ROWELL DE CHAVEZ MAULION
Address: Talumpok East, Batangas City, Batangas
Email: adjurt@r.postjobfree.com
Contact No: +639*********/ +639*********
Date of Birth: 28 November 1986
Sex: Male
Civil Status: Married
Passport No: P526839A
Validity: 07 December 2022
POSITION APPLIED
Pipefitter / Fabricator
CAREER OBJECTIVES
My goal is to find a position with a secure and stable company that will allows me to use my years of experience in the different kinds of construction and industry in an environment that is fulfilling and satisfying.
KEY OF COMPETENCIES
More than 12 Years work experience in the field of construction of power plant, building, refinery and petrochemical plant.
Qualified operator for Over Head Crane.
Concrete knowledge to use the Gas Welding, Gas Cutting and Plasma Cutting.
Knowledge and ability in welding with WQT Certificate number FCAW 636-02S, GMAW 636-01S and GTAW 626-01S by the BHPI/MHPS Company.
National Certificate II Holder (NCII) Qualification from TESDA.
Institution of Occupational Safety and Health (IOSH) managing safely Certificate Holder (Cert No: 117945).
Ability to read and interpret various blueprints and diagrams to facilitate the installation process.
Knowledge to operate some machines such as pinning, punching, welding, bending and cutting machine.
Strong knowledge and ability to perform manual labor or mechanical operations (Construction, Installation, Repair and Maintenance).
Excellent knowledge of the principles, method and techniques used in the pipe fitting trade.
Profound knowledge of tools and equipment of the trade and skill in their safe use.
Remarkable knowledge of the occupational hazards and safety precautions of the trade.
Strong ability to plan and perform work involving the installation, modification and repair of new and existing structures and piping systems.
Proven ability to follow instructions, specifications and blueprints.
Sound knowledge of various dry and wet sprinkler systems.
Capability to work in multicultural environment. I have played also the leader role to hand over project to clients from different countries.
Knowledge to operate of some computer application such as MS word, MS power point MS excel and encoding to data base.
WORK HISTORY
Inclusive Date: August 05,2019 to December 08, 2020
Position: Pipe Fitter Foreman / Fabrication Lead
Employer: JGC corp Philippines.
Location: JGC Philippines Building, 2109 Prime Street, Madrigal Business Park, Ayala
Alabang, Muntinlupa City 1780
Company type: Engineering, Procurement, Construction and Maintenance
Project: (Nickel Mining and Processing Company) THPAL Major Shutdown Project, Compressor Project, December 2019 Emergency Shutdown, FTNRL Pipe line Project and March 2020 Minor Shutdown, September Plant Major shutdown (THPAL Nickel Mining and Processing.
Job description:
Repair of the following areas such as Autoclave Line1 and Line 2 and MS Reactor.
Distribution of Job to my people and conduct of proper tool box meeting. explaining about work procedure and neccessary documents shoul be apply.
As a team leader I need to assess the work area if it is safe. proper coordination to safety department, production personel and to project in charge in the work area.
Applying of Work Permit and double check all the neccessary documents must be completed.
Study the drawing and bill of materials, applying the sequence of a job base on my plan.
Proper monitoring of all on going Jobs. and applying immediate action if we incounter some abnormal situation. im going intervien my people and declaring the stop work if neccessary.
Time to time visiting (roving) the more than 30 people to check the status of a job.
Study the scop job and calculating the Job if how long to do the job. estimating if how many days to be done. include it to the report and raise to our meeting.
Making report if how many percent a daily accomplishment.
Making of final report, including comsumed materials, argon, filler and other consumables.
Inclusive Date: November 13, 2018 to July 30, 2018
Position: Pipe Fitter
Employer: Atlantic, Gulf and Pacific Company of Manila Inc.
Location: AG&P Heavy Fabrication Yard, San Roque, Bauan, Batangas
Company type: Construction, Building, Engineering
Project: JG Summit Petrochemical Complex Expansion
Job description:
I am assigned in heavy fabrication yard 1 (one) of AG&P therefore all the Fabricated spools, modules, Frames, Pipe Racks and other necessary structures for erection will be our responsible to fabricate.
Study the drawing and all materials needed for fabricating of some spools, pipe rack, frames or any drawing packages as our superiors and engineering department order for prior to fabricate.
