Post Job Free

Resume

Sign in

SAP BASIS Administrator

Location:
Kolkata, India
Posted:
August 31, 2010

Contact this candidate

Resume:

Gautam Poddar

Ruchira Residency

Tower – *; Flat – 10/2

***, ********* ******** **** ****

Kalikapur

Kolkata 700 078

West Bengal, India

Phone : +91-033-******** ( Res.)

: +91-983******* (Mobile)

E-mail : fabeur@r.postjobfree.com

Date of Birth: 30th December 1967

Passport No. J3286751

EXPERIENCE SUMMARY

I am a Basis Consultant in SAP with about 11 years and 10 months of SAP R/3 BASIS Consulting experience ( SAP ECC 6.0(SR1 & SR2), 5.0(SR1) R/3 4.7, 4.6C, 4.0B and 3.0F), BI 7.0, BW 3.5, 3.1, 2.1C , Solution Manager 4.0, 3.2, 3.1 OS AIX 5.3, 5.1, HP UNIX 11i, DEC UNIX 4.0F , WINDOWS 2003, 2000, NT 4, Database DB2 V9.1 FP15 / V8 FP12, Oracle 10g, 9.2.0.7, 9.2.0.6, 9.2.0.5, 9.2.0.4, 8.0.5, 8.1.7, MS SQL Server 2005 and 2000) including 6 months BIW 2.1C BASIS (17.11.2003 to 28.04.2004) experience in ITC BIW Project, Kolkata. Now I am working in the Graphite India SAP Upgradation from SAP ECC 5.0 / Oracle 9i / HP UNIX 11.23 to SAP ECC 6.0 EHP4 / Oracle 10g / HP UNIX 11.23 and along with giving SAP BASIS expert support in SAP ECC 6.0 (SR1 / SR2 / SR3) implementation / Roll out / Upgradation / Migration / Re-Organization the Oracle Database/ SAP Archiving (SAP ADK tools) projects and other SAP BASIS Activities like SAP Server Sizing, System Landscape Design etc. for PwC India. I had completed SAP SRM 3.0 Upgradation Project ( SRM 3.0 to SRM 7.0 Ehp1) , Unicode Migration and MDM 7.0 , PI 7.0 , BI 7.0 and LAC 7.0 implementation for BANK MANDIRI, Jakarta, Indonesia ( from 26th January 2010 to 18th August 2010) , SAP BPC NW 7.0 Implementation project for SOCAR, BAKU, Azerbaijan (from 5th October 2009 to 11th November) and I also completed (from 17th November 2004 to 31st January 2005 ) offsite support project of UK GFS Authorization Security ( I was in UK from 31st October 2004 to 16th November 2004). I had also completed USA GRMS ( SAP 4.7 IDES Installation in DEV, QAS, and PRD ) Project from Kolkata ( from 25th September to 25th October 2004). I was working (from 26th November 1999) in SAP 4.0B and 4.6C (from May 2003), DEC UNIX 4.0F and Oracle 8.1.7 along with previous SAP 3.0F, 4.0B, Windows NT 4. Apart from this, I had worked in MFGPRO of FDM (Field Distribution Module) module under UNIX ALFA Server. In this FDM module I had maintained daily sales and office activities. I also have about 12 months experience in FOXPRO Programming and I had worked in C under UNIX platform. Actually I had started my career in Computer field since 1994 February after completing my DCA course. I had worked in Colgate Palmolive India Ltd. (7 months) as a “Computer Trainee” and in Silicon Infotech (One year) as a “Computer Operator cum Programmer”.

