June 2017-Present:

TexMex Machining – Vice President

Manage Planning, purchasing, customer/vendor relations, accounts payable/receivable, inventory, and shipping.

Manage multiple products through their lifespan, ensuring customer dates are met.

Ensure administrative documents are accurately compiled and recorded in adherence to quality management system requirements.

Hold weekly planning and cost meetings with staff.

Assuring client satisfaction is achieved on all levels.

Putting safety programs in place to ensure zero accidents on site.

QC\QA guidelines and procedures are in place and followed.

Production planner with supervisor team

Detail planner for the safe construction of all projects

October 2014 - February 2017:

Oil Gas and Chemicals – Vice President of Construction

Responsible for equipment, tools, materials, manpower, cost, boiler & pipe erection sequence, etc.

Developed cost structure for all boiler related pipe and boiler components.

Interfaced with rigging engineer and boiler engineer to develop proper lift procedures and lift plans for boiler pipe and boiler components.

Developed a plan for all work fronts implementing safety into work packages to ensure work was safely performed supporting the zero-accident philosophy.

Provided technical assistance for pipe superintendents

Other duties include supervising NDT and inspecting all QC/QA.

May 2009 – October 2014:

Shaw Group - Project Superintendent Power Block

Project Detail: Cliffside Project in Cliffside, NC. $1.29B EPC contract constructing (1) 800 MW supercritical coal-fired electric generating plant with a flue gas desulfurization system.

Responsible for equipment, tools, materials, manpower, cost, boiler & pipe erection sequence, etc.

Developed cost structure for all boiler related pipe and boiler components.

Interfaced with rigging engineer and boiler engineer to develop proper lift procedures and lift plans for boiler pipe and boiler components.

Developed a plan for all work fronts implementing safety into work packages to ensure work was safely performed supporting the zero-accident philosophy.

Provided technical assistance for pipe superintendents for Hitachi boiler piping.

Other duties include supervising NDT and inspecting all QC/QA.

October 2008 – May 2009:

Bechtel Construction - Area Manager Power Block

Project Detail: Trimble County Unit 2 Fossil Project in Bedford, KY. New construction of TC2 unit, 750 MW super-critical pulverized coal fire unit with world class environmental controls.

Evaluate boiler erection sequence and develop boiler erection recovery plan.

Responsible for supervising and directing multi craft superintendents. Schedule the sequence of work for boiler erection recovery plan.

Obtain, review, and follow rigging plans for all lifts.

Plan manpower and equipment required for all activities under my supervision.

Coordinate any safety training required by superintendents and enforce safe work practices.

Ensure performance and unit rates for my areas and/or activities are within project goals.

Responsible for ensuring all cost codes under my purview were accurately recorded and within project goals.

Maintained positive working relationships with crews, superintendents, human resources, and labor relations. Resolved conflicts as required and ensured federal labor laws were adhered to.

Follow all Bechtel Standard Work Process Procedures and Bechtel Environmental, Safety, & Health core processes.

June 2008 – October 2008:

Bechtel Construction - Mechanical/Structural Superintendent (Night Shift)

Project Detail: Sammis Project in Stratton, OH. $1.7B Retrofit of the air quality system which dramatically reduced gas emissions from the 2,200 megawatt, coal-fired power generating facility.

Responsible for supervising and directing activities of approx. 100 boiler and structural steel craftsmen. Scheduled the sequence of work for crews under my purview.

Planned and communicated safety to all night shift employees.

Plan and coordinate structural steel and duct work.

Obtain, review, and follow rigging plans for all lifts.

Complete job hazard analysis for new tasks performed.

Plan required manpower for all activities under my direct supervision.

Ensure performance and unit rates for my areas and/or activities are within project goals.

Plan and procure all tools required for night shift work.

Follow all Bechtel Standard Work Process Procedures and Bechtel Environmental, Safety, & Health core processes.

March 2006 – June 2008:

Bechtel Construction - Lead General Foreman – Over Boiler Erection, Boiler Hydro, Closure of Gas Path, & Startup

Project Detail: Elm Road Generation Station Project in Oak Creek, Wisconsin. $2.4B lump sum power plant. Construction project consisting of (2) 1230 MW Supercritical Pulverized Coal Boilers.

Responsible for supervising and directing activities of approx. 100 BM craftsmen. Schedule the sequence of work for crews under my purview.

Plan and coordinate the pre-modification, lifting, erecting, and installation of boiler piping, pressure parts, all hangers, boiler duct work, condensers, and wind boxes. Designed the economizer modulation.

Obtain, review, and follow rigging plans for all lifts.

Complete job hazard analysis for new tasks performed.

Plan required manpower for all activities under my direct supervision.

Coordinate any safety training required by crews and enforce safe work practices.

Ensure performance and unit rates for my areas and/or activities are within project goals.

Coordinate with engineering, tool room, rigging loft, operators, etc to ensure my crews have what they need to get the job done.

Responsible for cost coding time sheets and imputing the data into E-track.

Site trainer of all craftsmen in the safe use of swing stages.

Team leader of project first responder team.

Follow all Bechtel Standard Work Process Procedures and Bechtel Environmental, Safety, & Health core processes.

March 1996 – March 2006:

Union/non-union Contractors - Boilermaker

Pennsylvania, Illinois, Kentucky, Ohio, Indiana, West Virginia

Extensive experience on various union projects performing tig welding, mig welding, and stick welding, including but not limited to tube welding, pipe welding, heavy wall high pressure welding, and stainless welding.

Other duties performed in conjunction with regular daily activities included heavy rigging, steel erection, and boiler erection.

Held foreman positions and general foreman positions on several assignments supervising approximately 20 -35 men crews.

Performed new construction and maintenance on combined-cycle boilers, coal fire boilers, and fluidized bed boilers. Maintenance of steel mills and refineries. Also worked on SCR, scrubbers, and tanks.

Training and Certifications:

Bechtel Supervisor training

Six Sigma

SWPP courses on Bec Collage

CPR and First Aid

Respirator Training

Aerial Lift Operator Certification

Fall Protection Training

Confined Space Training

Scaffold User Training

Hazard Recognition Training

ES&H Core Process Training

8 Hour Competent Person Rigger Training

Spider Suspended Platform Trainer

Hexavalent Chromium Training

Volunteer Fire Rescue

Proficient in:

Microsoft Office Programs

AutoCAD

E-Track

PowerPoint

Outlook

Primavera