Check all the supply materials from warehouse if it is no damage or defect.
Planning and estimating the position and angle of the components or structures for fabricating.
Arrangement of Jigs, Platform and other supporting braces using transit for balancing elevation, and crane for lifting the components to make firm and stable position of it.
Put the pipe spools or any necessary materials as per drawing and fit up etc. things and coordinates all the other parts prior for erection to site.
Lay out all these components and put all the supports required.
Inclusive Date: March 8, 2018 to October 25, 2018
Position: Pipe fitter
Employer: Modair Manila Construction Co. LTD
Location: 3rd floor, Emmanuel House Bldg., 115 Aguirre St., Legaspi Village, Makati City, Philippines
Company type: Engineering Construction and Maintenance
Project: Daiho LIMA Factory 2 and Rohm Semiconductor Factory.
Job description:
Study the location of pipe line and sprinkler point as per drawing.
Lay out the location of clevis support and insert it into the wall.
Fabricating of pipes prior to install.
Installation of fabricated pipes and the droppings and plug.
Hydro testing of finished areas.
Installation of sprinkler heads.
Installation of air condition drainage.
Manual excavation and lay down the pipes for water supply, sewer lines and water lines.
Erection of the RCP Pipes Vertical position used it as a man hole.
Connecting all pipes and toping to the main supply.
Inclusive Date: September 18, 2017 to November 14, 2017
Position: Skilled Fitter
Employer: Andritz Hydro GmbH
Location: ANDRITZ HYDRO GmbH Liberia c/o Parker & Associates 81 Sekou Toure
Avenue, Mamba Point, Monrovia, Montserrad Country, Liberia.
Company type: Global suppliers of electromechanical equipment and services for
Hydro power plant.
Project: Mount coffee Hydropower plant Rehabilitation in Liberia for warranty purpose.
Job description:
Erection of additional railway for new gantry crane.
Assemble of new gantry crane. Work with our vendor Rialex Crane System Company as assist to them.
Repairing of leaked spillway gate and put some additional bracings and brackets.
Installation of additional pipe line and valve for additional drainage in power house.
Fabricating and Erection of additional Platform Structure access going to control panel
Inclusive Date: March 28, 2017 to August 30, 2017
Position: Pipe fitter
Employer: JGC Corp Philippines
Location: JGC Philippines Building, 2109 Prime Street, Madrigal Business Park, Ayala
Alabang, Muntinlupa City 1780
Company type: Engineering, Procurement, Construction and Maintenance
Project: Coral Bay Nickel Corporation Line 1 Major and Line 2 Minor Shut down. And
PSPC Shell Refinery Tabangao Batangas City Turn around Shutdown, Jetty 2
Shut down.
Job description:
First of all is Check all the Risk Chemicals, Gases, Hs2, or any Hazardous Particles in the area. Evaluate it and apply the control measure before do the Job.
Patching the defective wall of vessel.
Cleaning the tank/Vessel as per Superior order.
Reading the plan drawing and assemble of a new Structures and Pipe spool. And preparation for replacement to old existing structures and pipe spool.
Repairing the defected pipe lines, Structures, Tanks, Tromil Chute and other parts of Plant
Walk through with in charge Engineer to the area should be repairing. Get the actual dimension of damaged part of Tanks, Vessel, Pipe lines, Structures etc. (Stainless, Carbon, Chrome, Alloy and Titanium materials)
Fabricating the Spool Pipes, Structure parts, Plate for patching, etc. as per Actual measurements from site. (Stainless, Carbon, Chrome, Alloy and Titanium materials)
Double checking the Components before full Welding of all the Joints.
Proper Isolation of Gas, Acids, Chemicals or any Particles or Elements found into Tank storage area.
Make all the Activities with proper compliance to Safety Procedure.
Inclusive Date: August 02, 2016 to November 02, 2016
Position: Skilled Fitter
Employer: Andritz Hydro GmbH
Location: ANDRITZ HYDRO GmbH Liberia c/o Parker & Associates 81 Sekou Toure
Avenue, Mamba Point, Monrovia, Montserrad Country, Liberia.
Company type: Global suppliers of electromechanical equipment and services for
Hydropower plant.
Project: Mount coffee Hydropower plant Rehabilitation in Liberia
Job description:
Fabricating of Heavy Structure gate that we may use it as a gate for draft tube.
