Loai Abdulal[i]
Pleasant hill, Iowa
ad4r8w@r.postjobfree.com 515-***-****
Education
Beirut Arab University of Lebanon, September 2011-July 2015
Bachelor of Mechanical Engineering Beirut, Lebanon
Experience
Microsoft 2019-current
Critical environment technician manager
Consolidated Contractors Company (CCC) Piping Engineer
February 2017 – March 2018 Harweel and Khazaan Block 61 BP/Petrofac Projects Harweel, Oman
CCC is the largest construction company in the MENA region, with 130K employees and revenue of USD 5.3B
Managed a group of over 100 personnel including piping supervisors, charge hands and welders. Main responsibility was to establish the pipeline network to various equipment including miscible gas injection compressors, oil heaters and condensate stabilizers
Managed and coordinated the installation of the gas field's Central Processing Facility for the Rabab Harweel integrated project’s pipelines, a project valued at 1.25B USD, handling approximately 4.9 million cubic meter/day of sweet gas production. Ensured the install was completed within budgetary and temporal constraints.
Coordinated with Petrofac, PDO, and BP engineers to ensure the installation of approximately 60K meters of Khazaan/Harweel pipelines were performed per project specifications.
Consolidated Contractors Company Equipment Engineer
December 2015 – February 2017 Khazzan, Block 61 BP/Petrofac Project Khazzan, Oman
Managed and coordinated portion of construction of the Khazzan Central Processing Facility, overseeing the installation of equipment such as stabilizers, filters, and overhead cranes, ensuring installation was completed within budgetary and time constraints.
Worked on installing flare packages ranging from 35-100 meters in length at a broad spectrum of gas pressures, completing the installation one month ahead of schedule.
Consolidated Contractors Company Preservation Engineer
August 2015 – November 2015 Khazzan, Block 61 BP/Petrofac Project Khazzan, Oman
Coordinated between Petrofac, BP engineers, and various vendors to ensure the mechanical and electrical components followed storage, preservation and protection requirements.
Monitored and reported any deficiencies or changes to the contractual scope based on variations in equipment and procedural documentation.
Inspected components previously installed by the equipment division during construction of the Khazzan Central Processing Facility, to ensure quality followed specifications.
Mount Lebanon Power Station Mechanical Engineering Intern
November 2014 – December 2014 Bissri, Lebanon
Started a project to study the health and efficiency of the centrifugal pumps to minimize power disruption for the city of Bissri.
Strength/Skills
Demonstrated expertise across all mechanical engineering functional disciplines of Oil & Gas (Piping, Preservation, Equipment).
Facilitate communication between and within both governmental and private enterprises.
Excellent knowledge of AutoCAD, Autodesk Inventor, and Microsoft Office
Ability to multitask and independently balance workload and priorities
[i] U.S Permanent Resident