Post Job Free

Resume

Sign in

Electrical Power Plant

Location:
Jeddah, Mecca, Saudi Arabia
Posted:
April 13, 2024

Contact this candidate

Resume:

CURRICULUM VITAE

MUHAMMAD ADNAN

ASGHAR

CHAK#*99GB TEHSIL SUMMANDRI DISTRICT FAISALABAD

P/O BOX # SAME

Cell # 009****-*******, 009****-*******

Passport # BD1820413

SKYPE ID# adnan.wartsila

IQAMA# 241*******

SAUDI ARAIBA ADDRESS:

NCC1 (NAJRAN CEMENT COMPANY)

CELL#+966*********,

ad4y7u@r.postjobfree.com

OBJECTIVE:

To work and grow with a prestigious organization that offers growth opportunity. Where the efficient and hard working people with vision are mattered and where talent is considered as a competitive edge over competitors.

Personal Details:

Father’s Name

ALI ASGHAR

CNIC No.

33105-6286041-7

Date of Birth

01-05-1988

Marital Status

Married

Domicile

Faisalabad (Punjab)

Nationality

Pakistani

Religion

Islam

Languages

English, Urdu,

Driving License

LTV

Educational Qualification:

Degree

Division/CGP

Year

Board / University

B.Tech (Hons)

Electrical Power Engrr.

3.4

2012

Preston university

B.Tech (Pass)

Electrical Power Engrr.

2.9

2010

Preston university

D.A.E (Electrical)

1st

2007

P.B.T.E Faisalabad

Matriculation

1st

2004

B.I.S.E. Faisalabad

Professional Grooming:

By the stroke of luck I opened the account of my professional grooming with the erection of the power plant Unit, which different organizations. Tasks which were performed during the tenure of erection are as following.

Arrangement of lighting with concealed wiring was accomplished and connections were made.

Erection of the H.T. Panels and 11 KV Connections were made.

Installation of L.T. Panels and main power cables were laid in the trenches according to electrical layout.

Power supply from L.T. Panels was assured to the electrical panels of the machine in all sections.

Electrical circuitry and connections were completed inside the panels according to diagrams and with the assistance of erectors of the brands.

Distribution panels were installed in every section in secondary supply to the machines in all sections.

Experience History:

ELECTRICAL TECHNICAN / SHIFT ENGINEER (APRIL 2016 TO TILL) WARTSILA SAUDI ARABIA.

NCC1 (NAJRAN CEMENT COMPANY) SAUDI ARABIA.

70MW POWER PLANT.

HFO Fire Wärtsilä Engine (18V32) & UNIC-C1

Got acquainted with 72K,48K,24k,4k,1.5k,1k,0.5k planned maintenance activity of HFO Fire Wärtsilä Engine (18V32) & UNIC-C1.

UNIC –C1 (Modification fuel demand reference wiring lay out and commissioning done.

(Modification Techo failure Alarm wiring lay out and commissioning done.

18V32 All DG turbine washing unit installed and wiring lay out also commissioning done.

ELECTRICAL TECHNICAN (JUNE 2013 TO APRIL 2016). WARTSILA PAKISTAN

200MW POWER PLANT.

Got acquainted with 72K,48K,36k,24k,4k,1.5k,1k,0.5k planned maintenance activity of HFO Fire Wärtsilä Engine (18V46).

Preventive maintenance of ABB,AVK Alternator,L1,L2,L3 done.

Preventive maintenance of ABB Alternator, Dresser rand Steam turbine,JEUMOUNT Steam Turbine Alternator, SIEMENS Power Transformer,SF6 Breaker

Performed STG Alternator CO2 cleaning.

Calibration of various sensors and valves using FLUKE744, Oil Bath calibrator, pressure transmitter simulation using FLUKE744,pt100 simulation using FLUKE744 and oil bath calibrator, thermocouple simulation using FLUKE744, I/P Converter simulation & Calibration (AMOT VALVE)With process Calibrator( Fluke 744).

