Post Job Free

Resume

Sign in

Project Manager Construction Management

Location:
Texas
Salary:
120,000
Posted:
March 31, 2024

Contact this candidate

Resume:

RESUME OF

CRAIG WILLIAM CLEVENGER

Education & Certifications

*US Army, Certification on CH-47 Chinook, F-4, F-16, C-130 and Black Hawk maintenance.

*Certificate/10Hr OSHA

*Completed three semesters to date: Construction Management at ITT-Tech

*GPA 3.8

*Certified installer, Kraft Maid Cabinets

*Certified Installer, Armstrong Flooring

* Lighting for interior surfaces, AIA program # AB0017

* Certified installer. KM Roof Coatings. Acrylic roof applications

* Member of the Toastmasters International

* Procore Heat related Hazards training

* Procore Silica exposure training

*Fall arrest training certificate

*Ariel and scissor lift training certificate

*Forklift operations training certification

*Osha standards scaffold certification

TBRE/City of Temple Texas

Senior Superintendent

October 2021 through December 2023

Responsible for all aspects of construction from demolition to reconstruction/finish out. Verification of sub-contractor scope of work, RFI’s, ASI’s, On site coordination. I acted as the sole representative for the Owner/General Contractor on this 26-million-dollar project consisting of approximately 75K Sq., Ft. which encompasses the historical restoration and conversion to Apartments of one 9 story Hotel, one 624 seat theater both built in 1929 and another building consisting of 28 new apartments and 6 commercial lease spaces.

The management of this project included acting in most aspects as the project manager, contact for all subs, the city, the Architect, the Historical Representative and all other necessary communication and coordination for all three properties.

Clevenger Construction Company

12-1-19 through 10-1-21

Owner as well as Project Manager, Estimator, Superintendent, and self-performing Contractor working for the City of Waco, Texas Faciality’s Construction Division

.

Built Wright Construction

Superintendent

6-1-17 through 11-14-19

Responsible for all aspects of superintendent responsibility to include job site management, scheduling, RFI’s, submittals, daily reports, safety reports, safety training, A&O Meetings, plan reviews\/resolution, etc.

THE CITY OF EAGLE PASS, TEXAS

CONTRACT PROJECT MANAGEMENT.

December 2017 through May 2018

Project Manager

When DSA was terminated from their contract with the city in December 2017, the City Manager/council requested I stay on and take over all project operations. This included all coordination of contractors, RFIs, Submittals, communications with the Architect. Value engineering. Scheduled updates with the City and all parties involved. Plan issue resolutions, Safety, scheduling

DSA INC. CONSTRUCTION MANAGEMENT

207 NORTH RIDGEWAY, CLEBURNE TEXAS,

JUNE 2016 THROUGH DECEMBER 2016

817-***-****

Senior Project Superintendent for an 8.5-million-dollar Public Safety Complex located in Eagle Pass, Texas. Responsible for all aspects of onsite construction management.

Graceland portable buildings

220 Business Hyw 67

Cleburne, Texas

March 24th, 2014 to 2017

Independent contractor responsible for scheduling, delivering materials, complete construction, and collection of funds. This contract covers a 160-mile radius of Cleburne, Texas

ACS Partners LLC

312 South Atlanta Street, Roswell, Ga, 30075

8-8-2013 to 1-17-2014

Project Manager over Rent to own residential properties in Dallas, Ft Worth, Houston and Charlotte. Managed all aspects of construction from award to sign off.

Project Manager over Multifamily (Richmond, VA) and High-rise renovation (Saint Louis University).

Trinity Inn Suites Hotel

2000 Beach Street, Ft Worth, Texas, 76103

7-1-2012/8/1/2013

Project Manager

Managed all aspects of the 320-room hotel cost evaluation, demolition and reconstruction and cost analysis for new owner.

Acting maintenance Engineer

Coronado Construction, LLC.

1931 Myrtle, El Paso, Texas, 79901

11-28-2011/4-5-2012

*Construction Manager.

* Provided Construction management for six properties. This included company documentation, Project evaluations, Estimating, Contractor coordination/supervision. Performed Contract negotiations. Pay applications.

Mc Arch Construction

550 S. Mesa Hills, Suite D-2, El Paso, Texas, 79912

10-17-2010/11-27-2011

*Senior Project Superintendent.

* The General Contractor asked Construction Enterprises Owner if they could hire me from them to take over the project after the previous Superintendent resigned.

* Duties included direct supervision of all aspects required to complete this LEED project. Daily reports, safety reports. Requesting and performing inspections. Negotiating with sub-contractors, Scheduling and Material management.

Construction Enterprises, Inc.

1155 Westmoreland, Suite 100, El Paso, TX. 79925

4-2009/10-17-2010

*Chief Superintendent and estimator.

Duties included Supervision of framing crews, Exterior finish crews, Drywall crews, attended weekly job site meeting on behalf of the company. Provided daily reports and performed safety meetings/documentation. Interpreted drawings and inspected all aspects from layout to completion. This was an adult day care rehab project (LEED)

Tradesman International 7-200*-*-****

*Performed a wide range of construction services. Some of these services included: Framing, Painting (Spray and Roll), Drywall, Texture, Metal Building Erection, Dropped Ceilings, Plumbing, Concrete, Site Grading, Tenant Finish and Equipment Operator.