Erection of Fabricated Gate using Crane.
Erection of servo motor and its hydraulic tube lines used to close and open the draft tube gate.
Installation of water cooling, dewatering, pipe lines and drainages (Stainless pipe).
Installation of air tubing (Stainless tube) for maintenance purposes.
Hydro testing of installed components such as pipe lines, dewatering and water cooling.
Leak testing of air tube lines to make sure that it has no leak.
Checked and repaired of old existing pipes if it is in a bad condition and we need change it.
Inclusive Date: May 05, 2016 to July 07, 2016.
Position: Pipe Fitter / Fabricator
Employer: EEI Construction and Marine Inc.
Location: 12 Manggahan St, Bagumbayan Libis Quezon City Philippines.
Company Type: Engineering and Construction Company
Project: Petron Bulk Plant (Navotas) Rerouting the receiving pipe line.
Job description:
Manual excavation to prepare for erection of foundation of the pipe bridge structure. And concreting the base of frame according to plan drawing from engineering department.
Erection of Pipe Bridge frame structure. Using crane, chain block, chain puller and other lifting equipment.
Fit up of structure support to make firm the pipe bridge structure.
Lay down the pipe on the area for preparation to install.
Installing of pipe line according to isometric and superior order if they have an as built plan.
Hydro testing the finished line area for assuring the pipe line has no leak.
Taping the new pipe line to live pipe line for receiving the chemical. And dismantling the old pipe line.
Maintaining the good housekeeping before and after the task.
Inclusive Date: December 11, 2014 to February 28, 2016
Position: General Helper in Saudi VISA / Pipe Fitter
Employer: ESAD Manpower Services / Al Rushaid Construction Co. LTD (EEI)
Location: 4th Flr Tower A Petroleum Center Doha Road Al Khobar 31952 Saudi Arabia.
Company Type: Engineering Construction and Maintenance.
Project: SADARA KFIP tank farm Jubail KSA.
Job description:
Erection of pipe rack structures,
Checking the area to make sure that has no obstruction to pipe line before we install.
Fit up and install the pipe line as per isometric drawing.
Reporting to my foreman/Supervisor if we have an obstruction to pipe line to make a new revision drawing as per engineering department or client.
Connect pipes and piping sections using welding and soldering equipment and connect them to main header pipe lines, chemical pumps and supply tanks as indicated in the blueprint.
Test system for leaks using air or liquid pressure equipment
Punch list clearing.
Inspect, maintain and repair pipeline sections as per comment by the QC.
Performed all work under the required regulations, wear the appropriate clothes necessary for installation.
Participate in value stream improvements and kaizen events.
Inspect the work in coordination with the local authorities and contractors.
Specialized in working for long hours and weekends to complete all the installation work on time.
Fabricate, assemble and lay down to site the piping components and fittings according to isometric drawing, requirements and their specification.
Inspect the work site to determine the presence of obstructions and to ascertain that hole cut for pipe will not cause of structural weakness.
Plan installation or repair to avoid obstruction and to avoid interfering with activities of other workers
Assemble and install variety of metal and nonmetal pipe, tubes and fittings, including iron, steel, copper, and plastic.
Assembled and secured pipes, tubes, fittings and related equipment according to specifications by welding, brazing, cementing, soldering and threading joints.
Measured and marked pipes for cutting, beveling or threading.
Cut and bored holes in structures such as bulkheads, deck, walls and main prior to pipe installation using hand and power tools.
Line checking and completing the balance attachment or repairing the pipe line as per advice by Quality Control section.
Inclusive Date: November 24, 2011 to November 30, 2013
Position: Pipe fitter
Employer: Al Jaber Engineering LLC.
Location: Doha Qatar
Company Type: Engineering, Procurement and Construction.
Project: Qatar Petroleum District Project (High rise building) Doha Qatar.
Job Description:
Lay out the areas and checking all the obstruction to the Pipe line and modified the pipe line plan if we found obstruction.
Lay down the Pipe main header and branches Tubes according to the drawing and lay out.
Lifting the Pipe using chain blocks and Manual lifting equipment.
Connecting the Joints using mechanical coupling, tee and other fitting required
Threading the end of tube and connect it harmony.
Connecting piping systems to water mains header, supply tanks, pumps and control equipment.
Erecting of Water Vessel with my group mate.
