Curriculum Vitae
Name: Stephen Jackson Tel: +1-242-***-****
E-mail: adgvlr@r.postjobfree.com
Age: 50
Qualifications: City & Guilds – Carpentry & Joinery
Types of Projects: Reinforced concrete frames and ground works for Design & Build,
Commercial, Residential, Industrial buildings.
Bridges, fly-overs, culverts for road and motorway construction
Preferred Work: Permanent, full-time employment
Marital Status: Married
Notice Period: 1 Month
Qualifications:
East Midland Education Council, 1982 – 1986
City & Guilds – Apprenticeship in Carpentry & Joinery Craft
Courses / Training:
CSCS – Formwork Industry Accreditation B
CSCS – Civil Engineering Industry – Site Supervisor Industry Accreditation
CITB – Working at Heights – Level 2 – Site Management Pass
Safety Training Services – Confined Spaces, Deep Excavations, Permits to Work
OSHA – Construction Health & Safety – 30 Hr Occupational Health&Safety Course
Employment History:
Dates: Jan 2015 – Present
Employer: Woslee Dominion Construction
Position: Site Manager
Duties & Responsibilities:
Reporting to Project Manager, overseeing the construction of 8-storey commercial and residential reinforced concrete structures at Albany Marina.
Dates: Jul 2010 – Dec 2014
Employer: Northfield Construction Ltd., U.K.
Position: Site Manager
Duties & Responsibilities:
Returned from abroad to work for Northfield in the same capacity as previously stated (see below 2001 - 2006).
Dates: January 2009 – July 2010
Employer: Tom Jones International Limited, Cayman Islands
Position: Site Manager, Clifton-Hunter School
Duties & Responsibilities:
Reporting to Project Manager, construction of 7 reinforced concrete buildings, project value CI$ 75M. These blocks were design-led architecture. Supervision of 3 foremen and local labor force of up to 180 men. Including Health & Safety, Attending progress meetings, purchasing local material organization of men/material/plant, supervising subcontractors.
Dates: April 2006 – December 2008
Employer: Hadsphaltic International Limited, Cayman Islands
Position: General/Structures Foreman, Camana Bay
Duties & Responsibilities:
Reporting to Project Manager, overseeing construction of a new town center. Completed 8 out of 13 reinforced concrete commercial and residential 2, 3 and 5-storey blocks. These blocks were design-led architecture, value of project CI$ 150M. Supervision of subcontractor with a local labor force of up to 100 men, Attending progress meetings, implementing Health & Safety, purchasing local material, organization of men/material/plant, supervising subcontractors.
Dates: Aug 2001 – March 2006
Employer: Northfield Construction Ltd., U.K.
Position: Site Manager/General Foreman
Duties & Responsibilities:
Reporting to the Manager and accountable for the close control and supervision of all trades and labor engaged upon the construction of reinforced concrete frames (some Steel and R/C combinations) and structures, coordinating and implementing Health & Safety on site, over see excavation works, ordering of materials, liaising with contractors on site, organization of plant, liaise with main contractor, attending progress meetings, review of progress and checking quality of workmanship.
General Forman on extensive array of projects including:
RC Frames 4 Storey Commercial / Apartment block in Nottingham
Multi-Storey Car Parks 3-Level Underground Car Park, Nottingham
Shopping Centers 2-Storey, Nottingham
Underground Structures Basement Car Park
Swimming Pool
Retaining Walls
Public Buildings 2-Storey Museum Complex, Lincoln
Formwork Systems used Doka Panels
Ishebeck Soffit Systems
A-Frame System for single-sided concrete walls
Peri Formwork
Symonds Formwork
Dates: Feb – Aug 2001
Employer: O’Rourke Construction, U.K.
Position: Foreman Joiner
Duties & Responsibilities:
Reporting to the General Foreman and accountable for the ‘hands on’ execution of carpentry work coupled with the effective supervision of a team of carpenters and joiners engaged in the scheme. Also accountable for checking quality of workmanship, overseeing safety and liaison with the main contractors of the following projects:
Project: Capital One Head Office, Nottingham
Construction of a 5-storey reinforced concrete frame office block with associated lift cores and stairwells. Formwork systems used included:
Timber column shutters
Table soffits
Pre-cast circular columns
Dates: Jan 2000 – Feb 2001
Employer: Carillion Construction, U.K.
Position: Foreman Joiner
Duties & Responsibilities:
Accountable to the Section Foreman for the “hands on” construction, control and supervision of carpenter and joiners. Accountable for the control of materials, checking quality of work, site safety and client liaison. Formwork systems used included:
Project: A6 Leicester Bypass
Construction of 8no over bridges with associated wing walls and retaining walls. Also worked on a railway bridge-strengthening scheme in Birmingham City Center. Formwork systems used included:
Timber shutters designed by Carillion
Traditional RMD formwork
Dates: Jan – Dec 1999
Employer: RAMCO Subsidiary, Azerbaijan
Position: Site Supervisor
Duties & Responsibilities:
Construction works of the Vice-Presidential ‘Dacha’ or Mansion. Project comprised of the construction of 4-storey reinforced concrete buildings and stairwells together with internal aspects such as doors and windows. Supervision and training of local labor force.
Dates: Aug – Dec 1998
Employer: Hepworth Construction, Azerbaijan
Position: Site Supervisor
Duties & Responsibilities:
Engaged on a variety of projects including the internal and partial demolition of existing building and refurbishment and conversion to form new Bars, Restaurants and Retail premises.
Dates: Mar – Aug 1998
Employer: Norwest Holt
Position: Charge hand Joiner
Duties & Responsibilities:
Construction of 6-level reinforced concrete car park with associated stairwells and ramps. Formwork systems used: Doka system, Pre-cast concrete floor sections
Dates: 1997 – 1998
Employer: PC Harrington’s, Reading, UK
Position: Charge hand Joiner
Duties & Responsibilities:
Initial contract comprised of the construction of a 4-storey reinforced concrete framed laboratories and testing block for Astra Zeneca. Upon completion, transferred to the construction of the Oracle shopping complex in the center of Reading, comprising a 5-storey reinforced concrete frame with associated lift cores and stairwells. Formwork systems used:
Table soffit system with pods
Timber pile cap shutters
Peri system for lift and stair shafts
Dates: 1995 – 1997
Employer: Tarmac, UK
Position: Subcontract Joiner
Construction of 6no. large over-bridges, culverts and associated structures on the Derby By-Pass. Formwork systems used:
Tarmac-designed timber and RMD shutter system
Dates: 1994 – 1995
Employer: Clugston Construction, UK
Position: Subcontract Joiner
Construction of various tanks and structures on a new sewage treatment works in Shepshed. Formwork systems used:
Timber and RMD, self-designed
Dates: 1992– 1994
Employer: Germany
Position: Self-Employed
Various contracts in Berlin, Leipzig, Halle
Dates: 1986 – 1992
Position: Self-Employed
Carpenter and joiner on building and construction sites.