-
-
-
~ 04/2016 - 2016 +
www.enhancv.com Powered by /
ABU ZEESHAN KHANDEGAR
# +91-636******* _ adlpen@r.postjobfree.com
+ India
SUMMARY
Committed to identifying and implementing continuous improvements in the Supply Chain & Part procurement. Now looking for a new and challenging position, one which will make best use of existing skills and experience and also further my personal and professional development. EXPERIENCE
Spare Parts Manager
BELLAD ENGINEERS PVT LTD
Hubli
Commercial Vehicle Workshop
Analyze The operation of the department and provides technical assistance to the employees of automobile parts. Worked with body shop manager and service manager to ensure a timely turnaround of parts required for internal jobs. Attends managers meetings and conducts weekly meetings for the automobile parts sales department. Responsible for developing sales promotions for various automobile parts. Developed, enforced and monitored set guidelines for working with customers to ensure customer satisfaction. Responsible for supervising stock order procedures. Ensures that the same high level of quality service is provided to internal and outside dealership customers. Ensure the all physical parts quantity need to be matched with system quantity. All parts need to be salvage and inventory should be controlled. Arranging parts as per priority wise & following up with Vendor and Logistics. Associate
Tata Motors
Dharwad
Supply Chain Department
Responsible for procurement of monthly purchase value 150Lak. Of Sheet Metal Components. To handle multiple suppliers’& more than 300 Auto bought out parts To Raise Schedules to local & long distance suppliers as per plan received from PPC by utilizing Enterprise Resource Planning system (SAP), Materials Requirement Planning (MRP), shortage reports, and forecast reports. Procurement of materials as per “Delivery Cycles” to improve a just-in-time program to minimize lead time and costs on heavily used components.
Analyze buy history and shortages to determine best method of procurement and expedite according to work order start dates.
Conduct periodic review and analysis of the inventory of slowing moving and critical items. Quickly set up new parts Master in SAP by compiling all necessary information such as item lead times, minimum order quantity, vendor name, and planner codes.
Service Engineer
COSPHI INDIA PVT LTD
Bangalore
Energy Meters Sales & Service
Installation and Commissioning of Energy Meters.
Troubleshooting of issues in plant and on site.
Interface the Energy meters with Schnieder Electric based software.
~ 2011 - 2011
/
~ 01/2013 - 2016
/
Microsoft Excel Microsoft Word PowerPoint SAP CAD PRO-E Oracle's Siebel P P
P
www.enhancv.com Powered by /
EDUCATION
SSLC
Anglo Urdu High School
GPA
4.0 4.0
Mechatronics
NTTF Dharwad
GPA
4.0 4.0
TECH STACK
ACHIEVEMENTS
Participated at ROBOCON 2016 THEME By
THAILAND (CLEAN ENERGY RECHARGING THE
WORLD).
Co-ordinated to salvage 300 no’s non moving
fuel tank and leading to cost saving around
4.5 lacs rs.
Project completed at Hydro Power Plant in
Jog Fall to convert Manual Monitor System
into Automatic Monitoring System for
Energy Meters.
LANGUAGES
English Native Hindi Native Urdu Native
Kannada Proficient
PASSPORT DETAILS
Passport Number : N6249424
Country Code : IND
Date of Expiry : 17/01/2026