Post Job Free

Resume

Sign in

Industrial Electrician Journeyman

Location:
Fort Mc Murray, AB, Canada
Salary:
33 CAD $ per hr
Posted:
December 05, 2011

Contact this candidate

Resume:

GREGORIO A. ALFEREZ JR

Suton, Pangdan, Naga, Cebu , Philippines 6037

Phone # (63-32-489****

Cell phone # (63-091********

cwbw67@r.postjobfree.com

DESIRED POSITION INDUSTRIAL/ BUILDING ELECTRICIAN

PERSONAL DATA

Name : Gregorio A Alferez Jr.

Address : Suton Pangdan Naga Cebu

Nationality : Filipino

Age : 37

Sex : male

Hieght : 5’6”

Weight : 160 Lbs

Date of Birth : Oct. 7, 1972

Place of Birth : Naga, Cebu

Civil Status : Married

Nationality : Filipino

Religion : Roman Catholic

Status : Married

Name of Spouse : Teresa R. Alferez

Name of Father : Gregorio T. Alferez Sr

Name of Mother : Carmelina A. Alferez

Passport Number : QQ0985681

Passport Validity : Sept. 16, 2005

Passport Availability : Sept. 16, 2010

EDUCATION

Refrigeration Aircon Technician/Electrical

Cebu State College of Science and Technology

Cebu City, Philippines 6000

PERSONAL EXPERIENCE

REJA CONSTRUCTION (March 2 to present 2010)

Inayawan Pardo Cebu City

Project name

Uneversal Feed mill

New Ware house and Pilliting

Electrical Foreman

Installation of conduits pipe fabricate of support and welding works

Installation of lighting fixture/ panel board power sockets/control panel

Pull cable of power and control cables cable glanding

Loop checking, meggering test, Termination of power and control

cables, operation test

LEDCORD CONSTRUCTION LIMITED (June 3, 2008 June 30, 2009)

Ledcor Project

Albian Sand Ft Mc Murray AB. Canada

Construction Journeyman Electrician

Job Description

Ø Layout and fabricate of cable tray support, fabricate of cable tray reduce size and offset of cable tray and install.

Ø Terminate of power cable, control cable,Instrument cable

Ø Operate of JLG, Genie, Scissor lift machine

Pull cables through panel and equipment , layout for holes and glanding Loop checking of power and comtrol cables

Termination of instrument/power and control cables

LEDCOR CONSTRUCTION LIMITED (May 13 2006- May 2, 2007)

Long lake Project

PO Box 5647 ft mc Murray AB T9H 3G6 Canada

Construction Journeyman Electrician

Ø Read and interpret drawing circuit diagrams and electrical code

specifications to determine wiring lay outs for new existing installation.

Ø Pull wire through conduits and through holes in floor in walls.

Ø Fabrication and installation of cable tray and supports.

Ø Install brackets and hangers to support Electrical Equipment.

Ø Install, replace and repair of lighting fixtures and Electrical controls,

distribution equipment, such as switches, relays circuit.

Ø Test continuity of circuits using test equipment to ensure compatibility

and safety of system.

Ø Troubleshoot and isolate faults in electrical and electronic systems and remove and replace faulty components.

Ø Observe and follow the safety rules and regulations.

AMCI (Asian Metal construction Incorporated) (August 2006 – April 15 2006)

Inayawan Pardo, Cebu , Philippines 6000

Electrician Foreman

Ø Pull cable from equipment to substation

Ø Terminate of power and control cable, instrument cable

Fabricate of support and brackets and install

Fabricate of cable tray reduce size, offset, bending of conduite pipes RSC, PVC,EMT

Estimate of electrical ,residential structural works based on scoop of works.

AMCI (Asian metal Constrution Incorporated) (Dec. 2, 19926~Oct. 10, 1999)

Inayawan Pardo, Cebu , Philippines 6000

ELECTRICIAN Foreman

Ø Preparation of tools and equipment

Ø Fabrication of cable tray, support and installation

Ø Installation of Electrical , control panel, junction box and local control station.

Ø Cable laying, conduit installation, bending of conduit, install scaffold, install lighting.

Ø Installation of MOV Control Panel, glanding, termination, rewiring of motor control, repair & loop checking, meggering testing and commission

Ø Install a/c unit / trouble shooting and maintain replace of deffictive parts and repair/ Body building

TPC Inc. (Sept. 1995~Nov. 1996)

Congregation of Celestial Garden

Banawa Cebu City

ELECTRICIAN LEADHAND

Ø Installattion and fabrication of cable tray and support.

Ø Check instruments and control equipments & installation.

Ø Check lighting, power supply from switchgear to ATS to MDP Panel Installation.

Ø Follow up crew electrician if work done correctly.

Ø Loop checking and meggering, testing.

Ø Termination and commissioning.

Taehei Dengyo Kaisha LTD. (Sept.1994- August 1995)

Saitama Japan

Electrical/ Iron Work Trainee

Ø Fabrication of air duck, cutting , operate of Schering machine.

Ø Flange layout , fabricate steel ladder assist on how to fabricate and roll plate bend.

Ø Assist electrical panel fabrication and plate bending.

Ø Assist of termination power and control cables for control system , and its dept.

Ø Ensure the observance of safety rules and regulations.

ALLTECH Contractors Inc. (Sept. 1993-Sept. 15 1994)

Industrial Electrician

Ø Installation of cable tray and RSC,EMT Pipes

Ø Termination of HV,LV, Cable.

Ø Responsible of termination and check logic, ladder diagram before sequential test.

Ø Termination and replace of defective parts.

Ø Perform interlocking and testing in preparation of start up commissioning

Ø Ensure the observance of safety rules and regulations.

Ø

EDUCATIONAL ATTAINMENT

NAME OF SCHOOL DATE ATTEND COURSE/DEGREE

ELEMENTARY Cantao- an elem. sch. 1980-86

HIGH SCHOOL Naga prov’l high sch. 1986-90

COLLEGE

VOCATIONAL Cebu State College of Science and Technology

OTHERS Ref. Air Con Tech’n/ Driver Welding

GOVERNMENT EXAM TAKEN (PASSED)

TYPE PLACE TRADE

APPRENTICESHIP AND INDUSTRY TRAINING ALBERTA CANADA ELECT’N JOURNEYMAN

TRAININGS AND SEMINARS

Ø New Trends in Motor Control, New Range of Low Voltage Circuit

Breaker ,Principles & Application of Drives & Softstarters & Effective

Power Monitoring Systems. Lahug, Cebu City (Nov.27, 2003)

Ø Construction Safety Training System ;(CLAC) Edmonton , Alberta ,Canada ; May 15, 2006

Ø Canadian Industrial & Construction Training FALL PROTECTION ; Fort Mc Murray , Alberta , Canada ;June 2, 2006

Ø Canadian Industrial & construction Training AERIAL WORK PLATFORM ; Fort Mc Murray ,, Alberta , Canada; Nov. 15,2006

Ø Canadian Industrial & Construction Training Confined Space Entry/ Confined Space Monitor/ JLG and Ginie Scissor lift equipment

REFERENCES

Brad, Stone Teodosio P. Creus

Electrical Foreman Mechanical Engineer

Ledcor Construction Limited Forest Hill Banawa

Long Lake Project Cebu City Philippines

1-403-***-**** 6000

Allan Muer

Safety Officer

Ledcor Construction Limited

Long Lake Project

Fort Mc Murray Alberta Canada



Contact this candidate