ENGINEERED AIR.TUALATIN.OR.(APR **** to Sep ****) ASSEMBLER Assembled air conditioning units for clean rooms,Make walls,installed componennts,operater forklift to load units and unload trucks. M&I WEST,TUALATIN,OR,(AUG 2007 to Mar 2009) MECANICAL ASSEMBLER Make end installs components for clean rooms units and load aluminum grids, plenums and units to trucks. HUNTAIR,TUALATIN,OR,(May 1997 to Jun 2007) ASSEMBLER Assembled air conditioning units for clean rooms,placed components inside the unit,worked with mecanical and electrical tool.