Installing the Fire Hose, and Fire Cabinet.
Installing of PVC pipe for draining the Sewage water from toilet and lavatory.
Installing the Tubes, faucets and showers to every room. Lavatory, bath tub, kitchen and shower room.
Welding the copper pipe line using gas welding equipment.
Installing of shower heater, water heater and water strainer.
Testing the Pipe line system for leaks using water or air.
Using power tools and hand tools to modify repair and maintain existing installations.
Inclusive Date: May 9, 2006 to November 30, 2011
Position: Pipe fitter, HRSG worker II (Boiler maker)
Employer: Babcock Hitachi (Phil) Inco / Mitsubishi Hitachi Power System (Phil) Inc.
Location: AG&P Special Economic Zone San Roque Bauan, Batangas Philippines.
Company Type: Boiler Fabrication and Maintenance
Project: -(XPD Project) HRSG Flash Tank
-(TAKUMA TPI Project) Pressure Part for woody blomass fuel firing Boiler
-(TAKUMA INE Project) Waste heat recovery Boiler Pressure Parts.
-(BHK-KHI/HIRATA(HTK) Project) Pressure parts for waste heat recovery Boiler.
-(SHI-NPS Project) Boiler pressure parts & eco block assembly.
Job Description:
Align and secure structural parts and related assemblies of pressure vessels and generating tubes, using plumb bobs, level wedge and turn buckles.
Panelizing the pin tubes, fit to header stub to pin tubes in one by one.
Fit up the attachment to panel tubes and welding it using Gmaw/Gtaw and Smaw welding machine.
Rectify the panel tubes and maintained the required width and diagonal measure.
Fit up of panel tube to header stub.
Straighten or reshape bent pressure vessel plates and structure parts using hammer, jack, and heating torch.
Maintain and repair stationary steam boiler and boiler house auxiliaries using hand tools and power tools.
Repair insulation of pressure vessel with cement.
Locate and mark reference points for columns or plates on foundation using master straight edge square, transit and measuring instruments.
Clean pressure vessel equipment using scraper wire brush and cleaning solvent.
Install refractory brick and other heat resistant materials in firebox of pressure vessel.
Study blueprints to determine location relationship and dimensions of parts to assemble pressure vessels such as boilers tanks and vats.
Repair or replace defective pressure vessel parts using torch, jacks, caulking, hammer, power saw, and grinder and welding equipment.
Erection of structure and vessel rack for installation steam drum vessel and water drum.
Align the steam drum and water drum of the package type boiler using transit.
Install man holes, hand holes, valve, gauges, and feed water connection in drums of water tube boiler using hand tools.
Installation of structure supports for packaging the components.
Performed other duties as assigned
Inclusive Date: July 2004 to October 2004
Position: IT Personnel (OJT)
Employer: STI College Batangas City.
Location: Kumintang Ilaya, Batangas City Batangas Philippines
Company Type: Computer College / Educational Facility
Job Description:
Repairing of troubleshooting and computer hardware assembly.
Data encoding.
Typing job as superiors order.
TRAINING & EDUCATIONAL ATTAINMENT
Course: Instutition of Occupational Safety and Health (IOSH) managing safely
School: Doha Industrial Safety Services (DISS)
Location: Al hilal St Doha Qatar
S.Y. 2013
Course: Pipe Fitting Trade
School: Technical Education and Skills Development Authority (TESDA) Batangas
Location: P. Herrera St. Batangas City, Batangas Philippines
S.Y. 2005 to 2006
Course: Information Communication Technology Training
School: Batangas Information and Technology Center
Location: Capitol Site Batangas City, Batangas Philippines
S.Y. 2003 to 2004
Course: High School Diploma
School: Batangas Eastern Academy
Location: Javier St Poblacion San Juan Batangas Philippines
S.Y. 1999 to 2003
CHARACTER REFERENCES:
Nonilon Balmes
Project Site Superintendent.
JGC Corp O&M
Mobile No: +63-956-***-****
Jomar Flaviano
Site Supervisor
Modair Manila, Philippines
Mobile No: +63-966-***-****
Antonio Pagcaliwagan
Foreman Machinist (Panel Group)
Mitsubishi Hitachi Power System (Phil)
Mobile No: +63-908-***-****
ROWELL DE CHAVEZ MAULION
APPLICANT