Post Job Free

Resume

Sign in

Warehouse Supervisor Maintenance

Location:
Houston, TX, 77068
Posted:
March 15, 2023

Contact this candidate

Resume:

Randy Beezley

Houston, TX ***** 435-***-****

advxdg@r.postjobfree.com linkedin.com/in/randy-beezley-6457792a

SITE MANAGER

Hands-on site manager with exceptional interpersonal skills and outstanding troubleshooting abilities. Proven ability to minimize costs through good procurement, continuous improvement, and lean manufacturing principles. Excellent interpersonal skills ensure a smooth working relationship with other sites and departments. A proven leader, nurtures and leads employees in a way that fosters safety first, teamwork and self-fulfillment.

• Health & Safety “OSHA 10 Course” • Cost Savings • Quality Assurance

• Team Leadership • Cross-functional Collaboration • Vendor Management

TECHNICAL SKILLS

Lyle Thermoformer; GN Thermoformers, Brown Thermoformer/5500; Brown Trim Presses T350 and T345V; Irwin Thermoformers and Trim Presses; PTI 6” extruder NRM/Davis Standard 3.5" single extruder with 54" sheet die; NRM/Davis Standard, Gloucester and Sencorp 4.5" to 6" tandem extruders with 6.0” to 15.5” Dies; PTI 8" to 4.5" and 6" pelletizers. Stanly Kidder Printing press “C.I. and Stack”, 20 years flex and offset and process printing. Third party audits (SQF/AIB/BRC)

Materials include: PLA, OPS, PET, GP Polystyrene, HIPS 680, HIPS 1115, BX0454, 525K, BX 0454X0, Blowing Agents, Z2 (152A), Isopentane and Butane. Progressive Inks, both water and solvent.

EXPERIENCE

Soft-Tex, Houston, TX January 2021- November 2022

Site Manager

Oversaw the startup of a new 170k sqf facility. Starting with Warehousing and Distributing Center install ERP System. Completed a $250,000 rack project and 2 100 hp air compressor units. Assisted in design of employee break rooms and management offices. In charge of searching and receiving on all support equipment. Led hiring of: 1 warehouse supervisor, 5 warehouse staff, 1 maintenance supervisor, 1 floor supervisor, and 20 floor workers.

World Emblem, Houston, TX January 2020 – December 2020

Site Manager

Contract job: Starting a new 70k sqf plant. Starting with Warehousing and Distributing Center install ERP System. Oversaw electrical installation of compressed air production machinery including 10, 15 head Braiden’s, 12, 6 head Toshibas’, 21, heat transfer press and directed hiring of new workforce, including 2 supervisors and 30 floor workers.

WNA, Houston, TX June 2015 – January 2020

Site Manager

Oversaw a complex manufacturing facility and distribution center for a manufacturer of OPS take out containers and dinnerware. Managed a 100k sqf building, 100 employees, 6 supervisors, and 5 managers.

Achieved cost saving savings and efficiencies; reduced scrap rate from 3.5% to under 2%, changeover time from 3 hours to 2 hours, and the in-line roll change from 20 minutes to 5 minutes.

Achieved 16 months of incident free safety free record

Developed processes and continuous improvement projects which reduced the number of operators per machine.

Cut overtime in half by introducing new shift coverage.

Reduced turnover rate 75% to 20%.

Fostered a sense of teamwork amongst management.

Met and exceeded budget expectations and operational efficiencies.

Increased machinery efficiency from 85% to 93%.

Achieved a AA score on the first-ever BRC audit for the facility.

Maintained a clean and safe working environment for all personnel through 5S programs, developing SOPs and JAS’s.

Warehousing and Distributing Center install ERP System.

Achieved excellent fulfillment rates and on-time shipment and delivery track records through QSCOT.

Considered the interests of all constituents including employees, management, investors, suppliers, customers, and community when making decisions.

Genpak LLC, Montgomery AL September 2009 – June 2015

Production Manager

Oversaw all production, safety, quality and staffing for three shifts (150 laborers and 5 supervisors) for a manufacturer of foam take out containers, dinnerware.

Executed production requirements and communicated with corporate office on scheduling issues.

Directed maintenance activities and developed preventive maintenance programs.

Assured availability of required tooling and troubleshot issues.

Ordered all raw materials and corrugation and polybags for production.

Maintained inventory for all production and raw materials.

Organized process control and set the process for 4 extruders, 6 thermoformers, and 5 printers.

Insured all production (extrusion and thermoformers) runs to speed and maintains optimum quality.

Set up and implemented monthly safety and employee shift meetings.

Spearheaded all process and quality improvement; tested new materials, reduced scrap, and improved run times through process sheets.

Facilitated AIB, YUM, Siliker, and SQF audits.

Clear Lam Packaging, Vernon, CA September 2008 – September 2009

Vice President, Manufacturing

Oversaw the start-up of production for a manufacturer of PET and PLA plastic containers.

Starting with Warehousing and Distributing Center install ERP System.

Set up building (cleaning, painting, fire protection, safety, all city permitting).

Prepared warehouse for shipping and receiving of finished goods.

Established all contacts with venders and contractors for the startup of production.

Oversaw the installation of 4000amp service from city to production floor, as well as an air compressor and chilled water to production floor.

Installed 2 Lyle thermoformers and set up process sheets.

Installed 1 PTI 6” extruder with a 80” die to run PLA and PET.

Ordered all packaging and material for production.

Hired 80 employees, from packers to supervisors, to run four 12 hour shifts.

Designed and implemented all safety programs.

ADDITIONAL RELEVANT EXPERIENCE

Genpak LLC, Cedar City, UT

Production Manager

Oversaw all production, safety, quality and staffing of three shifts (150 laborers and 8 supervisors) for a manufacturer of foam meat trays, take out containers, and dinnerware).

Prairie Packaging, Bedford Park, IL

Process and Setup Manager Foam Shift Manager Foam Process Lead

Promoted through multiple positions for a manufacturer of consumer goods, foam plates, bowls, platters, and lids.

Sweetheart Cup (Lily), Springfield, MOP

rint Shop Lead Foam Lead Foam Operator

Promoted through multiple positions for the Trophy Cup producer.



Contact this candidate