV

(Sludge volume), SVI (sludge volume index), Chlorine.

Maintain PH in all areas by using chemicals like lime & HCL.

Maintain the chemical dosing for lime, dil HCL, SMBS, Antiscalant.

Flush RO & UF membranes with SBS, HCl& NaOH.

Doing SDI (silt density index) test.

Shock dose RO & UF membranes with SBS twice a day.

Chemical Cleaning of RO & UF membranes weekly once with HCL for low PH & with NaOH for high PH as once through (or) stage wise.

Chemical Cleaning RO & UF membranes monthly once with 2% citric acid & ammonia for low ph, sodium loryl sulphite & NaoH for high ph.

Load & un-load RO & UF membrane and performing probe test if required.

Replacing cartridge/guard filters membranes weekly once if required.

Experience in Maintenances of sand filter & ACF.

Experience performing laboratory testing such as PH, CT, TDS,DO, TSS, COD, MLSS, RAS MLSS, SV (sludge volume), SVI (sludge volume index), Chlorine, & submitted to QA/QC,QUALILTY MANAGER.

OPERATION & MAINTENANCES WORK RESPONSIBILITES:

Operation and Maintenance of Wastewater Lift & Wastewater Transfers station.

Operation and Maintenance of Potable water Network & storage tanks.

Operation and Maintenance of Wastewater Network area.

Preparation of Preventive maintenance Procedures, Plans and check list.

Operation and maintenance of Irrigation water system

Knowledge in Quality control inspection of major components, joint inspection of critical components / equipments

Inspection of the new materials

Diagnose the source of daily problems and resolve it

Technical evaluation of new materials.

Preparation of job accomplishment and daily report.

Preparation and co ordination of weekly planning and scheduling

Co ordination with other departments/parties to implement the safely quality job within project milestone.

Checking and executing the daily routine Generated preventive maintenance and corrective maintenance activity for the Mechanical, Electrical and Instrument section.

Operation and Maintenance of Wastewater Treatment Plant of capacity.

Preparation of Preventive maintenance Procedures, Plans and check list.

Contd….

Operation and maintenance of Irrigation water system.

Arranging the By-pass for pump stations & Lift Stations, without affecting the normal conditions of the Network.

Isolation of Electrical and Mechanical equipments for Preventive and Corrective Maintenance jobs.

Coordinating with the Maintenance crew, in resolving the operation bottle necks.

Taking critical decisions regarding the stoppage duration of pump stat and lift stations.

Interacting with Reliability Engineering team for the close monitoring of the Mechanical Equipments.

Making proper planning for attending pipe breaks in the network, by providing suitable isolation, arranging Tankers and Sykes pumps etc.

Updating the operators regarding the operational routines and non-operational requirements.

Drafting the Emergency preparation plans to face critical situations, that may arise in the operation.

Insisting Safety in the work and creating the awareness among the operators.

Taking initiatives to comply with the Environmental Regulations in handling the Chemicals.

Preparing the Operational Performance Reports for the higher Management.

Knowledge in Authorized Permit Issuer (API) and Authorized Gas Tester (AGT) for Waste water systems.

PLANT DETAILS:

SL. NO Plant Name Process Type units Design Capacity (each unit) m3/day Operating Capacity (each unit) m3/day

(actual average flows) Location

1 QGX – 2 (CTJV) Activated sludge process – air diffuser 4 1600*4=6400m3/day 4500m3/day Ras laffan industrial city-QATAR

2 Laffan refinery – Daewoo / Al jabour Activated sludge process – air diffuser 1 1200*1=1200m3/day 1000m3/day Ras laffan industrial city- QATAR

3 QGX – 3 & 4 (CTJV) Activated sludge process – air diffuser 3 1600*3=4800m3/day 4200m3/day Ras laffan industrial city- QATAR

4 QATAR GAS 5 & 6 Activated sludge process – air diffuser 3 1600*3=4800m3/day 4600m3/day Ras laffan industrial city - QATAR

5 RGX (CTJV) Activated sludge process – air diffuser 3 1600*3=4800m3/day 4200m3/day Ras laffan industrial city - QATAR

6 FLUOR Activated sludge process – air diffuser 1 2200*1=2200m3/day 2000m3/day Ras laffan industrial city - QATAR

7 DODSAL Moving bed bio reactor& UF/ (RO) Reverse Osmosis PLANT 1 2200*1=2200m3/day 1900m3/day Ras laffan industrial city - QATAR

8 SHELL (KENTZ) Activated sludge process – air diffuser & UF/ (RO) Reverse Osmosis PLANT 5 2464*5=12320m3/day 12000m3/day Ras laffan industrial city - QATAR

9 AL KHALEEJ – AKG2 (CTJV) Activated sludge process – air diffuser 2 2800*2=5600m3/day 5000m3/day Ras laffan industrial city-QATAR

10 MURAGAPPA GROUP Primary treatment/ Secondary treatment/ /Tertiary treatment/UF/Reverse-osmosis unit/Sludge management 2 300*1=300 m3/day 250 m3/day CHENNAI-INDIA

11 CPCL CHENNAI PETROLEUM CORPORATION LIMITED Primary treatment/ Secondary treatment/ /Tertiary treatment/UF/Reverse-osmosis unit/Sludge management 4 500*4=2000m3/day 1600m3/day CHENNAI-INDIA

Contd….

PERSONAL DETAILS

Date of Birth : 03-01-1984.

Blood group : O+ (positive)

Father’s Name : ABDUL JALEEL. Nationality : INDIAN.

Religion : ISLAM.

Marital Status : Bachelor.

Permanent Address : No: 6 Gandhi avenue,

Kambar nagar extension,

Jawahar nagar post, Chennai – 600082. Tamil Nadu, (INDIA). Passport No : F8145992.

Passport Issue Date : 14/06/2006. (Applied & Received at Chennai) Passport Expiry Date : 13/06/2016.

Driving License : valid Qatar GCC driving license (License no-284********) Applied & Received at (QATAR) on 01/12/2010,

GCC driving license, Expired on 30/11/2015.

Valid INDIA driving license (License no- TN-05/DL/2623/2005)

Language Known : English, Hindi, Urdu, Tamil & Telugu.

AIM:

1. Achieving product quality to meet cooling tower and boiler feed water specification.

2. To operate the plant as a zero-discharge system.

I hereby declare that the above-furnished details are true to the best of my knowledge and conscience

Place: CHENNAI-INDIA

Yours Truly,

Date:

(RIAZ AHMED)

Thank you for your considering my application



Contact this candidate