Post Job Free

Resume

Sign in

Manager Engineer

Location:
United States
Posted:
January 28, 2012

Contact this candidate

Resume:

Resume

Name : Hamid

Family name : Golnam

Gender : Male

Date of Birth : April 10 – 1983

Nationality : Iranian

Marriage Status : Married

E-mail : azqzks@r.postjobfree.com

Phone : +98-912*******

Languages: Persian-English

Pass Port No. : L16894275

Objective :

I will be much pleased to work in a globally competitive environment on challenging assignments that shall yield the twin benefits of the job satisfaction and a steady-paced professional growth. My work ethic is founded on a 'what-ever-it-takes' attitude and diligent persistence to ensure all Projects are completely fulfilled to the utmost. Emboldened by such idea I crave the indulgence Of requesting you to kindly consider my candidature in a suitable position in your esteemed company.

Work experience :

Atlas Offshore Co. (Tehran-Iran) Nov 2008 and Continued

• Phase 14 two top deck Engineering and one top deck (deck C) Fabrication

Location : Bandar Abbas

Client : ISOICO

Responsibility : Engineering Manager

Job summary :

Engineering of two top decks for Phase 14 and Pre-fabrication and Fabrication of one Top deck

• HENDIJAN Offshore Complex Development Spools and Risers fabrication and Installation

Location : Persian Gulf – Hendijan Field

Client : ISOICO

Responsibility : Engineering Manager

Job summary :

Fabrication, load out, transportation and installation of Hendijan 12” subsea pipelines’ spools and risers on CHD, WHP07 and WHP08 platforms.

• HENDIJAN Offshore Complex Development WHP 07 & WHP08 Engineering and WHP07 Fabrication of Top deck

Location : Bandar Abbas

Client : ISOICO (MSG)

Responsibility : Engineering Manager

Job summary :

Engineering of two top decks (WHP07 & WHP08) for Hendijan offshore development complex and Pre-fabrication and Fabrication of one Top deck WHP07).

Water depth in this area was 3 and 5 meter

• Structure Fabrication of topside deck phase 16 south pars (SPD16)

Location : Bandar Abbas

Client : ISOICO (MSG)

Responsibility : Engineering Manager

Job summary :

Fabrication of the structures of offshore platform (WHP) relevant to the south pars gas development project phase 16

• HENDIJAN Offshore Complex Development Two 12” subsea pipelines installation

Location : Persian Gulf – Hendijan Field

Client : ISOICO

Responsibility : Engineering Manager

Job summary :

Engineering for two 12” subsea pipelines (WHP07 to CHD & WHP08 to CHD), for Hendijan offshore development complex and pipelaying operation with Hydrotest.

• OFFSHORE HOOK UP and COMMISSIONING WORKS OF DECKS and BRIDGES

Location : Persian Gulf – Abouzar & Bahregansar Field

Client : Gulf Piping Company

Responsibility : Engineering Manager

Job summary :

Preparing Aboozar and Bahregansar Top decks and Bridges by Connecting Piping’s, Electrical and Instrument cables, GRE connections, Riser connection and Main panel installation from old facilities (platforms) to new Platforms.

Cable connections testing and Hydro test the Platforms for Commissioning.

• HENDIJAN Offshore Complex Development WHP 07 & 08 Jackets Load Out, Transportation & Installation

Location : Persian Gulf – Hendijan Field

Client : ISOICO - FARSA

Responsibility : Engineering Manager

Job summary :

Installation of two jackets (07 & 08) in Hendijan field, which is 2 mile away from Bahregansar Field.

Water depth in this area was 3 and 5 meter.

.

• KHARG Island Gas Gathering & NGL Recovery project offshore Installation of Decks, Bridges and Apparatuses

Location : Persian Gulf – Aboozar & Bahregansar Field

Client : Gulf Piping Company

Responsibility : Engineering Manager

Job summary :

Offshore installation of Decks (Float over Method), Shipped loose items and offshore construction management.

Installation of AB-GCP and B-GCP Decks and Bridges.

Preparation and submission of offshore installation manual and procedures.

Offshore construction management for AB-GCP, B-GCP and Deck and Bridge installation.

• Offshore jackets installation & appurtenances in ABOOZAR and BAHREGANSAR fields

Location : Persian Gulf – Aboozar & Bahregansar Field

Client : Gulf Piping Company

Responsibility : Field Engineer & Deputy of Operation Manager

Job summary :

As a part of ongoing development of the Aboozar and Bahregansar Fields, Atlas Offshore has installed three Gas Compression Platforms (GCP’s)

Aboozar Gas Compression Platform (AB-GCP), Aboozar Field

Bahregansar Gas Compression Platform (B-GCP), Bahregasar Field.

Bridge support (BST), Bahregansar Field.

• South pars gas field development – Phase 1, 2" & 8" Piping on SPD1 Platform

Location : Persian Gulf – SPD1 Platform

Client : SPEC

Responsibility : Fabrication and Installation Supervisor

Job summary :

Fabrication & Offshore installation of new 8” and 2” piping on SPD1 platform .

