CONTACT
Baghbanpura Lahore Pakistan.
ad5puw@r.postjobfree.com
Profile
Highly recognized in the
community, I can meet the
challenges that your company
will entrust me. I am a
recognized expert in the field
of Boiler Engineering.
SOFTWARE
Windows 7, 8, Windows
Server, MS word, Excel
Outlook Express
INFORMATIONS
Languages: English,
Urdu, Hindi, Punjabi.
driving license.
HOBBIES
Books Reading, Outdoor
Gamed Internet
21 Years working experience 1995-2016
1 year worked as a Mechanical Maintenance Engineer with Flying Art Paper Mills Lahore.
4 years worked as a mechanical & Boiler Maintenance Engineer with Style Enterprises (Pvt) Ltd., Lahore.
3 year worked as a Utility Maintenance & Operation Supervisor with Kohinoor Oil Mills Limited, Kala Shall Kaku.
3 year worked as a Power House & Utility Supervisor widi Rupafab Limited Lahore.
Currently working as a Boiler Engineer & Mechanical Incharge with SUFI OIL EXTRACTION PLANT (PVT.) Ltd. Lahore
Graduation 2010
Allama Iqbal Open University.
MATRICULATION 1989
Lahore Board
Technical Education
Three Years Diploma in Associate Engineer
Mechanical) from Govt, College of Tech. Lahore.
Third Class Boiler Engineer from Govt, of the Punjab. Experience
Education
OBJECTIVE
To pursue a career in a progressive organization that will provide opportunities for career growth and professional development and also in order to grooms overall personality. Akhlaq Ahmad
Flying Art Paper
Mills
Year
One Year worked as a Mechanical Maintenance Engineer.
Pulp circulation pump's over-hauling single empeller, Carbon seal change, Coupling Bush Change, and installation of new joints.
Changing Paper Rolling Drum shaft and installation of bearings.
All water circulation pump, bearing and empellers.
Over-hauling.
Complete over-hauling of Steam Boiler Package type, Water side, De-Scaling and Fire side cleaning, Feeding Water Pump Empeller, Overhauling, Feed water Check-valve and water gauge glass fully overhauling.
Nozzle type Burner-Fully over-hauling, Oil Pump (Burner) Oil sealChanging etc.
Responcibilities & Duities
Style Enterprises
(Pvt.) Limited
Lahore
Year
4 year worked as Mechanical & Boiler Maintenance Engineer.
All dyeing hall machine, water circulation pump, Bearings changing and greasing etc.
Drier drums bearings and pulley changing.
Package type Boiler's complete D-scaling, Fire Side Cleaning.
Water circulation pump fitting (new).
Change the Boiler's Tubes, after Cutting both end, tube (Boiler's) expanding and welding
Water Softening Plant. Opened the water softening drum, re filled new resins. Nozzle type Burner-fully over-hauling also burner oil pump bearings Kohinoor Oil Mills
Limited Kala Shah
Kaku
Year
3 years worked as a Utility Maintenance & Operation Supervisor.
Cross Drum water tube Boiler. For annual inspection, over-hauled completely water side and fire side, water valves cleaning, boiler's refectory repaired. F.D. fan over- hauling, changed the bearings.
Feed Water Pump, Water Gauge Glass, and Feed Water Check-valve.
Safety valve, Stop Valves-fully over-hauled and new joints.
Air Cooled Air Compressors: Air end seals changed, Oil cooler, Air Cooter-fully overhauled and all Selonite valves Cleaning, air drier water line and air line cleaning and Selonite valves cleaning.
Rupafab Limited
Lahore
Year
3 Years worked as a Power House & Utility Supervisor.
Thermo Oil Boiler-fully over-hauling, fire side cleaning. Nozzle type burner folly over-hauling, oil stainer and oil filter cleaning. Thermo Oil expansion tank oil filling, expansion tank oil pump overhauling, thermo oil circulation pump-Oil seal and bearing changed and also empellers changed.
Steam Boiler Package type Made ready for annual inspection, Fire side tubes cleaning, Flew cleaning, all excellries over-hauling
Air Compressor Water Cooled Over-hauling-Water cooler, air cooler, Oil pump separator and all Salonite valves cleaning, air filter cleaning, oil filter changed.
Chiller Water Circulation Pump Over-Hauling.
Water Turbine Shaft changed
Trepple Em
(Pvt.) Limited
Lahore
Year
As a Boiler Engineer & Mechanical In charge
Potato Elevator, Gear Box Over-Hauling, Changing all the part and new oil filling
Washer real drum complete Over-Hauling, also Over-Hauling of Gear Box, and Bearings and Oil seal change.
Peanut drier pulley and Bearing change also Belt changed.
Over conveyer Over-Hauling.
All Air Blower Bearing and Belt changer All Gear Box Over-Hauling and Oil Changed.
Year
Thermo Oil Boiler-fully over-hauling, fire side cleaning. Nozzle type burner folly over-hauling, oil stainer and oil filter cleaning. Thermo Oil expansion tank oil filling, expansion tank oil pump overhauling, thermo oil circulation pump-Oil seal and bearing changed and also empellers changed.
Steam Boiler Package type Made ready for annual inspection, Fire side tubes cleaning, Flew cleaning, all excellries over-hauling
Air Compressor Water Cooled Over-hauling-Water cooler, air cooler, Oil pump separator and all Salonite valves cleaning, air filter cleaning, oil filter changed.
Chiller Water Circulation Pump Over-Hauling.
Water Turbine Shaft changed
Sufi Oil Extraction
Plant (PVT) Ltd.
Lahore
NISHAT CHUNIAN
RAIWIND MANGA
MAN ROAD
Year
As a Utility Incharge
Thermo Oil Boiler-fully over-hauling, fire side cleaning. Nozzle type burner folly over-hauling, oil stainer and oil filter cleaning. Thermo Oil expansion tank oil filling, expansion tank oil pump overhauling, thermo oil circulation pump-Oil seal and bearing changed and also empellers changed.
Steam Boiler Package type Made ready for annual inspection, Fire side tubes cleaning, Flew cleaning, all excellries over-hauling
Air Compressor Water Cooled Over-hauling-Water cooler, air cooler, Oil pump separator and all Salonite valves cleaning, air filter cleaning, oil filter changed.
Chiller Water Circulation Pump Over-Hauling.
Water Turbine Shaft changed
Chain Grande Coal Boiler Chain Repair & Opration
Bazuki Oil Boiler
ANGRO FOOD
SAHIWAL
Year
As a Bio Mass Boiler Incharge
New Boiler install and Furnces and ID fan, FD fan, Cyklon & Water Scriber and all Pump Canver install anr opration.
UNILEVER
BHI PHERO
Year
As a Bio Mass Boiler Incharge
New Boiler install and Furnces and ID fan, FD fan, Cyklon & Water Scriber and all Pump Canver install anr opration.