Overhauling of motors, meggering using FLUKE TESTER, Critical Motors Vibration analysis using Fluke 810 tester

Switch Yard Annual Maintenance ( Relay Testing using FREJA, Thermography using Fluke TI 25

I Have participate Completely Maintenance of 132KV Switch yard .

Performed switchyard Thermal Imager Test (with Fluke TI 32)

Performed DGA Test of Transformer.

Performed IR test of Transformer.

Understanding of Control room operation and various operational activities

Studied drawings, developed trouble shooting skills, Learnt various safeties and interlocking necessary for smooth plant operation

Keenly observed various parameters and Trends of Complex from WOIS and WISE.

Developed understanding of Safety protocols (LOTO system)

Actively participated in all the training sessions

Assisted in various managerial activities from time to time Ensuring timely & effective preventive maintenance

Reviewing and maintaining electrical related inventory and raising purchase

Preparation of Monthly metering reports, budget, Engine Start Stop reports

Understand and follow the Annual Operating/Maintenance Plan (Refer Engine Equipment operating hours)

Ensure spares planning / availability of spares as per maintenance plan

Perform consumables planning with optimized inventory levels

Perform the Risk Assessment prior to start the work

Regularly inspect the maintenance tools & ensure calibration

Prepare maintenance plan with O&M Manager

Discuss the Risk Assessment & Safety procedures with team.

Distribute the job to each employee.

Observe & ensure each employee using the PPE

Review the work progress at the end of the day & ensure the progress is as per plan.

Perform analysis, troubleshooting & maintenance work to solve complex O&M problems

Read Technical bulletin & equipment catalogue to enhance the knowledge.

Perform the Fire Mock Drill with team members.

Arrange training on safety flash.

ASSIT-ELECTRICAL TECHNICAN 01- Aug-2008 TO 01-May-2013

SITARA TEXTILE INDUSTRIES FAISALABAD

Completed operation and maintenance of generator.

VCB, ACB, MCB, Testing Repairing, Checking of opening and closing of coils.

Maintenance of transformer up to 90MVA, 65MVA, 132KV/15KV.

Update of polarization Index.

Worked with Siemens for DGA test, Meggering of transformer & Resistance testing.

Dielectric test of transformer oil & silica gel replacement

CRO 01-Aug-2007 TO 01-May-2008

MGM CORPORATION PVT (LTD) FEROZWATTON

Operate 5 numbers of JGS-320 & GENBACHER CATERPILLER Gas Engines.

Check all engine parameters including temperatures, pressures and level gauges. Check the battery chargers, ignition timing of the engines and maintaining the gravity of DC-Batteries.

Check and control of water levels in cooling towers and maintaining their proper cleaning by using Hypo Ragia and HCl.

Check and control operations of engines like pre-lubing, starting, synchronization and taking the readings of load variations.

Check and maintain different parameters during operations like exhaust temperatures, auxiliary and jacket water temperatures etc.

Perform 2000, 6000 Hours scheduled maintenance along with ORIENT ENERGY Team.

Calculate the power generator KW/Hr, gas units and SFC (Specific Fuel Consumption).

EHS Proficiency:

Performing Maintenance under work permit procedure.

To check the safety level of entire staff.

Ensure all hazardous area before starting the maintenance jobs.

Ensure all safety measures before starting the maintenance.

Professional Trainings:

First Aid & Fire Fighting Training by Wartsila Head Office Pakistan

Health Safety & Environment Training by Wartsila Head Office Pakistan

Wartsila Saudi Arabia Arrange Basic First Aid and CPR with AED by ASTC (Saudi safety Training centre.)

Certificate Number: AS0029636

Completion Date : 26-july-2016

Troubleshooting & System Working.

Chemical Handling Works (Electrical Department).

Computer & Language Skills:

Proficient in the using MS Word, Excel, Power Point and Outlook.

Expert in using Windows Vista, 7, XP and 2000 and working with common and company software.

Reading, writing, listing and speaking English, Urdu and Punjabi fluently.

ACHIEVEMENTS

ACHIEVEMENTS AND AWARDS:

Awarded a shield of Best performance by GM Wartsila Pakistan for outstanding performed in Annual switch yard maintenance



Contact this candidate