Upgradation and Migration:

Gautam has done SAP Upgradation from SAP ECC 5.0 / Oracle 9i / HP UNIX 11.23 to SAP ECC 6.0 EHP4 / Oracle 10g / HP UNIX 11.23 , SAP BW 3.5 to SAP BI 7.1, SAP SRM 3.0 to SRM 7.0 Ehp1 on MSSQL 2005 / Windows 2003 and Unicode Migration, SAP 4.7 to ECC 6.0 (SR2) on Oracle 10g / Windows 2003, SAP 4.7 to ECC 6.0 (SR2) on Oracle 10g / AIX 5.3, SAP 4.7 / Oracle 9i to ECC 6.0 / Oracle 10g on Sun Solaris and SAP 4.0B / Oracle 8.0.5 to 4.6C / Oracle 8.1.7 on True 64 UNIX. He has done SAP Migration from SAP ECC 5.0 / MSSQL 2000 / Windows 2000 to SAP ECC 5.0 / MSSQL 2005 / Windows 2003 and SAP Migration from SAP 4.7 / Oracle 9i / Windows 2003 to SAP 4.7 / Oracle 9i / AIX 5.

Installation :

SAP ECC 6.0 (SR2) / HP Unix V 11.23 / DB2 V 9.1 with Service Guard Clustering environment, SAP ECC 6.0 (SR2) / HP Unix V 11.23 / Oracle 10g with Service Guard Clustering environment ,SAP ECC 6.0 (SR2) / Sun Solaris 10 / Oracle 10g with Two Nodes Clustering Environment, SAP ECC 5.0 / Windows 2003 / MS SQL Server 2005 (MSCS Clustering Environment), EP 7 and BI 7 / Windows 2003 / Oracle 10g / SAP ECC 6.0 (SR1) / AIX 5.3 / DB2 FP 14 with HACMP Clustering environment, SAP ECC 6.0 (SR1) / AIX 5.3 / Oracle 10g with HACMP Clustering environment, SAP ECC 6.0 (SR1) / Windows 2003 / MS SQL Server 2005, SAP ECC 6.0 (SR1) / AIX 5.3 /DB2 V8 FP12, SAP ECC 6.0 (SR1) IDES / Windows 2003 / DB2 V8 FP12, Solution Manager 4.0 / Windows 2003 / DB2 V8 FP12, SAP ECC 6.0 (SR1) / AIX 5.3 / Oracle 10g, ECC 5.0 (SR1) / Windows 2003 / Oracle 9.2.0.7 / Fail Safe 3.3.2 (MSCS Clustering Environment), SAP ECC 5.0 (SR1) / Oracle 9.2.0.6 / HP UNIX 11i , SAP ECC 5.0 (SR1) IDES / Oracle 9.2.0.6 / Windows 2000, SAP BW 3.5 / Oracle 9.2.0.6 / Windows 2003, SAP ECC 5.0 (SR1) IDES / MS SQL 2000 / Windows 2003, SAP Solution manager 3.2 / MS SQL 2000 / Windows 2003, SAP Enterprise Set 1/ Windows 2003 / MS SQL Server 2000 (MSCS Clustering Environment), SAP Enterprise Set 1/ Windows 2003 / MS SQL Server 2000, AIX 5.1 / Oracle 9.2.0.4, Enterprise Set 1 / Oracle 9.2.0.4 / AIX 5.1 , SAP Enterprise Set 2 (kernel 640) / Oracle 9.2.0.5 / HP UNIX 11i., SAP Solution manager 3.2 / Oracle 9.2.0.6 / Windows 2000, SAP BIW IDES 3.5 / Windows 2003 / Oracle 9.2.0.6, SAP 4.0B and 46C / Oracle 8.1.7 / DEC Unix 40F and NT, Solution Manager 3.1 / Oracle 9.0.2 / Windows 2003, SAP Enterprise Set 1 and Set 2 / Oracle 9.2.0.4 / Windows 2000, SAP EBP 4.0 / WIN 2003 / Oracle 9.2.0.4, SAP IDES 4.7 / Windows 2000 / Oracle 9.2.0.4, SAP BIW IDES 3.1 / Windows 2003 / Oracle 9.2.0.4 , SAP IDES 4.7 / Windows 2003 / MS SQL Server 2000.

EDUCATION

• Certification course in FOXPRO 2.6 from LCC, Calcutta in 1995.

