Antony Selva Goodwin
QC Engineer
B.E. graduate in Mechanical discipline with CSWIP 3.1 having 5+ year of experience on QA/QC, Fabrication & Welding, Pipe Spool, Tank, Skid & steel structures with different internationalities.
Personal Info
Experience
Address
Feb-2016 -
QC Engineer
SE, Saranam Apartments,
Present
Arabian International Company, KSA
3rd cross street, LIC colony,
• Review of Material Test Certificates for Raw Materials &
Pammal, Chennai-75
Consumables
• Preparation of Inspection test plan.
Mobile No
• Preparation of draft WPS, qualifying the PQR and authentic
WPS in accordance with code (AWS,ASME,EN) requirements,
client specification and document the same
Mobile No
• Coordinating with clients & projects of approval of documents
• Preparation of Quality requirement for Delivery
• Preparation & Presentation of Critical to Quality to cross
functional teams.
• Fit-up inspection as per the drawing / Bill of material.
adh64o@r.postjobfree.com
• Qualifying welders/welding operator for SAW, SMAW and
Date Of Birth
FCAW process as per ASME, AWS, EN Standards.
• Daily Monitoring of consumable storage and baking.
18-06-1992
• Monitoring of welding machine & portable oven calibration, up
Passport Number
to date.
• Monitoring welding process as per WPS.
M1976994
• Visual inspection of weld joints for weld profile, weld defect
after post weld cleaning.
Languages
• Ensuring weld repair is done as per WPS.
• Witnessing DPT, MT, UT on Weld Joints as per ITP.
Tamil
• Interpretation of radiography film.
• Final Dimension inspection.
Proficient
• Coordinating with third party inspectors for dimension, welding
English
and final inspection.
• Final dimension inspection (shell alignment, Flatness, Tilt,
Proficient
Ovality).
Malayalam
• Preparing NCR for Non-Conformance with specification &
preparing corrective action to be taken.
Good
• Preparation of dimension report.
Hindi
• Preparation of stage inspection reports as per ITP.
• Coordinating with client during quality walk.
Good
• Handling Saudi Aramco, ASME & other Client audits..
Telugu
• Witnessing hydro test.
Good
• Preparing hydro test reports.
• Painting visual inspection
• Conducting bolter test & peel off test
• DFT checking after final touch up & before delivery
Page 1 of 3
Strengths
•Team sprit
•Positive attitude.
•Self-motivated
•High level of dedication
Key Skill
•WPS Preparation
•ITP Preparation
•Preparation & Handling of
Audits
•Sound Knowledge in construction codes like AWS D1.1, ASME Sec IX, ASME Sec VIII, AISC,EN,API 650, API 582 codes
•Customer Handling
•Root Cause Analysis
•Leadership skill
•Presentation & interpersonal skill
July-2014- QC Engineer
Nov-2015 Excel Element Engineering Pvt. Ltd., India
•Assembly and Dimension inspection of Steel structure and pipe spool fabrication based on approved drawing & bill of materials.
•Review of Material Test Certificates for Raw Materials like
Pipes, Fittings, Flanges & Welding Consumables
•Conducting Welder Qualification Tests with client representative and preparation & issue welder ID cards for qualified welders
•Piping spools fit up inspection, material traceability records maintenances, joint nos. weld nos. records
•Inspecting the weld fit-up of joints prior to root pass & visual inspection of final weld, conducting applicable NDT test on welding joints
•Witnessing of Mechanical tests (Hydro test) & Interpretations of NDT tests like RT, UT, MT, and PT.
•Radiographic film interpretations
•Wrapping and Coating Inspection, Witnessing for Holiday test and Peel off test.
•Handling of Customer Complaints
Interest
•Football
•Movies
•Silambam
Education
2010 -2014 Madha Engineering College
B.E. Mechanical Engineering with 7.3 CGPA
Certification
2014 Vibrant NDT service Pvt. Ltd.
ASNT Level II in PT, MT, VT, UT, RT
2014 Cadam Technologies
Certification course in AutoCAD, Anysis, ProE, CATIA
2020 TWI Training and Examination Services
Certification Scheme for Personnel - CSWIP 3.1 (Cert. # 401684)
Projects Handled
Project Name : Riyadh Metro Project – Architecturally Exposed Steel Structure - Canopy
Client Name : ARRIYADH NEW MOBILITY
Customer : Permasteelisa
Project Name : Waad Al Shamal ISCC Power Plant
Client Name : Saudi Electrical Company
Customer : SPX Dry Cooling
Page 2 of 3
Project Name : Yamma Cement Plant
Client Name : ThyssenKrupp Saudi Arabia Contracting Ltd.
Customer : ThyssenKrupp Saudi Arabia Contracting Ltd.
Project Name : KNPC-New Refinery Project at AL-Zour
Client Name : HSS JV (Hyundai + Saipem + SK)
Customer : HSS JV (Hyundai + Saipem + SK)
Project Name : Saudi Arabian Oil Company
Client Name : Jazan IGCC Power Block Project
Customer : SEPCO Group Saudi Arabia LLC
Project Name : Jazan Refinery & Terminal Project
Client Name : Saudi Aramco
Customer : Tecnicas Reunidas
Project Name : Kuwait International Airport Project
Client Name : Limak Insaat Kuwait SPC
Customer : Ministry of Public Works - Kuwait
Project Name : SABIC Jubail Main Building
Client Name : Shapoorji Pallonji Middle East (LLC)
Customer : SABIC
Project Name : Oman Botanic Garden
Client Name : Larsen & Tubro (Oman) LLC
Customer : Diwan of Royal Court
Project Name : Halliburton Multichem Batch Plant
Client Name : Fluor Arabia Limited
Customer : Halliburton
Project Name : King Abdullah International Garden
Client Name : Zaid Al Hussain Brothers & Group Contracting
Customer : DAR (Dar Al-Handasah)
Project Name : Mansourah Massarah Gold Project
Client Name : OUTOTEC SAUDI ARABIA LLC
Customer : MA'ADEN - SAUDI ARABIAN MINING COMPANY
Project Name : Mansourah Massarah Gold Project
Client Name : Larsen & Tubro
Customer : MA'ADEN - SAUDI ARABIAN MINING COMPANY
Declaration
I assure that all the data furnished above are true to the best of my knowledge and belief.
Yours Sincerely
(Antony Selva Goodwin)
Page 3 of 3
Project
Customer:
Mansourah Massarah Gold Project MA’ADEN GOLD AND BASE METALS (MA’ADEN)
Title:
PRE-QUALIFICATION
GOLD PROCESSING PLANT
APPROVAL OF M/s AIC STEEL
Q.C ENGINEER – TANK MANUFACTRURING
Mr. ANTONY SELVA GOODWIN
Document Number:
Revision:
Revision Date:
Status:
MD-216-1000-QD-QA-PQR-1025
A01
18.06.2020
ISSUED FOR APPROVAL
L&T Document Number:
O19045
001
X
K
00500
072
R0
REVISION HISTORY
Rev
Date
Revision Text
Prepared By
Reviewed By
Approved By
Employer
A01
18.06.2020
FIRST ISSUE
PS-AIC
KE-L&T
ESS-L&T
Sensitivity: LNT Construction Internal Use