C.R.S. Building Systems 2002-2007

*Performed estimating and value engineering

*Managed a sixty thousand square foot shop

*Managed up to sixty employees

*Handled contracts, payment draws and documentation between the GC and CRS Building Systems

*Managed and scheduled materials and labor procurement

*Responsible for compiling all company documentation using Quick Books Pro and Microsoft Office Pro

*Contracted and performed Division 6 framing projects up to One Hundred Thousand square feet and three stories in height.

Lowe’s Home Improvement Warehouse: 1998-2002

*Subcontractor for the East Texas Market

*Installed a variety of products offered through installed sales. Some of these

Included Doors, Windows, Appliances, Electrical Fixtures, Plumbing Fixtures,

Flooring (Tile, carpet, hardwood, laminate), Countertops (New and re-

Laminate), Fencing.

*Coordinated scheduling of labor, materials and installation between Lowe’s, Clevenger Construction, and the customer.

Lackland Air Force Base: 1997

*Senior Superintendent for Division 6 Del Sol, a Sub-Contractor to Hunt Building

Corp. of El Paso, Texas.

*Managed and scheduled all aspects of Division 6 construction on this project.

Frankie and Hoy Herrin: 4000 Square Foot Custom Home: 1996

*As Clevenger Construction Company we managed, and self-performed all

Aspects of removing an existing home from the site, new home site work, Utilities, concrete foundation/slab, framing, electrical, plumbing, HVAC, drywall, tape and bed, trim, painting, flooring, custom built cabinets, hardware, asphalt drive, exterior finishes and decks.

Fort Bliss Lower and Upper Beaumont Project: 1996

*Installed finish trim for Division 6 Del Sol (El Paso, TX)

*Installed trim, doors, stairs, cabinets, etc.

Fletcher Bright Corp. Atlanta GA.: 1995

*As Clevenger Construction, we performed a 250,000 square foot renovation in Mt. Pleasant, Texas. This project included the abatement of asbestos. The Demolition of all interior walls, flooring, ceilings, electrical, HVAC, plumbing and roofing materials. The installation of all new services, (Mechanical, Plumbing, HVAC). The complete tenant finishes out for Hastings records, Hibbett’s Sports, Radio Shack, Burks Dept. Stores etc. Recap and stripping of the parking lot. New torch down roof, HVAC units. Effis store front system and exterior finishes.

*This project was completed ahead of schedule

Clevenger Construction Company: 1989-2002

*Contracted and self performed all aspects of residential and commercial

Construction projects...

. U.S. Army: 10/1983-10/1991

*MOS 67U Medium Helicopter Repair

*Cross trained on F-4, F-16, C-130 and Black Hawks

The above projects are but a few of the types, scopes and details surrounding the over Forty years of experience I have acquired. I possess a complete working knowledge of how to both read and develop drawings as well as the proper applications of most of the construction field.

Goals:

Obtain the LEEDS Associate’s Certification, obtain my Private Pilot’s License, and Continue to increase my education in Construction Management.

Contact Information:

Address: 405 HCR 1414, Blum, Texas, 76627

Phone #: 1-817-***-****

E-Mail: ad4on9@r.postjobfree.com

References:

> Bobby Harrelson Sr.-Harrelson Brick and Masonry

1-702-***-****

Bobby Harrelson Jr.-Harrelson Brick and Masonry

1-210-***-****

Steve Wade-W.E. Electric-Elm Mott, Texas, 1-254-***-****

Jessie ARENIVAS Jr.-Alamo Architect-San Antonio, Texas, 1-210-***-****

Mike Malone-Alamo Architects-Owner. San Antonio, Texas, 1-210-***-****

Chad Parsons- The City of Temple, Temple, Texas.

1-254-***-****

Larry Gildersleeve—Principal partner @ ACS Partners LLC 1-678-***-****

Rickey Henry-Built Wright Construction-Project Manager-254-***-****

Rita Spinks-Built Wright Construction-PM Assistant-325-***-****

Loui Dobin-Director at Green Family Camp-254-***-****

Randy Strumbeck-Architect at MRG Group-254-***-****

Thomas Austin-Facilities Manager at the City of Waco-254-***-****

Art Rodriguez- City of Eagle Pass City Manager

956-***-****

Jeff Wendelin. VP of operations ACS Partners LLC

1-434-***-****

Edward McCormic of McCormic Arch. 915-***-****

Antonio Maese-CNU-A for McCormic Architecture

1-915-***-****

George Torrez of Affordable Dumpsters 915-***-****

Miguel Jamie of Texas Construction Enterprises

915-***-****

Hugh Moore Retired attorney/General Contractor 817-276-004

Julie Ward—Property Manager at Lindell Towers, St Louis, MO Office--1-314-***-****---Cell#--1-573-***-****

Jim Bullock of Vector Floors 806-***-****

Nancy Day of Trinity Inn Suites 817-***-****

David Cerna of Division Six Builders 915-***-****

Steve Calking of Cornerstone 915-***-****

Gary Berricchoa of Build a Bed 817-***-****.

Mr. Moreno of Moreno Mechanical 915-***-****

Izzy Payon of NEB Elect. 915-***-****

Victor Gutierrez-Vice President of LJA Engineering, Corpus Christie Texas---361-***-****

Rogelio Hernandez-Architect at Gignac and Associates, Corpus Christie, Texas 361-***-****

Able Garcia-Owner of RAFSA Construction-Eagle Pass, Texas 830-***-****

Louis Stock-Owner of Alvin Stock underground Utilities

Eagle Pass, Texas 830-***-****



Contact this candidate