• Windows and MS-Office suits of packages from Computer Point, Calcutta in 1995.

• C under UNIX from R.C.C. (Jadavpur), Calcutta in 1994.

• “O” Level from DOEACC (Under Govt. of India) Module ( I,II,IV) in 1994 securing 1st Division.

• DCA Course from The British Institute, Calcutta in 1993, securing 1st Division.

• Bachelor of Science in Physics Honours from Scottish Church College (Calcutta University) in 1989 with 55%.

EMPLOYMENT HISTORY

• PricewaterhouseCoopers : SAP BASIS Consultant , November 2003 to Present

• COMPAQ, India : SAP BASIS Consultant, October 1998 to October 2003.

• Coomar Agency : Computer Support , December 1997 to September 1998

(Coomar Agency is a C & FA of Hidustan Lever Ltd.

( Kwality and Walls Ice-Cream Division)).

• Nobel Network : Computer Programmer cum office computer Operator, October 1996

to November 1997.

SELECTED EXPERIENCE

Project : Graphite India SAP ECC 5.0 / Oracle 9i / HP UNIX 11.23 to SAP ECC 6.0 / Oracle 10g /

HP UNIX 11.23 and BW 3.5 to BI 7.1, Kolkata, India, SAP BASIS Administrator

Employer : PricewaterhouseCoopers, Kolkata, West Bengal, India

Duration : 19th July 2010 to continue

Location : Jakarta, Indonesia

SELECTED EXPERIENCE

Project : BANK Mandiri SAP SRM 3.0 Upgradation to SRM 7.0 Ehp1 with Unicode Conversion

/ PI 7.0 Ehp1/ MDM / LAC / BI 7.0 Ehp1, Jakarata, Indonesia, SAP BASIS

Administrator

Employer : PricewaterhouseCoopers, Kolkata, West Bengal, India

Duration : 26h January 2010 to 18th August 2010

Location : Jakarta, Indonesia

SELECTED EXPERIENCE

Project : MARATHON SAP Upgradation from SAP 4.7 to SAP ECC 6.0 (SR2)

, SAP BASIS Administrator

Employer : PricewaterhouseCoopers, Kolkata, West Bengal, India

Duration : 14th November 2009 to 12th January 2010

Location : Kolkata

SELECTED EXPERIENCE

Project : SOCAR BPC Implementation Projects, BAKU, Azerbaijan

, SAP BASIS Administrator

Employer : PricewaterhouseCoopers, Kolkata, West Bengal, India

Duration : 5th October 2009 to 11th November 2009

Location : Kolkata

SELECTED EXPERIENCE

Project : Tega Industries SAP Upgradation from SAP 4.7 to SAP ECC 6.0 (SR2)

, SAP BASIS Administrator

Employer : PricewaterhouseCoopers, Kolkata, West Bengal, India

Duration : 05h November 2008 to 12th January 2009

Location : Kolkata

SELECTED EXPERIENCE

Project : Hindustan Motors SAP ECC 6.0 (SR2) Implementation

, SAP BASIS Administrator

Employer : PricewaterhouseCoopers, Kolkata, West Bengal, India

Duration : 05h May 2008 to 10th December 2008

Location : Kolkata

SELECTED EXPERIENCE

Project : TATA INTERNATIONAL SAP ECC 5.0 (SR1)

Implementation & Migration, SAP BASIS Consultant

Employer : PricewaterhouseCoopers, Kolkata, West Bengal, India

Duration : 05h January 2008 to 15th April 2008

Location : Kolkata

SELECTED EXPERIENCE

Project : Electrosteel Casting Limited SAP ECC 6.0 (SR2)

Implementation, SAP BASIS Consultant

Employer : PricewaterhouseCoopers, Kolkata, West Bengal, India

Duration : 05h June 2007 to 15th March 2008

Location : Kolkata

SELECTED EXPERIENCE

Project : InfoTech Enterprise Limited SAP ECC 6.0 (SR2)

