Daniel Goobic
admapk@r.postjobfree.com
www.linkedin.com/in/danielgoobic
Prospect Park NJ, 07508
QUALIFICATIONS SUMMARY
A long history of hands-on and technical work for key companies coupled with an inclination to comprehend systems while having a propensity to work towards a safe and productive state. SKILLS
• Ability to keep the focus on priorities that could potentially be safety issues or service affecting.
• Conscientious coworker with a respect for others, communicating with them professionally.
• Routine use of various hand tools; wrenches, hammers, drills, screwdrivers, Multi-meter, fiberscope, etc.
• Willingness to multitask in rapid, stringent environments.
• Ability to prioritize, maintain attention to detail, while recognizing time constraints.
• Fundamental knowledge of essential equipment and general maintenance activities and procedures.
• Capability working upright out in the elements through shifts
• Eagerness to learn new skill sets.
• Excellent attendance record and work ethic.
EXPERIENCE
COMMUNICATIONS EQUIPMENT INSTALLER
12/2020 – 12/2020 Goodman Communication Services
11/2016 – 12/2020 Nokia
04/2006 – 11/2016 Alcatel-Lucent
09/1996 – 04/2006 Lucent Technologies
02/1992 – 09/1996 AT&T
01/1989 - 09/1989 Aramis (Line Attendant)
Telephone Central Office Environment.
• Identify, run, and connect various cables as per Telecommunication Standards.
• Installed diverse telco equipment utilizing various methods: soldering, punched down leads, crimping connectors, tipping and splicing fiber optic cables, hydraulic cutting tools, etc.
• Systematically removed completely, entire floors of older switch equipment, preserving the functional integrity of specific equipment for use elsewhere.
• Installed Hilti and 3M Firestop systems where pipes & cables penetrated floors and walls.
• Worked on DC Power Plants with Battery backup and terminating circuits in live distribution Bays
• Wired up AC receptacles, switches, and lighting fixtures.
• Laid out Equipment Locations, drilling concrete floors, and bolting down equipment bays.
• Communicated with customers about the maintenance window work scheduling to minimize interruption to the network.
• Prioritizing working safely with the proper equipment and following policies and procedures.
• Read and interpret job MOPs and engineering drawings relative to the functions to be performed.
• Worked with Verizon inventory team, Barcoding new and old circuit boards and equipment, uploading to database, and arranged for shipping when needed. Tool Room Coordinator
• Order Tools and consumables for 20 Managers and several hundred Installers.
• Kept an Access database of tools and to whom they were assigned.
• Maintain a small fleet of vehicles (4 to 12).
• Calibrated hand tools and sent out more technical tools that could not be certified in house. Bell Labs
Competitive Analysis
• Was selected to work with Technical Staff and Mechanical Engineers to evaluate Alcatel-Lucent products versus the competition’s regarding cost, features, durability, etc.
• Was asked to perform lab mock installs to relay field installation conditions, issues, and solutions to the designers and engineers, striving for best practices.
• Worked with engineers, demonstrating the steps and procedures field installers need to take, so that product handbooks and procedures could be compiled. Lab Builds
• Installed suspended multi-tier wire pan rack systems, utilizing drop-in anchors, unistrut, and a wide variety of hardware solutions.
• Cut Raised floor tiles to accommodate special equipment and Plenum rated cables.
• Relocated Power Bays with battery backup and Equipment frames, using hand-operated lift trucks and smaller man lifts and scaffolding.
• Ran and terminated a wide variety of cables.
Remote Test Center
• Was chosen for a several month project in an Ohio remote test center, assisting field Installers to turn up Verizon 4G equipment via several restricted online computer servers. Wireless Cell Site Work
• Worked on AT&T, Verizon, Sprint, and T-Mobile cell sites.
• Installed and Powered up cellular equipment.
• With teams, built new cell sites and completed older equipment swap outs.
• Log in and out of cell sites daily, checking in and providing status updates with several different remote groups via phone bridges, Cisco Jabber, texts, and email.
• Reconfigure 2G, 3G & 4G to allow for 5G technology to be shared with older equipment
• Trouble Shot Cell site issues dealing with cable routing, continuity, proper power requirements, fiber cleaning, and correct software and files, etc.
• Routinely worked with global engineer teams to upgrade equipment.
• Loaded software, site-specific files, and set parameters for cellular equipment.
• Performed 911 and call testing on several different technologies.
• Leave Cell Site compound neat and Secured.
• Provide EOS & EOJ reports.
• Was selected by management to work on T-Mobile 5G projects in Iowa and Kansas City. EDUCATION
2020 NEC code update
Passaic and Morris County Tech Night Classes
• Carpentry, Welding, Masonry, Auto Body & Small Engine Repair Pompton Lakes High School