• KHARG Island Gas Gathering and NGL Recovery (26" Shore Pulling)

Location : kharg island, Persian Gulf

Client : Valentine Maritime (Kish) L.L.C.

Responsibility : Engineering Supervisor

Job summary :

Shore pulling preparation & assisting operations including preparation of site and installation of Equipment & assisting during shore pulling operation.

Atlas Offshore Co. (Tehran-Iran) Oct 2003 to Oct 2008 - Part time

• Fabrication, installation and pre-commissioning of 24" riser and tie-in spools

Location : Abouzar offshore complex

Client : Iranian Offshore Oil Company(IOOC)

Responsibility : Field Engineer

Job summary :

Fabrication, installation and pre-commissioning of 24” riser and tie-in spools.

This project covers the following scope of work:

Fabrication of a 24” riser pipe, riser clamps and tie-in spools for new 24” subsea pipeline to Abouzar offshore complex including NDT, anti-corrosion coating, pigging and hydrotest.

Offshore transportation and installation of riser clamps, riser pipe and first piece of spool.

Sub sea meteorology, fabrication and installation of subsea tie-in spool including NDT, anti-corrosion coating, pigging and hydrotest.

Leak test of the installed riser and spools including flooding and pressurization of spool

• 24" Pipeline in KHARG Island

Location : kharg island, Persian Gulf

Client : Iranian offshore Oil company (IOOC)

Responsibility : Project Engineer.

Job summary :

Fabrication and Installation of 2000 m of carbon steel 24” pipeline onshore Kharg island.

• 24" Shore pulling pipeline

Location : kharg island, Persian Gulf

Client : Valentine Maritime (Kish) L.L.C.

Responsibility : Project Engineer.

Job summary :

Shore pulling preparation & assisting operations including preparation of site and installation of Equipment & assisting during shore pulling operation & Trenching that included Constructing a Berm for Excavation access from Land Fall Point to water level which was approx . 70 meter Long

• South Pars Phases 6, 7 & 8 Offshore Project Flooding of 4" MEG Pipeline

Location : Asalooyeh

Client : Statoil Hydro

Responsibility : Project Engineer.

Job summary :

This operation carried out in two phases:

Phase 1

Flooding with treated water while the pipeline is ROV inspected to locate the point of break in the pipeline. Fluorescent dye facilitating locates the leaking point by ROV.

Phase 2

Upon completion of repair of the pipeline, phase 2 started which includes flooding/preservation of the pipeline by chemically treated seawater followed by pressure test of the pipeline to ensure its integrity.

• Pre-Commissioning of 26" Pipeline in kharg Island

Location : kharg island, Persian Gulf

Client : Valentine Maritime (Kish) L.L.C.

Responsibility : Project Engineer

Job summary :

Logestic servises for pigging and Hydrotesting the 26” pipeline in kharge Island

• Interconnection of the new production plant with the existing one

Location : Bahregan, Iran

Client : Iranian Offshore Oil Company (IOOC)

Responsibility : Draftsman

Job summary :

This project covers the following scope of work:

Fabrication/installation of 700 meters 4” carbon steel pipeline.

Design, supply and installation of two vertical centrifugal pumps for sea water

Fabrication/installation of 500 meters underground/ aboveground polyethylene waste water pipeline.

Design, supply and installation of two horizontal centrifugal pumps for fresh water.

Design and execution of storm water disposal system which is partly covered concrete channels and some is concrete pipes.

• Fabrication of tie-in spools

Location: Khoram shahr, Iran

Client : Iranian offshore Engineering and construction company (IOEC)

Responsibility : Draftsman

Job summary :

This project has been fabrication of 53 tie-in spools (71 parts) from 4” to 36” with various lengths up to 45 meter.

Various stages if project included preparation of engineering documents and shop drawings, welding qualifications, fit up and welding pipe joints, NDT, protective coating and hydro testing of spools.

• Miscellaneous lifting jobs in Salman offshore complex & Siri island oil production facilities

Location : Siri Island & Salman Complex

Client : Iranian Offshore Oil Company (IOOC)

Responsibility : Draftsman

Job summary :

Scope of work includes Mobilization of a crane barge (crane capacity 250 ton) and replacing a scrubber vessel on Salman platform as well as removing the damaged loading arms & relocating a control building in Siri island.

Skill & Qualifications:

• PDMS 11.5

• CAESAR II, Ver. 5.00

• AUTO CAD

• MICROSOFT OFFICE

• HAP4.1 (Carrier)

• Theory of Piping

• Design of Piping Systems In Acc. With ASME B31.3 Code

• Basic Piping Supporting

• Piping Stress Analysis

• HVAC Design, Load Estimation and Eq. Selection

Education :

• 2003-2008 Islamic Azad University, Science and Research Branch of Tehran - Iran

• B.S. in Solid Mechanics Engineering

Interests :

• Playing football, Swimming, Reading Magazines, Watching Movie, …

Personal Strengths :

• Good team player and Co-operative with colleagues.

• High level of self-motivation and hardworking.

• Enjoy learning new methods and ideas and putting them in practice.

• Sincere & Goal Oriented.

• Punctual and a good organizer …



Contact this candidate