Post Job Free
Sign in

Manager Civil Engineering

Location:
Rome, Italy
Posted:
October 12, 2020

Contact this candidate

Resume:

Curriculum Vitae

Name: Stephen Jackson Tel: +1-242-***-****

+44-778*-******

E-mail: adgvlr@r.postjobfree.com

Age: 50

Qualifications: City & Guilds – Carpentry & Joinery

Types of Projects: Reinforced concrete frames and ground works for Design & Build,

Commercial, Residential, Industrial buildings.

Bridges, fly-overs, culverts for road and motorway construction

Preferred Work: Permanent, full-time employment

Marital Status: Married

Notice Period: 1 Month

Qualifications:

East Midland Education Council, 1982 – 1986

City & Guilds – Apprenticeship in Carpentry & Joinery Craft

Courses / Training:

CSCS – Formwork Industry Accreditation B

CSCS – Civil Engineering Industry – Site Supervisor Industry Accreditation

CITB – Working at Heights – Level 2 – Site Management Pass

Safety Training Services – Confined Spaces, Deep Excavations, Permits to Work

OSHA – Construction Health & Safety – 30 Hr Occupational Health&Safety Course

Employment History:

Dates: Jan 2015 – Present

Employer: Woslee Dominion Construction

Position: Site Manager

Duties & Responsibilities:

Reporting to Project Manager, overseeing the construction of 8-storey commercial and residential reinforced concrete structures at Albany Marina.

Dates: Jul 2010 – Dec 2014

Employer: Northfield Construction Ltd., U.K.

Position: Site Manager

Duties & Responsibilities:

Returned from abroad to work for Northfield in the same capacity as previously stated (see below 2001 - 2006).

Dates: January 2009 – July 2010

Employer: Tom Jones International Limited, Cayman Islands

Position: Site Manager, Clifton-Hunter School

Duties & Responsibilities:

Reporting to Project Manager, construction of 7 reinforced concrete buildings, project value CI$ 75M. These blocks were design-led architecture. Supervision of 3 foremen and local labor force of up to 180 men. Including Health & Safety, Attending progress meetings, purchasing local material organization of men/material/plant, supervising subcontractors.

Dates: April 2006 – December 2008

Employer: Hadsphaltic International Limited, Cayman Islands

Position: General/Structures Foreman, Camana Bay

Duties & Responsibilities:

Reporting to Project Manager, overseeing construction of a new town center. Completed 8 out of 13 reinforced concrete commercial and residential 2, 3 and 5-storey blocks. These blocks were design-led architecture, value of project CI$ 150M. Supervision of subcontractor with a local labor force of up to 100 men, Attending progress meetings, implementing Health & Safety, purchasing local material, organization of men/material/plant, supervising subcontractors.

Dates: Aug 2001 – March 2006

Employer: Northfield Construction Ltd., U.K.

Position: Site Manager/General Foreman

Duties & Responsibilities:

Reporting to the Manager and accountable for the close control and supervision of all trades and labor engaged upon the construction of reinforced concrete frames (some Steel and R/C combinations) and structures, coordinating and implementing Health & Safety on site, over see excavation works, ordering of materials, liaising with contractors on site, organization of plant, liaise with main contractor, attending progress meetings, review of progress and checking quality of workmanship.

General Forman on extensive array of projects including:

RC Frames 4 Storey Commercial / Apartment block in Nottingham

Multi-Storey Car Parks 3-Level Underground Car Park, Nottingham

Shopping Centers 2-Storey, Nottingham

Underground Structures Basement Car Park

Swimming Pool

Retaining Walls

Public Buildings 2-Storey Museum Complex, Lincoln

Formwork Systems used Doka Panels

Ishebeck Soffit Systems

A-Frame System for single-sided concrete walls

Peri Formwork

Symonds Formwork

Dates: Feb – Aug 2001

Employer: O’Rourke Construction, U.K.

Position: Foreman Joiner

Duties & Responsibilities:

Reporting to the General Foreman and accountable for the ‘hands on’ execution of carpentry work coupled with the effective supervision of a team of carpenters and joiners engaged in the scheme. Also accountable for checking quality of workmanship, overseeing safety and liaison with the main contractors of the following projects:

Project: Capital One Head Office, Nottingham

Construction of a 5-storey reinforced concrete frame office block with associated lift cores and stairwells. Formwork systems used included:

Timber column shutters

Table soffits

Pre-cast circular columns

Dates: Jan 2000 – Feb 2001

Employer: Carillion Construction, U.K.

Position: Foreman Joiner

Duties & Responsibilities:

Accountable to the Section Foreman for the “hands on” construction, control and supervision of carpenter and joiners. Accountable for the control of materials, checking quality of work, site safety and client liaison. Formwork systems used included:

Project: A6 Leicester Bypass

Construction of 8no over bridges with associated wing walls and retaining walls. Also worked on a railway bridge-strengthening scheme in Birmingham City Center. Formwork systems used included:

Timber shutters designed by Carillion

Traditional RMD formwork

Dates: Jan – Dec 1999

Employer: RAMCO Subsidiary, Azerbaijan

Position: Site Supervisor

Duties & Responsibilities:

Construction works of the Vice-Presidential ‘Dacha’ or Mansion. Project comprised of the construction of 4-storey reinforced concrete buildings and stairwells together with internal aspects such as doors and windows. Supervision and training of local labor force.

Dates: Aug – Dec 1998

Employer: Hepworth Construction, Azerbaijan

Position: Site Supervisor

Duties & Responsibilities:

Engaged on a variety of projects including the internal and partial demolition of existing building and refurbishment and conversion to form new Bars, Restaurants and Retail premises.

Dates: Mar – Aug 1998

Employer: Norwest Holt

Position: Charge hand Joiner

Duties & Responsibilities:

Construction of 6-level reinforced concrete car park with associated stairwells and ramps. Formwork systems used: Doka system, Pre-cast concrete floor sections

Dates: 1997 – 1998

Employer: PC Harrington’s, Reading, UK

Position: Charge hand Joiner

Duties & Responsibilities:

Initial contract comprised of the construction of a 4-storey reinforced concrete framed laboratories and testing block for Astra Zeneca. Upon completion, transferred to the construction of the Oracle shopping complex in the center of Reading, comprising a 5-storey reinforced concrete frame with associated lift cores and stairwells. Formwork systems used:

Table soffit system with pods

Timber pile cap shutters

Peri system for lift and stair shafts

Dates: 1995 – 1997

Employer: Tarmac, UK

Position: Subcontract Joiner

Construction of 6no. large over-bridges, culverts and associated structures on the Derby By-Pass. Formwork systems used:

Tarmac-designed timber and RMD shutter system

Dates: 1994 – 1995

Employer: Clugston Construction, UK

Position: Subcontract Joiner

Construction of various tanks and structures on a new sewage treatment works in Shepshed. Formwork systems used:

Timber and RMD, self-designed

Dates: 1992– 1994

Employer: Germany

Position: Self-Employed

Various contracts in Berlin, Leipzig, Halle

Dates: 1986 – 1992

Position: Self-Employed

Carpenter and joiner on building and construction sites.



Contact this candidate