Sign in

Power Plant Manager

United States
26-30 Hourly
April 18, 2011
Contact Info:

Sean Osborne

Level IV ****-Present

(419) ***-****

(615) ***-****


I have 15 plus years of Central Office Installation experience. I’ve had 6+ years managing a team of Installers, ranging in size from 3 to 25 people working in multiple locations across the U.S. documenting hours and routing installs and work performed. I also have Construction Manager experience in the wireless field.

Wireless Experience: Lead Technician

Comm Vet 2010-2011

Construction Manager


My duties were Equipment delivery and Inventory. Oversee installation of antennas and coax for 3 crews and shelter installation. Audit and punch sites and oversee use of crane and or man lifts. Train new crews upon arrival into market. Implement daily activities and forecast completions.

Power plants

Site upgrades

LTE installs

Complete antenna swaps and main lines

Goodman Networks 2009

Alpharetta Ga

Wireless tech II


All aspects of cell site work on the ground, or rooftops, addition of sectors, jumpers and T1, Also H-frame and T1 extensions

LMU trouble shooting, commissioning and screen captures



RETS settings and captures

T1 testing

Cell packs for T1 extensions (conduit/grounding unistrut)

NEMA cabinets

Site Surveys

GPS E911 installs antenna and LMU

Bechtel / Becon 2005-2007 Position: Wireless lead Technician.

Complete cell site construction, turn-up and trouble-shooting

1109 W. 13th St.

Deer Park TX. 77536



Supervisor over six, two man crews (Subcontractors) to upgrade cell site expansions and new builds. Documented hours and routing of sites and material delivery

Ericsson 2206 GSM (turn-up and trouble shooting)

Lucent Autoplex CDMA

Siemens NODE B (commissioning and turn up)

Siemens BTS

Ericsson RBS 884 (turn-up and trouble shooting)

Nokia GSM (turn-up and trouble shooting)

E-911 (True position) LMU (turn-up and trouble shooting)

T1 testing certified and looping




FIF rack (complete)

Commscope certified

Andrews certified

Anritsu trained - Line sweeping, and system sweeps

Tyco power plant

Eltek power plant

C&D Liberty acm. 600 power plants

UNIGY 2 batts and rect. install

Site Surveys


Rigging (crane)

Central Office Installation: Lead Installer and Q.A

Telecordia GR-1275 knowledge extensive

TP 76300

Alcatel 1671 and 1677

Complete Fiber Ring install

Fiber Splicing and testing

Cisco 15454, 7613, 6500, 7609

Cisco CRS

Cisco PIX firewall

Ciena Corestream DWDM (SOADM)

Nortel PDSN 16000 (Starent)

Juniper ISG 2000, M10I, SSG 550M

Juniper Viprion

Dell Poweredge 2950, 6950

Tipping Point 2400E, 5000E

IBM Blade Center

F5 Load Balancer

Network General (Sniffer) ASU 7500, Infinistream 1800

HFDB (High Fiber Dist. Bay), LFDB (Low Fiber Dist. Bay)

Fiber cross connects

Fiber Scope

Datacom fiber tap

Gigavue MP

BNC certified

AT&T certified

OC-3, OC-12, OC-48, OC-192

FLM (2400, 600, 150)

ADSL (Fujitsu and Alcatel) 1-3 bay installs

BSC (Base Site Controller)






C-Tapping, H-Tapping

Complete power installs. Batteries, Rectifiers and BDFB

Lugging Power

Testing Power

Complete ladder rack superstructure

Mainframe termination, wire wrapping and AMP connectors

Running Jumpers

Complete Switch Installs.

Nortel DMS 200-500

Tellabs TITAN 5500

Meridian (Northern Telecomm)

Alcatel 1677 and 1671-with some test and turn up exp.

Sycamore 16k and 3k.

Lead knowledge:

Closeout packages of sites

Quality Audit of work performed

Redlining of prints, reading prints and implementing design

Confirming Inventory and high risk work

Daily documentation of workers and hours

Routing and planning of sub-contractors


1.T1 testing Certified

2.Anritsu Certified (Site Master)

3.Commscope Certified

4.Andrews certified

5. AT&T Certified

6. CCNA (in progress)

Work History: Central Office

CWF Solutions. 2009-2010

Contractor for ADC Akron Data center

Rich Fries 440-***-**** ADC


Level IV installer. Complete CO install with Hilti grid support. Installed all isle grounds, ladder rack, equipment grounds and ran all the power for equipment, and mounted all cabinets and frames.

Pride Telecommunications.2007-2009

3300 Browns Mill RD.

Johnson City TN. 37604

Lead Installer

Mark Andrews 1-800-***-****


Supervisor over three, six man crews. Installed complete CO including all power and equipment. Part of the 12-8 sprint expansion. Responsible for materials and routing of crews and quality audits of all installs. (2 years)

Goodman Networks 2006

13835 Senlac Dr.

Farmers Branch TX. 75234

Lead Installer LV. 4

Kenny McCrary 1-706-***-****


Level 4 installer, in Wireless CO, responsible for yellow wallets and all documentation and other lower level installer

Butler International 2000-2005:

6615 Brotherhood Way.

Ft. Wayne Ind. 46825

Lead Installer / Quality Auditor

1-800-***-**** Bob Gross, Regional Manager


I was responsible for installation of equipment, also to teach customers the GR 1275 standards for their own install. I also had to QA other contractors work, document hours

Fiberquest 2002, 9 months

Complete Fiber ring install

Sr. Lead Installer

Ladonna Martin Owner 1-770-***-****


Supervisor over four, three man crews. Installed complete fiber ring. Responsible for materials and routing of crews, hours and budget

Tek-systems 1998-2000 Misc. Installs

AeroTek 1997-1998 (became above)

Listn.1996 # unknown


Ohio State University

Electrical Engineering based on telecommunications

2 years completed

Ontario High School

Graduated 4 years


Rich Fries

(ADC) 440-***-****

Rich Sampson

(Sprint) 917-***-****

Randy Croston

(Bechtel) 864-***-****