Implementation, SAP BASIS Consultant

Employer : PricewaterhouseCoopers, Kolkata, West Bengal, India

Duration : 15h September 2007 to 25th January 2008

Location : Hyderabad

SELECTED EXPERIENCE

Project : Lux Hosiery Industries SAP ECC 6.0 (SR1)

Implementation, SAP BASIS Consultant

Employer : PricewaterhouseCoopers, Kolkata, West Bengal, India

Duration : 15th August 2006 to 28th April 2007

Location : Kolkata

Project Overview:

As a part of its overall project plan, Lux Hosiery Industries has formulated an Information Technology road map to support its current Project activities and the future operational phase of the company. LUX Cozi had decided to implement SAP ECC 6.0 (SR1), and has engaged PWC for the assignment. The implementation project consists of MM, SD, PP, FI / CO and HR Payroll. The project has gone live on 28th April 2007.

Roles:

SAP BASIS Consultant. Provide SAP System Landscape, Installation, TMS configuration, Transportation, SAP backup, SAP Patch and Add-on installation, OSS and SAP router configuration, support and solution to customer and professionals in solving SAP BASIS related problems.

System Landscape :

The SAP setup has a three system landscape. The two servers are Production (live), Test & Development, and Quality Assurance in another server.

SAP Version, OS and Database: SAP ECC 6.0 (SR1) / Windows 2003 / MS SQL Server 2005

Other SAP Implementation Projects are mentioned below which I have completed during this Period from August 2006 to 3rd May 2007:

A. Greenply Industries Limited, Delhi

Gone live : 6th April 2007

SAP System : Three System Landscape for SAP ECC (DEV, QAS and PRD)

SAP ECC 6.0 (SR1) Production system has been installed under AIX 5.3 /

DB2 FP 14 with HACMP two Nodes Clustering environments.

SAP Modules : FI/CO, SD, MM and PP

B. Bharat Aluminum (BALCO), Korba, Chattrishgar

Gone live : 3rd April 2007

SAP System : Three System Landscape for SAP ECC (DEV, QAS and PRD)

SAP ECC 6.0 (SR1) Production system has been installed under AIX 5.3 /

Oracle 10g with HACMP two Nodes Clustering environments. Two Disaster

recovery systems for R/3 Production System also configured. One is located

in Mumbai and another is Korba, Chattishgar.

SAP Modules : FI/CO, SD, MM, PP, PM, QM and HR

Other Systems : EP will be using for for ESS and MSS

XI will be using for data loading from Non SAP Systems

BW will be implemented in Second Phase.

Project : Graphite India Ltd. SAP ECC 5.0 (SR1)

Implementation, SAP BASIS Consultant

Employer : PricewaterhouseCoopers, Kolkata, West Bengal, India

Duration : 15th September 2005 to 31st August 2006 ( Phase I )

Location : Kolkata

Project Overview:

As a part of its overall project plan, Graphite India Limited has formulated an Information Technology road map to support its current Project activities and the future operational phase of the company. GIL had decided to implement SAP ECC 5.0 (SR1), and has engaged PWC for the assignment. The first phase of this implementation project consists of MM, SD, PP, QM, PM ,FI / CO and BW ( Only Default Cubes activation for FI, MM and SD) and the second phase of the project consist of SAP BIW (Full Implementation) and APO. The first phase gone live on 17st April 2006 and Second Phase will be started January 2007.

Roles:

SAP BASIS Consultant. Provide SAP System Landscape, Installation, TMS configuration,Transportation, SAP backup, SAP Patch and Add-on installation, OSS and SAP router configuration, support and solution to customer and professionals in solving SAP BASIS related problems.

System Landscape :

The SAP setup has a three system landscape. The three servers are Production (live), Test & Development, and Quality Assurance.

SAP Version , OS and Database : SAP ECC 5.0 (SR1) / HP Unix 11i / Oracle 9.2.0.6



Contact this candidate