Post Job Free

Resume

Sign in

Manufacturing Operations:

Location:
Plano, TX, 75025
Posted:
October 22, 2009

Contact this candidate

Resume:

DELAINA RHEA

**** ******* ***** • Plano, Texas 75025

972-***-**** (H) • 214-***-**** (M)

awdxt5@r.postjobfree.com

OPERATIONS AND MANUFACTURING MANAGER

Operations and manufacturing manager with 20+ years experience. Expertise in streamlining procedures to improve safety levels, productivity, inventory, and quality control while realizing cost savings. Proven ability to manage and develop employees, plan, assign, and direct work, and build high-performing, cross-functional teams. Demonstrated skill in ensuring adherence to company policies, required workmanship standards, and manufacturing and safety procedures.

5S / IPC • Inventory Control • ISO Procedures • Lean Manufacturing • Material Control / KABAN/cycle counting, setting up and driving physical inventory • Operations Management • Policy / Procedure Development • Process Improvement • Product Development • Quality Control • SMT Line Production • SOX • Class II & III Clean-Room Start-Up Operations • Systems Installation • Total Quality Management • Training / Development

CAREER ACHIEVEMENTS

 Established reports of line down times, process control, line scheduling, inventory, material control, and DFT.

 Set up line stock to accommodate new medical builds.

 Oversaw production quality and defect root cause analysis.

 Implemented second shift and hired necessary workers to staff the shift.

 Established new 3-step router process to speed up sterile packaging operations by 30%.

 Streamlined new employee training programs.

 Increased labor efficiencies by 52% by captioning accurate tack times.

 Improved material variances by 45%.

 Decreased line down time by 26% within one quarter.

PROFESSIONAL EXPERIENCE

Sanmina – SCI. Allen, Texas. 2008 – 2009.

SMT Manufacturing Supervisor

• Oversaw production scheduling to maximize on-time shipments and production efficiencies.

• Managed quality and safety programs.

• Established, implemented, and measured production and quality standards.

• Managed production capacity to match demand while minimizing overtime.

• Managed continuous cost reduction programs.

• Coordinated with sales and the production scheduler to establish production priorities.

Selected Accomplishments

 Supervised PTS material scanning feeder installations.

 Established reports of line down times, process control, line scheduling, inventory, material control, and DFT.

 Set up line stock to accommodate new medical builds.

 Oversaw production quality and defect root cause analysis.

SVTronics. Plano, Texas. 2007 – 2008.

Second Shift Supervisor

• Supervised 20 + employees in SMT and PCB line operations.

• Met daily management production goals by maintaining a balanced production flow.

• Assigned daily tasks to team, assuring process control, team work, employee training, quality and safety.

Selected Accomplishments

• Implemented second shift and hired necessary workers to staff the shift.

ANS. Plano, Texas. 2005 – 2007.

Manufacturing Manager

• Managed 65+ employees in spinal stimulation implantable system.

• Supervised daily operations of generators, sterile, and final packaging devices.

• Met daily management production goals by controlling labor and material variances.

• Maintained a lean production flow.

• Assigned daily tasks to team, assuring process control, team work, employee training, quality and safety.

Selected Accomplishments

 Established new 3-step router process to speed up sterile packaging operations by 30%.

 Streamlined new employee training programs.

 Increased labor efficiencies by 52% by captioning accurate tack times.

 Improved material variances by 45%.

 Decreased line down time by 26% within one quarter.

Flextronics International. Plano, Texas. 1998 – 2005.

Manufacturing Supervisor / Manager

• Supervised 30 + employees in SMT and back plane line operations.

• Met daily management production goals, maintaining a balanced production flow.

• Assigned daily tasks to team, assuring process control, team work, employee training, quality and safety.

Selected Accomplishments

 Implemented new product induction center.

 Assisted with engineering new equipment, line layout, and DFT.

 Started 2nd shift. Increased production from 27.8 % to 72.6% in 1st quarter, and reached 92.9% in 2nd quarter.

 Assisted with engineering in new manufacturing process instructions.

 Formalized new data reports for down time, line scheduling, and inventory control.

 Streamlined new employee training programs.

 Increased production from 61.7% to 94.9%.

Harris Communications. Richardson, Texas. 1990 – 1998.

Production Supervisor

Varo – F-16 Launcher Group. Garland, Texas.

Buyer / Expediter

EDUCATION AND PROFESSIONAL CERTIFICATIONS

B.S. in Corporate Law. Canterbury University. United Kingdom.

Pace Technology (SMT) • IPC • Fiber Optic

Bell Core / Standards TR-TSY-000078-NWT000078

Martin Marietta Workmanship Standards

Master Control ECN

Start-Up ISO-9001 • TL 9000 • FDA ISO 13485 • IPC-610

TECHNICAL SKILLS

MS Office: Excel • Word • Outlook

Baan • Oracle • Symix • Master Control• Fourth Shift • Kronos • Agile 8 & 9

Hand Tools • Power Tools • Ohmmeter • Scope • Ultrasonic bonding • Cable Tester • Power Supply

Genrad Testers and other testers that checks status points, control points and alarms

SRT BGA repair station • Air Vacs BGA system • JUKI SMT • Conformal Coating

MYDATA SMT • Fuji • Chip Machines EDI scanner

Writing component specs • ECN • Schematics • Blueprints in SMT and Through Hole



Contact this candidate